Commercial HVAC: your building doesn’t need a catalogue. It needs the right system.
Answer five questions and see which equipment families fit, who does what, and how much Hydro-Québec can pay: up to 90% of eligible costs for a small business.
Maximum Efficient Solutions funding on eligible costs.
Maximum for Rates M, G9, L and LG.
Three measures from different categories in one project.
Five answers, a clear picture of your project.
Pick what looks most like your building. The picture updates with every click: systems to consider, what we do, what goes to a licensed partner, and the funding available.
Guidance only: the site visit and a load calculation confirm the equipment.
Hydro-Québec can pay up to 90% of your heat pump. Here are the rules.
The Efficient Solutions Program has two streams, and your rate decides which one applies. Air-source, variable refrigerant flow (VRF) and geothermal heat pumps are eligible.
Three categories, for example: heat pump, heat recovery, building automation.
Maximum the program allows for this cost
$12,515
Grocery store. Funding example published by Hydro-Québec for heat pumps.
$276,220
Residential building. Example published by Hydro-Québec.
$362,975
School. Example published by Hydro-Québec.
From the site visit to start-up: who does what, in order.
Six steps. Click each one to see what happens and who is responsible.
We come see the building
Roof access, electrical panel, existing ducts, nameplates of the units in place. The photos and model numbers are used later for the Hydro-Québec file.
Everything in writing before the work
Before starting any work, we always send a final offer: exact model, work included, and what goes to a licensed partner if there is one.
The right stream, at the right time
Small businesses: the request is filed after installation, with the OSE tool in force when the work started. Medium and large, custom path: the Project Proposal must be accepted before you start.
Our crews, our licences
Installation, electrical hookup and start-up under our subclasses 15.10 and 16. The law reserves work on a refrigerant circuit to holders of the environmental qualification attestation (s. 43).
What Hydro-Québec asks for
Itemized invoices per measure, spec sheets and serial numbers. The halocarbon work register is kept for at least 5 years (ss. 59-60).
Stay compliant, avoid downtime
A unit of 20 kW or more must undergo a periodic leak check (s. 22). A maintenance plan also avoids breakdowns in peak season.
Sixteen equipment families, from a simple wall mini split to a VRF system.
A small office or shop often needs just one wall heat pump; a whole building calls for ducts, a rooftop unit or VRF. The families commercial clients ask for most come first; filter by your space. Each sheet gives capacity, efficiency, refrigerant and warranty (sheet counts as of September 23, 2026). Not sure? The configurator points you in the right direction.
Wall heat pump (mini split)
One unit on the wall, one outside: the simplest option
Ideal for Small offices, shops, salons, practices, break rooms
See the sheetsVRF system
Variable refrigerant flow, several zones on one circuit
Ideal for Partitioned offices, clinics, schools, hotels
See the sheetsPackaged heat pump
All-in-one, 2 to 12.5 tons, connected to ducts
Ideal for Open-plan stores, warehouses, workshops, restaurants
See the sheetsMulti-zone heat pump
One outdoor unit for 2 to 8 rooms, each set on its own
Ideal for Office suites, clinics, daycares, shops with a back room
See the sheetsCeiling cassette
4-way airflow, recessed in the ceiling
Ideal for Stores, meeting rooms, cafés
See the sheetsCentral heat pump
Outdoor unit and indoor cabinet, on the existing ducts
Ideal for Offices and shops that already have ducts; also as an “add-on” to an existing furnace
See the sheetsDucted unit
Hidden in the ceiling, air comes out through grilles
Ideal for Shops, offices, clinics where the unit must disappear
See the sheetsPTAC
Through-the-wall heat pump, room by room
Ideal for Hotels, residences, individual offices
See the sheetsHRV and ERV air exchanger
Filtered fresh air, heat recovered
Ideal for Small offices, daycares, clinics, closed premises
See the sheetsConsole and floor-ceiling
On the floor or under the ceiling, no drop ceiling needed
Ideal for Stores with a finished ceiling, storefronts, older premises
See the sheetsElectric furnace and air handler
The cabinet that pushes air through the ducts, matched to the heat pump
Ideal for Replacing an old electric furnace, or ducted heating with no combustion
See the sheetsCommercial dehumidifier
Humidity control, connected to ducts
Ideal for Warehouses, archives, commercial basements; pools and rinks (Thermoplus Air SECARR)
See the sheetsWall air conditioner
Cooling only, for a space that is already heated
Ideal for Baseboard-heated spaces that get too hot in summer: offices, shops, meeting rooms
See the sheetsVTAC
Vertical closet unit, with backup heat
Ideal for Hotel suites, apartments, offices with a mechanical closet
See the sheetsHumidifier
On the ducts, keeps the air humid enough in winter
Ideal for Museums, archives, print shops, clinics, offices with dry winter air
See the sheetsThermostat
Programmable: heats and cools around your business hours
Ideal for Rooftop units, central systems, spaces with set opening hours
See the sheetsSwipe to see the other families →
Boiler, hydronic radiant floor, gas burner
This work falls under other RBQ subclasses (hydronics, gas). A contractor licensed in those subclasses takes care of it; the heat pump, ventilation and electrical work stay with us.
Two rules your equipment must follow, checked for you.
The first comes from Québec and covers any unit that contains refrigerant. The second comes from the City of Montréal and covers large buildings and new construction.
Is your unit 20 kW or more?
Indicative conversion (1 t = 12,000 BTU/h = 3.517 kW). Go by the nominal capacity stated by the manufacturer. Source: CQLR c. Q-2, r. 29, up to date as of May 1, 2026.
What the City requires of your building
City of Montréal rules only. Laval, Longueuil and other cities have their own by-laws: see our Permits and by-laws page.
Six details that cost a lot when you find them too late.
Your sector has its own page, with its own constraints.
Restaurant, server room, clinic or warehouse: each page covers the issues specific to that sector.
The questions building managers ask us.
What licences does AirGreen hold for commercial work?
RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration (air conditioning, heat pumps) and 16 Electrical. Gas, oil and hydronic work falls under other subclasses: a licensed partner takes care of it.
Which Efficient Solutions stream applies to my business?
Your Hydro-Québec rate decides. Rate G or Flex G: Small Businesses stream. Rates M, G9, L or LG: Medium and Large Businesses stream. Rate G covers a minimum billing demand under 65 kW.
Do I need Hydro-Québec’s approval before the work?
In the Small Businesses stream, the request is filed after installation. In the Medium and Large stream, the custom path requires a Project Proposal accepted before work starts; the simplified path goes through the OSE tool.
Does Hydro-Québec really pay 90%?
That is the maximum in the Small Businesses stream: you pay at least 10% of eligible costs. The actual amount is calculated measure by measure with Hydro-Québec’s OSE tool.
Is a VRF system eligible?
Yes. Hydro-Québec lists variable refrigerant flow heat pumps among the models supported by Efficient Solutions, along with air-source and geothermal heat pumps.
My rooftop unit runs on gas. Can you replace it?
We install the electric packaged heat pump that replaces it, with its electrical hookup. Disconnecting the gas supply is done by a licensed gas contractor.
My building is 2,500 m² in Montréal. What do I have to report?
By-law 21-042 covers buildings of 2,000 m² or more, or with 25 or more units. You report the previous year’s energy consumption by June 30, every year.
Who has to get the leak check done?
The owner of a unit of 20 kW or more. The check is done by a worker holding the environmental qualification attestation, and recorded in a register kept for at least 5 years.
Do you install PTACs for hotels and residences?
Yes: 100 PTAC spec sheets online (Amana, Trane, Friedrich, Gree and others) and 14 Friedrich VTAC sheets for closet units.
Where are you located?
Montréal–Laval office at 4951 Sainte-Catherine East, and South Shore showroom at 1370 rue Joliot-Curie, unit 712, in Boucherville. Monday to Thursday 8 a.m. to 6 p.m., Friday 8 a.m. to 4 p.m.
One point of contact, from the site visit to start-up.
Send us your configurator summary: we come see the building, then you receive a written final offer before any work.
- Hydro-Québec, Efficient Solutions Program — participation guide, Small Businesses stream (French), March 2026
- Hydro-Québec, Efficient Solutions Program — participation guide, Medium and Large Businesses stream (French), March 2026 (program amended March 31, 2026)
- Hydro-Québec, “Financial support for energy-efficient equipment” and “Heat pumps” (Efficient Solutions), consulted September 23, 2026
- Hydro-Québec, Rate G — minimum billing demand under 65 kW, consulted September 23, 2026
- Regulation respecting halocarbons, CQLR c. Q-2, r. 29, ss. 5, 11, 22, 43, 59-60, up to date as of May 1, 2026
- City of Montréal, By-law 21-042 on the disclosure and GHG rating of large buildings, page updated September 8, 2026
- City of Montréal, ban on combustion heating appliances in new buildings, page updated September 12, 2025; Zero-emission buildings by 2040 roadmap, updated March 4, 2026
- Régie du bâtiment du Québec, description of subclasses (heating, ventilation, refrigeration), September 2017
- airgreen.ca spec sheets (product metafields) and number of sheets per collection as of September 23, 2026
Amounts shown are caps or published examples; only Hydro-Québec confirms the funding granted, project by project. The tools on this page give guidance, not a design: the site visit confirms the equipment choice.
Information intéressante pour vos travaux de Climatisation, Ventilation & Chauffage (CVC) Commercial
-
AirGreen Climatisation & Chauffage AdminWhy Is Poor Air Conditioning Really Driving Your Best Employees to Quit? (Exclusive Study)
-
AirGreen Climatisation & Chauffage AdminLogistics Warehouses: How Efficient Air Conditioning Directly Reduces Losses of Fragile Products
-
AirGreen Climatisation & Chauffage AdminCosmetic Industry: How Inadequate Air Conditioning Can Compromise the Quality of Your Products
-
AirGreen Climatisation & Chauffage AdminRenovating a historic building: How this Montréal museum met the challenge of invisible air conditioning
-
AirGreen Climatisation & Chauffage AdminCall Center Industry: How Optimized Ventilation Directly Improves Your Financial Performance
-
AirGreen Climatisation & Chauffage AdminElectronics Industry: How to Avoid Catastrophic Losses Due to Insufficient Air Conditioning
-
AirGreen Climatisation & Chauffage AdminHow These Québec Companies Are Reducing Their Carbon Footprint with Innovative HVAC Systems
-
AirGreen Climatisation & Chauffage AdminReal Case: How a Montréal Factory Avoided a Total Shutdown Thanks to a Perfectly Prepared Emergency Ventilation System
-
AirGreen Climatisation & Chauffage AdminThe 5 Common Lies About the Energy Efficiency of Commercial HVAC Systems
-
AirGreen Climatisation & Chauffage AdminWhy Does Your New HVAC System Break Down So Often? 4 Common Installation Traps You Absolutely Must Avoid
-
AirGreen Climatisation & Chauffage Admin5 Signs Your Discreetly Faulty Commercial Ventilation Is Already Ruining Your Image with Customers
-
AirGreen Climatisation & Chauffage AdminThermal Insulation Error: How a Montréal Business Lost $10,000 in Unnecessary Heating Costs
Certaines de nos Réalisations dans le Grand Montréal!
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Laval: Preventive Maintenance of a Rooftop System for an Office Building
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Laval: Retrofit of an Allied Rooftop System for an Office Building
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Laval: Refurbishment and securing of the ductwork network for a retail business
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Longueuil: Retrofit of a central ventilation system for a multi-functional building
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Montreal: Complete retrofit of a rooftop system for an industrial building
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Montreal: Maintenance and inspection of a retail store ventilation system
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Longueuil: Replacement of a Carrier heat pump for an administrative building
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Laval: Preventive Maintenance of a ThermoPlus System in a Multi-Tenant Building
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Laval: Replacement of an aging condenser for a residential condominium
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Laval: Preventive Maintenance of a ThermoPlus System in a Multi-Tenant Building
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Montreal: Retrofit of a centralized ventilation system in a retail store
-
AirGreen Climatisation & Chauffage AdminCommercial HVAC in Longueuil: Retrofit of a ducted system for an office building