Allergies et ventilation : le témoignage touchant d’une école maternelle à Laval
Reading time: 4'

Allergies and Ventilation: The Touching Testimony of a Preschool in Laval

When Poor Ventilation Becomes a Public Health Issue in a Daycare in Laval

It’s not always a breakdown or a strange noise that prompts a call to HVAC specialists. Sometimes, it’s a gradual, nearly invisible discomfort that creeps into a building. That’s exactly what happened at a preschool in Laval, which faced a worrying increase in allergy cases among both children and educators. Thanks to our expertise at AirGreen, we identified the source of the problem and implemented a solution that truly transformed daily life at this daycare.

Warning Signs: Coughing, Runny Noses, and Constant Fatigue

It all started with recurring complaints from parents: their children were coming home with persistent symptoms – nasal congestion, red eyes, dry cough – even outside of pollen season. One educator, who suffers from asthma, had to seek medical help repeatedly after frequent attacks.

The staff eventually suspected a link to indoor air quality. A quick search led them to contact our team, specialized in commercial ventilation in Laval.

On-Site Inspection: An Outdated System and Clogged Filters

During our first visit, our certified technicians conducted a full HVAC health check:

  • The existing ventilation system, a Venmar brand, hadn’t been serviced in over three years.

  • The filters were saturated with fine dust and mold spores.

  • Measured airflow was well below the recommended standards for spaces housing young children.

We also detected excessive humidity in certain rooms, fostering allergen proliferation.

Proposed Solution: Modernizing the Ventilation System with Heat Recovery

At AirGreen, we know that a healthy environment starts with effective and efficient ventilation. We proposed a complete upgrade:

  • Replacing the current system with a Venmar AVS HRV E15 ECM unit, featuring heat recovery.

  • Installing a programmable wall controller to adjust air exchange cycles based on occupancy hours.

  • Setting up MERV 13 filters to capture fine particles and allergens.

This solution not only ensures effective air renewal but also reduces energy loss during winter – a financial asset for small institutions.

Project Timeline: Fast, Clean, and No Disruption to Activities

With the daily presence of children in mind, we scheduled our HVAC intervention for the weekend:

  • Day 1: dismantling and removal of the old system, duct cleaning.

  • Day 2: installation of the new unit, electrical wiring, system calibration.

  • Day 3: technical testing, airflow validation, staff training on the new control panel.

Thanks to meticulous planning, the children returned to their environment on Monday without any disruption.

Results Observed: Immediate Improvement in Air Quality

Two weeks after installation:

  • Allergy symptoms dropped by over 70%.

  • Relative humidity in classrooms stabilized between 40–45%.

  • Air circulation improved significantly in previously problematic zones.

One memorable testimony: an educator told us that, for the first time in two years, she could work a full day without using her inhaler.

Advice for Daycares and Educational Facilities

Based on this intervention, here are our HVAC recommendations for early childhood institutions:

  • Have your ventilation system inspected at least once a year.

  • Replace filters every 3 to 6 months, depending on the type and environment.

  • Invest in heat recovery units to reduce energy costs.

  • Educate staff about signs of poor air quality: persistent condensation, odors, fatigue, coughing.

Why Call on AirGreen in Laval and Educational Settings?

We understand the unique constraints of educational environments:

  • Compliance with public health standards,

  • Scheduling work without disturbing children,

  • Choosing equipment that is quiet, reliable, and easy to maintain.

Our approach is based on:

  • Precise diagnostics, using field data (airflow, CO2 levels, humidity),

  • Educational support for staff and administrators,

  • Solid experience in schools, from Montréal to the North Shore, including Longueuil.

Other Similar Projects Completed by AirGreen

  • Upgraded the ventilation system in a community center in Brossard, installing a Lennox M1HRV ERV,

  • Rehabilitated a duct network in a seniors' residence in Terrebonne,

  • Brought a kitchen ventilation system up to code in an elementary school in Montréal-Nord.

Each project is handled with the same rigor, attention to detail, and passion for excellence in HVAC.

Leave a comment