Heat pumps in Yamaska: permits and bylaws
Planning a heat pump or an air conditioner in Yamaska? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

Five spots, one answer for each.
Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.
Allowed in the rear yard, at least 1 m from the lot lines.
Allowed in the side yard, at least 1 m from the lot lines. Visual screen if the yard faces a street.
Not allowed in the front yard.
Not specified in the bylaw: confirm with urban planning.
Roof: on the rear part of the roof, as far from the street as possible.
Good to know, and who to call.
Good to know
- Building permit: $100; certificate of authorization: $20 (which one applies to a heat pump is not stated).
- Processing time: 30 days from a complete request.
- The permit must be posted during the work, visible from the street.
The short answers.
Do you need a permit to install a heat pump in Yamaska?
Permit required to install a heat pump.
How far from the lot lines must the unit be?
At least 1 m from the lot lines.
Can a heat pump go in the front yard?
No. Not allowed in the front yard.
What is the noise limit?
Bylaw RM-2017: no decibel figure for heat pumps.
Who should I call to confirm before the work?
Urban planning inspector, 450 789-2489, permis@yamaska.ca.
Read at the source.
Sources: “Permis de construction et certificat d’autorisation” leaflet; zoning bylaw RY-79-2015, s. 4.4.3 and 5.10.1; bylaw RM-2017, s. 6.1.5 (checked September 30, 2026).
Checked by AirGreen on September 30, 2026.
This page is a summary. The official bylaw prevails. Confirm with the city before the work.