Permit required Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Louis: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Louis? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredCertificate of authorization required before installation (free)
FeeFreeFee published by the city.
Distance from lot lines2 mAt least 2 m from every lot line
Noise limitNot specifiedNuisance bylaw 549-23: no figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 2 m from every lot line.

Side yardNot specified

The bylaw contradicts itself: s. 16.4.2 allows heat pumps in the side yard, s. 16.8 requires the rear yard. Confirm with urban planning.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • Air conditioners are also listed among the equipment allowed in the side and rear yards (s. 16.4.2).
  • The inspector sees people by appointment on Mondays and Tuesdays.
Who to call Building and environment inspector, 450 788-2631, ext. 2003, permis@saint-louis.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Louis?

Certificate of authorization required before installation (free). Published fee: Free.

How far from the lot lines must the unit be?

At least 2 m from every lot line.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Nuisance bylaw 549-23: no figure for heat pumps.

Who should I call to confirm before the work?

Building and environment inspector, 450 788-2631, ext. 2003, permis@saint-louis.ca.

04 · Sources

Read at the source.

Sources: Planning bylaw 389-06 (administrative consolidation), s. 3.27, 16.4.1, 16.4.2 and 16.8; nuisance bylaw 549-23 (administrative consolidation of March 2017).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Louis?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours