Permit required Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Bruno-de-Montarville: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Bruno-de-Montarville? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredBuilding permit required to install a heat pump or air conditioner
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines1.25 m (5 m at the front)1.25 m from the lot lines; 5 m from the front lot line in front of the main façade
Noise limit60 / 50 dBOver 60 dB from 7 a.m. to 11 p.m. and over 50 dB from 11 p.m. to 7 a.m., at the lot lines: not allowed
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardWith conditions

1.25 m from the lot lines. Must not be visible from the street.

Side yardWith conditions

1.25 m from the lot lines, hidden by conifers or an opaque fence. Must not be visible from the street.

Front yardNot specified

Conflicting rules in the bylaw (s. 107 and 126): confirm with urban planning.

BalconyWith conditions

Buildings with 4 or more dwellings: 1 per dwelling, 0.4 × 1 × 0.75 m at most, 2 m from neighbouring windows and balconies.

Flat roofWith conditions

Flat roof of the main building: 3 m from the roof edges, 2.5 m high at most, not visible from the street.

02 · Before the work

Good to know, and who to call.

Good to know

  • Buildings with 4 or more dwellings: no units on the walls unless built into the wall (0.25 m thick at most); on a balcony, use the side or rear one first, narrow side facing the street.
  • Condos: noise is measured at the edge of the land reserved for the unit’s exclusive use.
  • The city’s “Thermopompe” page (2019) still says 2 m: the bylaw as amended in 2026 requires 1.25 m.
Who to call Regulation, permits and inspection division, 450 645-2930, urbanisme@stbruno.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Bruno-de-Montarville?

Building permit required to install a heat pump or air conditioner.

How far from the lot lines must the unit be?

1.25 m from the lot lines; 5 m from the front lot line in front of the main façade.

Can a heat pump go in the front yard?

Conflicting rules in the bylaw (s. 107 and 126): confirm with urban planning.

What is the noise limit?

Over 60 dB from 7 a.m. to 11 p.m. and over 50 dB from 11 p.m. to 7 a.m., at the lot lines: not allowed.

Who should I call to confirm before the work?

Regulation, permits and inspection division, 450 645-2930, urbanisme@stbruno.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw URB-Z2017, ch. 3, s. 107, 107.1 and 126; administration bylaw URB-ADM2017, s. 25 (row 39); noise bylaw SB-2004-21, s. 3 and schedule A (consolidated April 20, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Bruno-de-Montarville?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours