To be confirmed Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Jude: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Jude? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedTo be confirmed: the permits bylaw does not name heat pumps
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines2 m2 m from the lot lines
Noise limitNot specifiedNuisance bylaw 553-2024: no figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 2 m from the lot lines.

Side yardAllowed

At least 2 m from the lot lines.

Front yardWith conditions

Only if the building’s layout rules out the side and rear yards: hidden by a planted screen or an open screen matching the façade colour.

BalconyWith conditions

Multi-unit building with 6 dwellings or more (front yard): on a balcony, perpendicular to the street.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • New zoning bylaw 583-2026 in force since May 20, 2026.
  • Issuing time: up to 45 days for a building permit or certificate, counted from a complete application.
Who to call Building and environment inspector, 450 792-3855, ext. 4, inspecteur@saint-jude.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Jude?

To be confirmed: the permits bylaw does not name heat pumps.

How far from the lot lines must the unit be?

2 m from the lot lines.

Can a heat pump go in the front yard?

Yes, with conditions. Only if the building’s layout rules out the side and rear yards: hidden by a planted screen or an open screen matching the façade colour.

What is the noise limit?

Nuisance bylaw 553-2024: no figure for heat pumps.

Who should I call to confirm before the work?

Building and environment inspector, 450 792-3855, ext. 4, inspecteur@saint-jude.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 583-2026, s. 7.9; permits and certificates bylaw 582-2026, s. 2.9, 3.7 and 4.1; nuisance bylaw 553-2024 (bylaws in force May 20, 2026; checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Jude?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours