Permit required Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Barnabé-Sud: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Barnabé-Sud? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredCertificate of authorization required before installation
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines1 m (3 m secondary front)1 m from the side and rear lot lines, 3 m from the secondary front lot line
Noise limit50 dB50 dB or more at the lot lines: not allowed
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardWith conditions

At least 1 m from the lot lines, no more than 1 m from the house wall.

Side yardWith conditions

At least 1 m from the lot lines, no more than 1 m from the wall. In the side setback, hidden from the street by landscaping.

Front yardNot allowed

Not allowed in the front yard. Corner lot: allowed in the secondary front yard, 3 m from the lot line.

BalconyWith conditions

Multi-unit buildings only, hidden from the street by landscaping.

Flat roofNot allowed

Roof allowed only for commercial, industrial, institutional or community buildings.

02 · Before the work

Good to know, and who to call.

Good to know

  • The unit must be no more than 1 m from the wall of the main building.
  • Corner lot: allowed in the secondary front yard, at least 3 m from the secondary front lot line.
  • New planning bylaws in force since October 1, 2025.
Who to call Urban planning inspector, 450 792-3030, ext. 4, insp@saintbarnabesud.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Barnabé-Sud?

Certificate of authorization required before installation.

How far from the lot lines must the unit be?

1 m from the side and rear lot lines, 3 m from the secondary front lot line.

Can a heat pump go in the front yard?

No. Not allowed in the front yard. Corner lot: allowed in the secondary front yard, 3 m from the lot line.

What is the noise limit?

50 dB or more at the lot lines: not allowed.

Who should I call to confirm before the work?

Urban planning inspector, 450 792-3030, ext. 4, insp@saintbarnabesud.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 03-2025, s. 8.2 and 8.28; permits and certificates bylaw 06-2025, s. 2.13 (table 2.1) (bylaws in force since October 1, 2025; checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Barnabé-Sud?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours