Permit required Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Zotique: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Zotique? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredBuilding permit required (general rule, no exemption for heat pumps)
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines2 m (1 m with acoustic screen)2 m from the lot lines on the sides and at the rear (1 m with an acoustic screen), 2 m from other buildings
Noise limit50 dBAAverage heat pump noise: 50 dBA maximum at the lot lines
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardWith conditions

At least 2 m from the lot lines, or 1 m with an acoustic screen, and 2 m from other buildings.

Side yardWith conditions

At least 2 m from the lot lines, or 1 m with an acoustic screen, and 2 m from other buildings.

Front yardNot allowed

Not allowed in the front yard. Corner lot: allowed in the secondary front yard, 3 m from the front lot line, fully hidden by a permanent visual screen or a fence.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • A new zoning bylaw (draft no. 792) is going through adoption: the rules may change.
  • Unit on the roof or projecting from a wall: clad with an authorized exterior material; on the roof, it must not be visible in any way.
Who to call Urban planning department, 450 267-9335 Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Zotique?

Building permit required (general rule, no exemption for heat pumps).

How far from the lot lines must the unit be?

2 m from the lot lines on the sides and at the rear (1 m with an acoustic screen), 2 m from other buildings.

Can a heat pump go in the front yard?

No. Not allowed in the front yard. Corner lot: allowed in the secondary front yard, 3 m from the front lot line, fully hidden by a permanent visual screen or a fence.

What is the noise limit?

Average heat pump noise: 50 dBA maximum at the lot lines.

Who should I call to confirm before the work?

Urban planning department, 450 267-9335.

04 · Sources

Read at the source.

Sources: Zoning bylaw 529, table 24 and s. 5.1.2; bylaw 532 on the administration of planning bylaws, s. 5.1 (administrative version updated to bylaw 529-37 (2025); checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Zotique?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours