Depends Permits and bylaws · Checked on September 30, 2026

Heat pumps in Côte Saint-Luc: permits and bylaws

Planning a heat pump or an air conditioner in Côte Saint-Luc? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitDependsPermit required to modify the heating or cooling system; no permit to replace a heat pump
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot linesNot specifiedNo minimum distance from the lot lines set in the zoning bylaw
Noise limit55 / 50 dBA55 dBA by day, 50 dBA at night, at the lot line
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

Allowed in the rear yard.

Side yardAllowed

Allowed in the side yards.

Front yardNot allowed

Not allowed in the front yard or secondary front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • Day: 7 a.m. to 11 p.m.
  • Noise measured along the lot line, at least 3.05 m from the unit; on a balcony or patio: 50 dBA by day, 45 dBA at night.
  • New zoning bylaw 2637 is being adopted (register held in September 2026): it will replace bylaw 2217.
Who to call Urban Planning Department, 514 485-6800 Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Côte Saint-Luc?

Permit required to modify the heating or cooling system; no permit to replace a heat pump.

How far from the lot lines must the unit be?

No minimum distance from the lot lines set in the zoning bylaw.

Can a heat pump go in the front yard?

No. Not allowed in the front yard or secondary front yard.

What is the noise limit?

55 dBA by day, 50 dBA at night, at the lot line.

Who should I call to confirm before the work?

Urban Planning Department, 514 485-6800.

04 · Sources

Read at the source.

Sources: “Do I need a permit?” guide (March 2026); zoning bylaw 2217, s. 4-4-1 to 4-4-3; construction bylaw 2593, s. 3.4.7 and 5.1.1 (guide dated March 2026; bylaw 2593: consolidated February 21, 2024).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Côte Saint-Luc?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.