To be confirmed Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Alexandre: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Alexandre? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedTo be confirmed: the certificate required for a heat pump (bylaw 20-369, s. 3.28 e)) is removed by bylaw 26-435, adopted May 4, 2026. Check with urban planning.
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines1 m (4.5 m at the front)4.5 m at the front, 1 m on the sides and at the rear; no more than 2 m from the house
Noise limitNot specifiedNoise bylaw RM-420: no decibel figure; any noisy appliance that disturbs the neighbours is prohibited from 11 p.m. to 7 a.m.
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardWith conditions

At least 1 m from the lot lines, no more than 2 m from the house.

Side yardWith conditions

At least 1 m from the lot lines, no more than 2 m from the house.

Front yardWith conditions

4.5 m from the front lot line, no more than 2 m from the house, hidden from the street by an opaque screen.

BalconyWith conditions

Allowed; the top of the unit must not rise above the balcony railing. No screen required.

Flat roofWith conditions

At least 3 m from the exterior walls, light-coloured; visual screen if visible from the street or a neighbouring residential lot.

02 · Before the work

Good to know, and who to call.

Good to know

  • Front or secondary front yard: opaque screen, or a hedge of conifers or evergreen shrubs if the unit is on the ground.
  • Not allowed on the main façade above the ground-floor ceiling, except on a balcony.
  • Issuing time: up to 30 days after a complete application is filed.
Who to call Urban planning department, 450 346-6641, ext. 4, inspectrice@saint-alexandre.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Alexandre?

To be confirmed: the certificate required for a heat pump (bylaw 20-369, s. 3.28 e)) is removed by bylaw 26-435, adopted May 4, 2026. Check with urban planning.

How far from the lot lines must the unit be?

4.5 m at the front, 1 m on the sides and at the rear; no more than 2 m from the house.

Can a heat pump go in the front yard?

Yes, with conditions. 4.5 m from the front lot line, no more than 2 m from the house, hidden from the street by an opaque screen.

What is the noise limit?

Noise bylaw RM-420: no decibel figure; any noisy appliance that disturbs the neighbours is prohibited from 11 p.m. to 7 a.m.

Who should I call to confirm before the work?

Urban planning department, 450 346-6641, ext. 4, inspectrice@saint-alexandre.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 20-366, s. 8.39 and 8.74; permits and certificates bylaw 20-369, s. 3.28 e), amended by bylaw 26-435; bylaw 16-313 (RM-420) (zoning and permits: version in force December 14, 2020; bylaw 26-434 (September 2026) does not affect s. 8.39 and 8.74; bylaw 26-435 (May 2026) removes s. 3.28 e)).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Alexandre?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours