To be confirmed Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Télesphore: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Télesphore? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedNot published online: confirm with urban planning
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot linesNot specifiedNo distance set for heat pumps in the zoning bylaw
Noise limitNot specifiedNuisance bylaw: no figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardNot specified

Not specified in the bylaw: confirm with urban planning.

Side yardNot specified

Not specified in the bylaw: confirm with urban planning.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • The zoning bylaw in force does not mention heat pumps: have the location confirmed before installing.
  • New zoning (353-26) and permits (356-26) bylaws have been in draft since February 2026.
Who to call Urban planning and environment department, 450 269-2999, option 1, ext. 3158, urbanisme@st-telesphore.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Télesphore?

Not published online: confirm with urban planning.

How far from the lot lines must the unit be?

No distance set for heat pumps in the zoning bylaw.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Nuisance bylaw: no figure for heat pumps.

Who should I call to confirm before the work?

Urban planning and environment department, 450 269-2999, option 1, ext. 3158, urbanisme@st-telesphore.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 282-09, s. 12.5 to 12.7; nuisance bylaw 328-19 as amended by 361-26 (RMH 450) (zoning: updated March 11, 2014; checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Télesphore?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours