Project

Installation of a MIDEA EVOX G3 5-ton electric furnace with a central Air Handler system in Town of Mount Royal

AirGreen installs a MIDEA EVOX G3 5-ton electric furnace in Town of Mount Royal: central system, air handler, precise integration, and durable HVAC expertise.

By AirGreen Climatisation & Chauffage Admin10 min read
Installation of a MIDEA EVOX G3 5-ton electric furnace with a central Air Handler system in Town of Mount Royal
Installation of a MIDEA EVOX G3 5-ton electric furnace with a central Air Handler system in Town of Mount Royal
–chapters in this story
10 minreading time
–type of installation
2026year published
The tour

Take a tour of the installation

Each number is a point we check on site. Switch between summer and winter to watch air and heat move.

Generic diagram: central heat pump, indoor module and ducts

In summer, the outdoor unit rejects the house's heat outside.

Generic illustration of this type of installation, not a survey of this job site. Tap a number.

  1. It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.

  2. The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.

  3. A shut-off switch near the outdoor unit isolates it safely for service.

  4. Sitting on the indoor module, it moves heat between the house air and the refrigerant.

  5. Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.

  6. Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.

  7. It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.

  8. It runs the heat pump and the backup heat. It must be compatible with the installed system.

The job

A MIDEA EVOX G3 Central Installation Designed for a Confined Mechanical Space in Town of Mount Royal

In Town of Mount Royal, our AirGreen team performed a challenging HVAC installation of a 5-ton MIDEA EVOX G3 electric furnace, integrated into a central system with an air handler. Upon arrival, one element was immediately apparent: the unit had to be installed in a narrow technical space, framed by existing walls, pre-existing ducts, and a partially renovated area. This type of configuration is common in residences in Montreal, Laval, Longueuil, on the North Shore and South Shore, but it requires a precise method to ensure performance, safety, and durability.

The installation photo clearly illustrates the challenge: a MIDEA indoor unit installed vertically, perfectly aligned in a tight mechanical opening, with accessible connections on the front, an adjusted metal base, controlled clearances, and integration with existing ducts. This is not simply a matter of "placing a machine." In a central system, every detail influences comfort quality: airflow, static pressure, joint sealing, future access for HVAC maintenance, drainage management, component protection, and compatibility with the rest of the network.

Why choose a 5-ton MIDEA EVOX G3 electric furnace?

The 5-ton MIDEA EVOX G3 is a particularly interesting solution for homes requiring a significant air distribution capacity. In the case of this residence in Town of Mount Royal, the choice of a 5-ton unit met a clear need: to provide stable comfort in a property where the central network had to be capable of efficiently distributing heated or air-conditioned air through several living areas.

This type of central air handler is often chosen for:

  • replacing an old electric furnace that has become less efficient;
  • modernizing an existing central system;
  • preparing a residence for the addition or replacement of a central heat pump;
  • improving air circulation in a large house;
  • optimizing seasonal comfort with newer, better-controlled equipment.

In a property in Town of Mount Royal, where houses are often well-built but sometimes have old mechanical infrastructures, the main challenge is to integrate a modern appliance without compromising the existing architecture. This is precisely where AirGreen's expertise makes a difference.

A vertical installation in a complex technical space

One of the most important aspects of this project was the vertical installation of the MIDEA unit. The appliance had to be precisely positioned to respect necessary clearances, allow access to service panels, and ensure a clean connection with the ducts.

The photo shows several significant elements:

  • the unit is installed in a narrow mechanical niche;
  • the walls around the unit show traces of work and adaptation;
  • the return or supply duct had to be adjusted at the base;
  • drainage and refrigeration connections are grouped at the front for easy access;
  • the installation was carried out taking into account the space available on the right, where finishing work is still visible.

In an HVAC installation of this type, the available space directly influences technical decisions. A poorly positioned central electric furnace can create long-term problems: difficult access for repairs, excessive noise, air leaks, vibrations, insufficient drainage, or excessively high static pressure. Our approach therefore consists of anticipating these problems even before commissioning.

The importance of a well-designed metal base

The visible base under the unit plays a more important role than it appears. It serves to stabilize the unit, adapt the appliance to the duct network, and ensure a clean transition between the furnace and air distribution. A poorly made base can cause air leaks, whistling, performance loss, or premature fan wear.

At AirGreen, we pay particular attention to the quality of metal joints. For this project in Town of Mount Royal, the transition had to be strong enough to support the unit, while being precisely adjusted to the dimensions of the existing opening. The goal was simple: maintain stable airflow, avoid unnecessary losses, and prepare the system for reliable operation for several years.

Essential coordination with renovation work

This installation was carried out in a context where some parts of the room were still under construction. Structural elements, wall openings, and unfinished areas around the unit are visible. This kind of situation requires clear coordination between the HVAC teams and other trades.

Our priority was to deliver a clean, functional, and accessible installation, while allowing the continuation of finishing work around the unit. In several projects in Montreal, Laval, Longueuil, on the North Shore and South Shore, we work in spaces where renovations are not entirely completed. This requires rigorous planning: equipment must be protected, future access must be planned, wall finishes must not block service panels, and connections must remain visible and accessible.

Common mistakes to avoid with a central electric furnace

A central installation does not forgive improvisation. Many problems we correct in the field stem from previous installations where certain details were overlooked.

Here are the most common mistakes:

  • installing the unit without checking compatibility with existing ducts;
  • neglecting necessary clearances for maintenance;
  • underestimating the importance of sealing metal connections;
  • placing drains or connections in a hard-to-reach position;
  • not adjusting ventilation according to the system's actual capacity;
  • choosing too low or too high a capacity for the residence;
  • forgetting that performance depends as much on the installation as on the machine itself.

In the case of this 5-ton MIDEA EVOX G3 electric furnace, the high capacity required particular attention to airflow. A 5-ton unit must breathe properly. If it is installed on an overly restrictive network, performance can decrease, and comfort can become irregular. This is why our technicians systematically check the logic of the central network, the quality of transitions, the position of the unit, and the necessary accesses.

An AirGreen Project Demonstrating the Value of a Well-Planned HVAC Installation

This project in Town of Mount Royal perfectly illustrates the difference between simply installing equipment and a truly professional HVAC installation. The MIDEA EVOX G3 unit is modern, robust, and well-suited for central systems, but its actual performance depends on the quality of on-site integration.

A solution adapted to homes in Town of Mount Royal

Town of Mount Royal has a unique housing stock: spacious homes, high-end renovations, sometimes old mechanical systems, significant architectural constraints. In this context, a central solution like the 5-ton MIDEA EVOX G3 can be very relevant, especially when installed with a global vision of the building.

Our work is not just about replacing an appliance. We analyze the existing configuration, access constraints, air distribution, client needs, desired comfort level, and technical feasibility. This approach helps avoid unpleasant surprises and results in a more reliable system.

Performance, comfort, and future maintenance

A good central system must be high-performing, but also easy to maintain. On this installation, frontal access to service panels has been preserved, which will facilitate future interventions. This is an essential detail, as a hard-to-access unit risks being poorly maintained or costing more to repair.

Regular HVAC maintenance helps preserve:

  • air flow quality;
  • coil cleanliness;
  • fan motor reliability;
  • electrical connection safety;
  • overall system efficiency;
  • equipment lifespan.

For owners in Montreal, Laval, Longueuil, on the North Shore and South Shore, it is important to consider this aspect from the installation phase. Overly tight wall finishes, a poorly designed mechanical door, or blocked access can unnecessarily complicate future interventions.

What this installation reveals about AirGreen's expertise

Every project requires us to make precise technical decisions. In this Town of Mount Royal residence, our team had to work with a confined space, a high-capacity unit, a metallic connection base, renovation constraints, and demanding central integration. The result is a clean, stable, and coherent installation, ready to efficiently serve the house.

Our experience with central systems allows us to intervene in various contexts: electric furnace replacement, addition of a central heat pump, conversion of an old system, duct improvement, adaptation to complex mechanical spaces, or installation in renovated homes.

Practical tips before installing a central air handler

Before installing an electric furnace or a central air handler, we always recommend validating several points:

  1. The actual capacity required
    A 5-ton unit is suitable for some homes, but it should not be chosen based solely on the old machine. Area, insulation, ducts, and comfort needs must be considered.
  2. The condition of existing ducts
    Poorly sized ducts can limit performance, even with a new unit.
  3. Available mechanical space
    Access to panels, drains, filters, and connections must be planned.
  4. The quality of the base and transitions
    Metal joints must be strong, adjusted, and well sealed.
  5. Future maintenance
    A well-designed installation today reduces costs and complications tomorrow.

A reliable central installation for lasting comfort

The 5-ton MIDEA EVOX G3 installed in Town of Mount Royal represents a serious central solution for homeowners who wish to improve their comfort, modernize their system, and ensure efficient air distribution throughout the house. Thanks to a careful installation, the unit can operate under good conditions and provide a solid basis for central heating and air conditioning.

At AirGreen, we place as much importance on the machine as on the environment in which it is installed. It is this rigor that allows us to achieve lasting results, whether in Montreal, Laval, Longueuil, on the North Shore, the South Shore, or in demanding residential areas such as Town of Mount Royal.

The steps

The big day, step by step

The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

Step 1 of 9The on-site estimate

We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.

  1. The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
  2. The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
  3. Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
  4. The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
  5. The outdoor unitOn a level base, raised above the snow, with free space all around.
  6. The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
  7. Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
  8. Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
  9. The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
Your numbers

What would it look like at your place?

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Size checkYour electric furnace, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    Mistakes avoided

    Four mistakes we do not make

    Flip each card to see what we do instead.

    Going further

    Your own project, step by step

    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Check the indoor module's filter.
    • Clear winter debris from the outdoor unit.
    • Test cooling before the heat arrives.
    At your place

    Is your home ready?

    Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.

    0 / 6 checked
    True or false

    Four statements: true or false?

    It all comes down to details you have just seen.

    1. A central heat pump uses the house's ducts.

    2. In extreme cold, electric backup heat can take over.

    3. The filter only gets changed when the unit breaks down.

    4. You can reuse the old unit's size without checking.

    Frequently asked questions

    What people ask us about this kind of work

    11 questions
    Can I keep my current ducts?
    Often, yes: the central heat pump connects to the existing ducts. We check their condition and size during the estimate.
    What happens in extreme cold?
    The indoor module (furnace or air handler) works with the central heat pump and takes over in extreme cold.
    Furnace, air handler, ducted: what is the difference?
    The furnace or air handler is the indoor module of the central system. A ducted system hides in the ceiling: all you see are small supply grilles.
    Are there grants?
    Depending on the equipment and your situation, assistance programs may apply. AirGreen checks the exact combination before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city. See permits and by-laws, and we check for your address.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Will my current thermostat work?
    Not always: the thermostat has to run the heat pump and the backup heat. We check compatibility during the estimate.
    Central or wall units: which one?
    If the house has ducts in good shape, a central system heats and cools every room at once. Without ducts, wall units or a multi-zone are often simpler. We compare on site.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    Every house has its constraints. We see them before we install.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment