Installation of a MIDEA EVOX G3 1.5 ton electric furnace with central Air Handler system in Le Sud-Ouest, Montreal

AirGreen installs a MIDEA EVOX G3 1.5-ton electric furnace in Le Sud-Ouest, with careful integration into the central system, existing ducts, and compact mechanical room.

By AirGreen Climatisation & Chauffage Admin9 min read
Installation of a MIDEA EVOX G3 1.5 ton electric furnace with central Air Handler system in Le Sud-Ouest, Montreal
Installation of a MIDEA EVOX G3 1.5 ton electric furnace with central Air Handler system in Le Sud-Ouest, Montreal
Generic diagram: central heat pump, indoor module and ducts

In summer, the outdoor unit rejects the house's heat outside.

Generic illustration of this type of installation, not a survey of this job site. Tap a number.

  1. It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.

  2. The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.

  3. A shut-off switch near the outdoor unit isolates it safely for service.

  4. Sitting on the indoor module, it moves heat between the house air and the refrigerant.

  5. Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.

  6. Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.

  7. It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.

  8. It runs the heat pump and the backup heat. It must be compatible with the installed system.

A compact, neat central installation designed to maximize comfort in a confined mechanical space

In the South-West district of Montreal, AirGreen carried out the installation of a MIDEA EVOX G3 1.5 ton electric furnace, integrated into a central system with an air handler. This type of project requires particular attention, as it's not simply a matter of replacing a unit: the equipment must be adapted to the existing ductwork, clearances checked, proper airflow ensured, and a clean, durable installation delivered that is easily accessible for future maintenance.

For this installation, the mechanical space was relatively tight, with several elements already in place: metal ducts, return air, electrical supply, control wiring, drainage piping, and limited access due to an adjacent door. This type of configuration is common in Montreal properties, particularly in dense neighborhoods like South-West, where mechanical rooms are often optimized down to the last centimeter.

Our objective was clear: to install a MIDEA EVOX G3 central electric furnace in a stable, secure manner, harmonized with the existing infrastructure, while maintaining reasonable access to service panels and important components.

Why choose a MIDEA EVOX G3 1.5 ton electric furnace?

The MIDEA EVOX G3 range is particularly appealing to homeowners seeking a modern, reliable central solution well-suited to residential needs. In this specific case, the choice of a 1.5 ton size perfectly matched the building's requirements: sufficient capacity to ensure efficient air distribution, without unnecessary oversizing.

Oversized central equipment can lead to short cycling, poor dehumidification, and premature wear. Conversely, an undersized unit can run continuously without achieving the desired comfort. This is why, at AirGreen, we always assess the actual context before recommending a machine: area, insulation, duct configuration, heat loss, equipment location, and usage habits.

In this South-West installation, the MIDEA EVOX G3 1.5 ton offered an excellent balance of performance, compactness, and compatibility with the existing network.

A narrow mechanical room: the detail that changes everything

The installation photo clearly shows the reality on the ground: the unit is placed between the metal ductwork and a very limited side space, with a door in immediate proximity. This type of environment requires rigorous planning.

Our technicians had to pay attention to several elements:

  • the exact positioning of the electric furnace;
  • alignment with the plenum and existing ducts;
  • protection of wiring and control lines;
  • access to service panels;
  • proper sealing of ventilation connections;
  • management of flexible and metal ducts around the unit.

Poor installation in this type of space can quickly cause problems: vibration, noise, air restriction, difficult access for HVAC maintenance, or even loss of efficiency in the distribution network.

We therefore worked with precision to ensure that the system was not only functional but also clean and logical for future interventions.

The importance of connecting to existing ducts

When installing a central system in a Montreal property, the duct network plays as important a role as the machine itself. Even an excellent unit can deliver disappointing results if the ducts are poorly connected, improperly sealed, or incorrectly sized.

In this project, the existing metal ducts were already in place, but their integration with the new furnace had to be carried out with care. We paid particular attention to junctions, transitions, and sections where air can easily lose pressure.

Good connection allows for:

  • better air distribution throughout the rooms;
  • a reduction in efficiency losses;
  • less noise in the ducts;
  • more stable performance in both heating and ventilation;
  • a more predictable lifespan for the system.

This approach is essential, whether the installation is carried out in South-West, Laval, Longueuil, on the North Shore or on the South Shore.

An HVAC installation focused on precision, durability, and service accessibility

A central air handler: more than just a mechanical box

An air handler, or air treatment unit, is the heart of distribution in a central system. It pushes air into the ductwork and ensures constant circulation throughout the house. In a configuration with a MIDEA electric furnace, it becomes a crucial element for daily comfort.

In this installation, the central unit had to be integrated into an already crowded structure. We therefore ensured a clear layout around the components, especially for the front panel, wiring, and connections.

This care is important because a central system must remain accessible. Maintenance, diagnosis, or inspection should never become unnecessarily complicated due to an overly cramped or poorly designed installation.

Mistakes to avoid during a central installation

Many homeowners initially compare brands and prices, but sometimes underestimate the importance of the installation itself. In the HVAC field, the quality of on-site work directly influences the actual performance of the equipment.

Here are mistakes we systematically avoid:

Installing without checking clearances

A poorly positioned appliance can block access to service panels or make future interventions long and costly.

Neglecting duct sealing

Air leaks in connections reduce system efficiency and can create temperature disparities between rooms.

Poor cable management

Exposed, taut, or disorganized wiring increases the risk of damage and complicates diagnostics.

Ignoring airflow

Airflow must be consistent with the unit's capacity. Poor circulation can affect comfort, noise, and system longevity.

Choosing a capacity without analysis

A 1.5 ton electric furnace may be ideal in a specific context, but the choice must always be validated according to the building.

A tailored solution for homeowners in the South-West

The South-West borough includes a wide variety of buildings: recent condos, renovated plexes, townhouses, industrial conversions, and older properties. This diversity makes every HVAC installation unique.

In some projects, the main challenge is space. In others, it's existing ducts, electrical access, noise, ventilation, or compatibility with an already installed system. For this MIDEA installation, the main issue was clean integration into a compact mechanical room.

Our team therefore adapted its approach to the reality of the building rather than applying a generic method.

The role of maintenance after installation

Once a central electric furnace is installed, maintenance becomes essential to maintain good performance. The filter must be checked regularly, ducts must remain clean, and accessible components must be inspected according to the system's needs.

Good HVAC maintenance helps to:

  • preserve airflow;
  • reduce unnecessary consumption;
  • limit dust accumulation;
  • extend equipment lifespan;
  • quickly detect anomalies.

At AirGreen, we always consider maintenance from the installation phase. A well-placed, well-connected, and accessible machine is easier to keep in good condition.

MIDEA EVOX G3: A Relevant Central Option in Montreal

MIDEA holds an important place in the residential market thanks to modern, efficient equipment well-suited to current needs. For a central project like this one, the MIDEA EVOX G3 1.5 ton represents an interesting solution when the goal is to modernize indoor comfort without completely transforming the existing infrastructure.

In areas like Montreal, Laval, Longueuil, the North Shore, and the South Shore, we regularly install systems where compatibility with existing ducts becomes an essential criterion. A good machine must be well-chosen, but above all, well-integrated.

This installation in South-West demonstrates the importance of precise work: the machine is compact, access is limited, the ducts are close together, and every connection must be carefully considered.

A client experience focused on clarity

For this type of project, we always explain the important steps to the client before and during installation. This includes the unit's capacity, location, mechanical constraints, service access, and precautions to take after startup.

This transparency avoids unpleasant surprises. It also allows the owner to understand why certain technical decisions are made on-site: a slight adjustment to the connection, additional protection around a cable, a transition modification, or an extra airflow check.

In the case of this MIDEA EVOX G3 electric furnace installation in the South-West, the final result is a clean, well-integrated system consistent with the available space.

AirGreen's Expertise in Central Systems

AirGreen installs heat pumps, electric furnaces, wall-mounted air conditioners, central systems, and multi-zone solutions throughout the greater Montreal area. Our expertise is not limited to placing a unit: we analyze the entire environment.

For a central system, this means understanding:

  • the logic of the duct network;
  • static pressure;
  • mechanical clearances;
  • electrical constraints;
  • the quality of distributed air;
  • the building's actual needs;
  • access to components after installation.

This approach allows us to deliver durable and professional installations, whether in South-West, Laval, Longueuil, on the North Shore, or on the South Shore.

A clean, functional, and durable result

The result of this installation is a MIDEA EVOX G3 1.5 ton electric furnace that is well-positioned, correctly connected to the central network, and carefully integrated into a compact mechanical room. The metal ducts, connections, wiring, and panel access have all been taken into account to ensure reliable use and simpler maintenance.

This type of project perfectly illustrates the difference between a quick installation and a well-thought-out one. In the HVAC field, both visible and invisible details matter: alignment, sealing, accessibility, airflow, safety, and finish.

For homeowners considering a central HVAC installation in Montreal, this project in South-West demonstrates the importance of calling on a team capable of combining technical expertise, adaptation to the building, and a commitment to quality workmanship.

The steps

How it goes, from the first call to the end

The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

Step 1 of 9The on-site estimate

We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.

  1. The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
  2. The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
  3. Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
  4. The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
  5. The outdoor unitOn a level base, raised above the snow, with free space all around.
  6. The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
  7. Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
  8. Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
  9. The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
Your numbers

And at your place?

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Size checkYour electric furnace, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Check the indoor module's filter.
    • Clear winter debris from the outdoor unit.
    • Test cooling before the heat arrives.
    And at your place?

    Which type of equipment for your project?

    Pick what looks like your need.

    Mistakes avoided

    Four mistakes we do not make

    Flip each card to see what we do instead.

    Frequently asked questions

    What people ask us about this kind of work

    11 questions
    Can I keep my current ducts?
    Often, yes: the central heat pump connects to the existing ducts. We check their condition and size during the estimate.
    What happens in extreme cold?
    The indoor module (furnace or air handler) works with the central heat pump and takes over in extreme cold.
    Furnace, air handler, ducted: what is the difference?
    The furnace or air handler is the indoor module of the central system. A ducted system hides in the ceiling: all you see are small supply grilles.
    Are there grants?
    Depending on the equipment and your situation, assistance programs may apply. AirGreen checks the exact combination before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city. See permits and by-laws, and we check for your address.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Will my current thermostat work?
    Not always: the thermostat has to run the heat pump and the backup heat. We check compatibility during the estimate.
    Central or wall units: which one?
    If the house has ducts in good shape, a central system heats and cools every room at once. Without ducts, wall units or a multi-zone are often simpler. We compare on site.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.
    Going further

    Useful pages for what comes next

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    Tell us about your house. We come and see it for free.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment