Project

Installation of a MIDEA EVOX G3 2.5 Ton Electric Furnace in Baie-D’Urfé: Central System with Air Handler for Reliable and Well-Integrated Comfort

AirGreen installs a MIDEA EVOX G3 2.5-ton electric furnace in Baie-D’Urfé: central system, air handler, adapted ducts, and professional HVAC finish.

By AirGreen Climatisation & Chauffage Admin13 min read
Installation of a MIDEA EVOX G3 2.5 Ton Electric Furnace in Baie-D’Urfé: Central System with Air Handler for Reliable and Well-Integrated Comfort
Installation of a MIDEA EVOX G3 2.5 Ton Electric Furnace in Baie-D’Urfé: Central System with Air Handler for Reliable and Well-Integrated Comfort
Generic diagram: central heat pump, indoor module and ducts

In summer, the outdoor unit rejects the house's heat outside.

Generic illustration of this type of installation, not a survey of this job site. Tap a number.

  1. It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.

  2. The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.

  3. A shut-off switch near the outdoor unit isolates it safely for service.

  4. Sitting on the indoor module, it moves heat between the house air and the refrigerant.

  5. Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.

  6. Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.

  7. It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.

  8. It runs the heat pump and the backup heat. It must be compatible with the installed system.

A MIDEA Central Installation Designed for Precision, Mechanical Space, and Residential Performance

In Baie-D'Urfé, our AirGreen team recently completed the installation of a MIDEA EVOX G3 2.5-ton electric furnace, configured as a central system with an air handler. This type of equipment is particularly sought after in the West Island of Montreal, where many residences already have a duct network but require significant modernization of their indoor unit to improve comfort, airflow, and the overall efficiency of the HVAC system.

In this project, the installation was not simply about placing a new unit in a mechanical room. It involved neatly integrating the MIDEA air handler into an existing duct network, ensuring a careful connection to the refrigerant lines, planning for reliable condensation drainage, respecting service clearances, and achieving a professional finish in a relatively compact technical space.

The project photo clearly shows the result: a vertically installed MIDEA indoor unit, connected to the existing metal plenum, with insulated refrigerant piping, a well-aligned copper line, a neatly assembled PVC condensation drain, and a solid base to keep the unit stable and accessible.

Why a MIDEA EVOX G3 2.5-ton electric furnace for this residence in Baie-D'Urfé?

The choice of a MIDEA EVOX G3 2.5-ton air handler met several specific client needs:

  • improving air distribution in the house;
  • replacing or modernizing a central indoor component;
  • retaining the use of the existing duct network;
  • preparing the system for efficient heating and cooling performance;
  • obtaining a clean, durable, and easy-to-maintain installation.

A 2.5-ton capacity often corresponds to medium-sized homes, but at AirGreen, we never rely solely on a general rule. The correct capacity always depends on several factors: area, insulation, solar orientation, number of floors, duct configuration, thermal losses, usage habits, and compatibility with the outdoor unit.

In this specific case, the MIDEA EVOX G3 unit offered an excellent balance between comfort, reliability, parts availability, and performance for a Baie-D'Urfé residence. The EVOX G3 range is also appreciated for its integration into modern central systems, especially when an owner desires a discreet solution, without visible wall units in living areas.

Careful Integration into the Existing Duct Network

One of the most important aspects of this HVAC installation was the connection to the duct network. In the photo, the large metal duct adjacent to the unit is clearly visible, with a plenum manufactured and adjusted to ensure an efficient transition between the air handler and the home's air distribution.

This type of work requires particular attention. A poor transition between the appliance and the duct can lead to:

  • pressure losses;
  • excessive noise;
  • uneven air distribution;
  • decreased efficiency;
  • vibrations;
  • premature wear of certain components.

Our team therefore worked with precision to create a stable, airtight, and well-adapted connection to the existing configuration. The metal joints were carefully sealed to limit air leaks, a detail often overlooked in some installations, but one that directly influences comfort and energy performance.

In areas like Montreal, Laval, Longueuil, the North Shore, and the South Shore, we regularly see central systems where the equipment performs well on paper but is poorly utilized due to poorly adapted ducts. That's why our approach is never limited to just installing the machine: we analyze the entire system environment.

The Challenge of Mechanical Space: Clean Installation Without Compromising Access

The mechanical room presented a relatively tight space, with open wooden walls, a substantial main duct, and several existing technical elements. In this type of context, the most common mistake would be to install the unit too quickly, without considering future access for HVAC maintenance.

We therefore positioned the MIDEA air handler to preserve access to service panels, connections, the drain, and internal components. This decision is crucial, as an installation that is difficult to maintain quickly becomes more costly for the owner.

A good HVAC installer must always think of the technician who will return in one, two, or five years to perform maintenance, check the coil, inspect connections, replace a filter, or diagnose an electrical component.

Refrigerant Piping and Insulation: A Visible, but Especially Essential Detail

In the photo, the insulated refrigerant line descends neatly along the appliance, accompanied by a well-positioned copper line. This work is more important than it seems. Poor insulation or a poorly protected line can cause efficiency losses, undesirable condensation, or premature deterioration of surrounding materials.

Our team paid particular attention to:

  • line alignment;
  • mechanical protection;
  • insulation quality;
  • finishing near connections;
  • reducing stress on connections.

For a central electric furnace combined with a heat pump, the quality of refrigerant connections plays a direct role in the performance of the entire system. A clean, straight, and well-insulated installation also facilitates future inspections and reduces the risk of corrective intervention.

Condensate Drain: Clean and Accessible Drainage

The PVC drain visible at the base of the unit was assembled to provide clear and structured condensation drainage. In a central system, this point is essential, especially during cooling periods, when moisture extracted from the air must be properly evacuated.

Poor drainage can lead to:

  • water leaks;
  • odors;
  • safety shutdowns;
  • floor damage;
  • accumulation of dirt in the line;
  • avoidable service calls.

We therefore installed an accessible condensate line, with a configuration allowing for better inspection. This detail reflects our philosophy at AirGreen: a successful installation must be efficient on the day it is commissioned, but also easy to maintain throughout its lifespan.

What this Baie-D'Urfé Project Demonstrates About a Good Central System Installation

The Importance of Not Treating an Electric Furnace as a Simple Replacement

A common mistake is believing that an air handler can be replaced like a standard appliance, without considering the existing network. In reality, each residence has its peculiarities. In Baie-D'Urfé, as in many homes in the West Island, mechanical rooms may have been modified over the years, with ducts added, adjusted, or adapted according to old equipment.

Before finalizing the installation, our team checks several elements:

  • compatibility between the appliance and the outdoor system;
  • unit orientation;
  • connection to return and supply air;
  • quality of the existing plenum;
  • required clearances;
  • drainage;
  • filter access;
  • electrical supply;
  • base stability;
  • refrigerant line protection.

This preparatory work helps avoid unpleasant surprises and ensures a consistent result. A central HVAC installation should never be improvised.

MIDEA EVOX G3: A Relevant Choice for Residential Central Systems

The MIDEA brand is taking an increasingly important place in the residential HVAC market in Quebec. For homeowners in Montreal, Laval, Longueuil, the North Shore, and the South Shore, it often represents an interesting option when looking for a good balance between technology, accessibility, efficiency, and availability.

The EVOX G3 model in a central configuration is designed to work with a ducted system, offering uniform comfort throughout the house. Unlike a wall-mounted air conditioner or wall-mounted heat pump which primarily treats one zone, a central system distributes air through the existing network, allowing for a more homogeneous temperature from room to room.

For a residence like the one in Baie-D'Urfé, this approach is particularly relevant when owners wish to maintain a clean interior aesthetic, without visible units on the walls.

Subsidies and Eligibility: A Point to Verify According to the Installed Combination

MIDEA central systems can, depending on the exact combination of indoor and outdoor units, be eligible for certain subsidy programs like Hydro-Québec's LogisVert. However, eligibility always depends on the precise pairing, model numbers, capacity, certified performance, and conditions in effect at the time of application.

At AirGreen, we help our clients verify these elements before installation to avoid false expectations. For this type of project, it's important not to rely solely on the brand or capacity. Two similar systems can have different eligibility depending on their AHRI combination.

That's why we always recommend validating:

  • the exact model of the indoor unit;
  • the exact model of the outdoor unit;
  • BTU capacity;
  • AHRI certification;
  • subsidy program requirements;
  • required documents for the application.

This rigor is essential for homeowners comparing several central heat pump or complete HVAC system options.

The Role of Finish in System Durability

A successful installation is often recognized by its details. In this project, the finish around the plenum, the unit's positioning, the pipe arrangement, and the cleanliness of the drain demonstrate structured work. These details are not just aesthetic. They directly influence durability.

A poorly leveled unit can create drainage problems. A poorly secured refrigerant line can vibrate. A poorly sealed duct can waste energy. Poorly thought-out access can complicate maintenance. Every detail counts.

In our installations in Montreal, Laval, Longueuil, on the North Shore, and the South Shore, we always emphasize this logic: the client pays not just for a machine, but for the entire result.

Practical Advice for Homeowners Considering a Central System

Before replacing an electric furnace or air handler, here are the points we recommend checking:

Check Duct Condition

A good appliance will not automatically correct a deficient duct network. Ducts must be adequately sized, airtight, and capable of distributing air properly.

Plan for Maintenance Access

Access to the filter, panels, and connections should remain simple. An appliance too cramped in a mechanical space can become problematic.

Confirm Required Actual Capacity

A unit that is too small will struggle to maintain comfort. A unit that is too large can lead to short cycling, poorly controlled humidification, and increased wear.

Validate Subsidies Before Purchase

Programs change, and eligibility depends on the exact models. Always validate information before signing.

Choose a Contractor Who Understands Central Systems

Installing a central system requires expertise in ventilation, refrigeration, electricity, drainage, and air balancing. It's not just a matter of mechanical connection.

A Client Experience Focused on Clarity

For this project in Baie-D'Urfé, our priority was to deliver a clean, reliable, and understandable installation for the homeowner. We explained the main connections, important access points, the role of the drain, and what to monitor during the first few weeks of use.

This step is important, as many clients are unfamiliar with how a central system works. They know they want comfort but don't always understand how the unit breathes, distributes air, evacuates humidity, or interacts with the outdoor unit. Our role is also to make this information accessible.

At AirGreen, we believe that a well-informed customer makes better decisions and maintains their equipment better.

Why choose AirGreen for a central electric furnace installation in Baie-D'Urfé?

Our expertise in HVAC installation is based on real projects, carried out in very different homes throughout Greater Montreal. We install central systems in various contexts: single-family homes, condominiums, duplexes, triplexes, renovated homes, older constructions, and properties with significant mechanical constraints.

For this MIDEA EVOX G3 project in Baie-D’Urfé, our added value was expressed in several aspects:

  • analysis of the mechanical space;
  • integration into the existing duct network;
  • clean and accessible connections;
  • attention to drainage;
  • professional finish;
  • respect for client needs;
  • advice on system maintenance and use.

This approach allows us to offer installations that take into account the reality of Quebec homes, the local climate, and homeowners' expectations.

A clean, stable result ready for Quebec's demanding seasons

The installation of this MIDEA EVOX G3 2.5 ton electric furnace in Baie-D’Urfé clearly illustrates what a central project should be: a combination of technical skill, precision, and common sense. The system is solidly installed, well connected, accessible for maintenance, and coherently integrated into the existing network.

In a region with significant temperature variations, a well-installed central system makes a real difference to daily comfort. The quality of the distributed air, temperature consistency, noise level, and long-term reliability depend as much on the equipment as on the installation.

At AirGreen, we treat each project as a complete solution. Whether it's a residence in Baie-D’Urfé, a home in Montreal, a project in Laval, an installation in Longueuil, on the North Shore or on the South Shore, our goal remains the same: to provide a well-designed, well-installed, and durable HVAC system.

The steps

How it goes, from the first call to the end

The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

Step 1 of 9The on-site estimate

We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.

  1. The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
  2. The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
  3. Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
  4. The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
  5. The outdoor unitOn a level base, raised above the snow, with free space all around.
  6. The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
  7. Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
  8. Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
  9. The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
Your numbers

And at your place?

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Size checkYour electric furnace, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Check the indoor module's filter.
    • Clear winter debris from the outdoor unit.
    • Test cooling before the heat arrives.
    And at your place?

    Which type of equipment for your project?

    Pick what looks like your need.

    Mistakes avoided

    Four mistakes we do not make

    Flip each card to see what we do instead.

    Frequently asked questions

    What people ask us about this kind of work

    11 questions
    Can I keep my current ducts?
    Often, yes: the central heat pump connects to the existing ducts. We check their condition and size during the estimate.
    What happens in extreme cold?
    The indoor module (furnace or air handler) works with the central heat pump and takes over in extreme cold.
    Furnace, air handler, ducted: what is the difference?
    The furnace or air handler is the indoor module of the central system. A ducted system hides in the ceiling: all you see are small supply grilles.
    Are there grants?
    Depending on the equipment and your situation, assistance programs may apply. AirGreen checks the exact combination before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city. See permits and by-laws, and we check for your address.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Will my current thermostat work?
    Not always: the thermostat has to run the heat pump and the backup heat. We check compatibility during the estimate.
    Central or wall units: which one?
    If the house has ducts in good shape, a central system heats and cools every room at once. Without ducts, wall units or a multi-zone are often simpler. We compare on site.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.
    Going further

    Useful pages for what comes next

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    Tell us about your house. We come and see it for free.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment