Heat pumps in Havelock: permits and bylaws

Planning a heat pump or an air conditioner in Havelock? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitNo permitNo permit required (zoning rules still apply)
FeeNot applicableNo permit is required.
Distance from lot lines1.5 m1.5 m from the lot lines; no more than 1 m from the house
Noise limitNot specifiedHarmonized bylaw 352-2025: excessive noise banned, no figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardWith conditions

At least 1.5 m from the lot lines and no more than 1 m from the house.

Side yardWith conditions

At least 1.5 m from the lot lines and no more than 1 m from the house.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • The Urbanisme page exempts from permits “the installation of a heat pump or a wall-mounted A/C unit”.
  • The zoning table has a “maximum noise level (dB)” line but sets no value.
Who to call Municipal office, 450 826-4741, admin@mun-havelock.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Havelock?

No permit required (zoning rules still apply).

How far from the lot lines must the unit be?

1.5 m from the lot lines; no more than 1 m from the house.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Harmonized bylaw 352-2025: excessive noise banned, no figure for heat pumps.

Who should I call to confirm before the work?

Municipal office, 450 826-4741, admin@mun-havelock.ca.

04 · Sources

Read at the source.

Sources: Municipality’s Urbanisme page (work that needs no permit); zoning bylaw 251 (consolidated February 2022), s. 6.3 and table 6.3.1, row 21; harmonized bylaw 352-2025, s. 6.1 (zoning: consolidated February 2022; checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Havelock?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.