Heat pumps in Saint-Bernard-de-Lacolle: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Bernard-de-Lacolle? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedNot specified in the bylaw: confirm with urban planning.
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines2 m2 m from the lot lines
Noise limitNot specifiedHarmonized bylaw MRC2022, s. 7.1: excessive noise perceptible beyond the property line is not allowed; no dB figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 2 m from the lot lines.

Side yardAllowed

At least 2 m from the lot lines.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • Seasonal units (window air conditioners) are not covered by this rule.
  • Commercial use: landscaped screen in the side yard, and roof allowed if the unit is hidden from the street (s. 119).
Who to call Municipal office, 450 246-3348, info@mun-sbdl.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Bernard-de-Lacolle?

Not specified in the bylaw: confirm with urban planning.

How far from the lot lines must the unit be?

2 m from the lot lines.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Harmonized bylaw MRC2022, s. 7.1: excessive noise perceptible beyond the property line is not allowed; no dB figure for heat pumps.

Who should I call to confirm before the work?

Municipal office, 450 246-3348, info@mun-sbdl.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 171 (consolidated with 171-6), s. 91; permits and certificates bylaw 174 (consolidated with 174-5), s. 20 and 31; harmonized bylaw MRC2022, s. 7.1 (consolidated with 171-6 (September 2026)).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Bernard-de-Lacolle?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours