Permit required Permits and bylaws · Checked on September 30, 2026

Heat pumps in Kirkland: permits and bylaws

Planning a heat pump or an air conditioner in Kirkland? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredCertificate of authorization required to install or replace a heat pump
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot linesNot specifiedNo set distance: rear and side setbacks only
Noise limit50 dBA50 dBA maximum, measured at any lot line
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

Allowed in the rear setback.

Side yardAllowed

Allowed in the side setbacks.

Front yardNot allowed

Not allowed in the front setback.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • Include the certificate of location, a site plan showing distances to the lot lines, and the contractor’s quote.
  • Check any servitudes that affect your property.
  • The same 50 dBA rule covers pool pumps.
Who to call Urban Planning and Environment Department, 514 694-4100, urbanisme@ville.kirkland.qc.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Kirkland?

Certificate of authorization required to install or replace a heat pump.

How far from the lot lines must the unit be?

No set distance: rear and side setbacks only.

Can a heat pump go in the front yard?

No. Not allowed in the front setback.

What is the noise limit?

50 dBA maximum, measured at any lot line.

Who should I call to confirm before the work?

Urban Planning and Environment Department, 514 694-4100, urbanisme@ville.kirkland.qc.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 90-58, s. 5.9 h) and 10.7; permits and certificates bylaw 90-61, s. 3.1; city’s “Heat pumps” page (bylaw 90-58: consolidation compiled August 13, 2026; checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Kirkland?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours