Optimizing your commercial heating system during summer: a winning strategy
In the world of commercial HVAC, strategic planning is key to ensuring comfort, energy performance, and uninterrupted business operations. One of the most common mistakes we see among building managers, business owners, or commercial property landlords in Montréal, Laval, Longueuil, the South Shore, and the North Shore is waiting for cold weather to start thinking about heating upgrades. In reality, the summer season is not only more advantageous but also safer and more economical for carrying out heating system improvement projects.
Why plan heating work during the summer?
Easier access to mechanical installations
Summer brings milder temperatures, meaning your heating systems aren’t in use. This allows us to work without disrupting your operations or compromising the comfort of your occupants or employees. Additionally, we can access boiler rooms, ducts, ceilings, and other mechanical components without seasonal constraints, which reduces both the duration of work and incidental costs.
Faster turnaround times
At AirGreen, we’ve found that our technical teams receive far fewer heating-related emergency calls during the summer than in winter, when emergency demand spikes. This means installation or upgrade timelines are significantly shorter in summer, allowing you to plan your budget and schedule with greater flexibility.
Avoid unexpected winter breakdowns
Quebec winters are harsh, and an outdated or inadequate commercial heating system can quickly lead to breakdowns in the middle of the cold season. By getting ahead of the problem, you protect your business from operational interruptions, costly emergency repairs, and major discomfort for your occupants. It’s a smart and responsible preventive approach.
Case study: central heating upgrade in a commercial building in Laval
We were recently contracted to replace an outdated forced-air heating system in a three-story commercial building located in Laval. The existing installation, over 25 years old, showed significant signs of failure: heat loss, excessive noise, and rising energy consumption.
Installation details
-
Brand installed: Goodman
-
Model: Central Air Handler compatible with R-32 refrigerant
-
Capacity: 60,000 BTU
-
Particularity: System connected to an outdoor heat pump unit
-
Project duration: 4 days
-
Work period: August 2024
Our technicians safely removed the old ductwork, installed the new variable-speed unit, and performed a complete system calibration. The client took advantage of the lower summer occupancy to complete the project without impacting business operations. What’s more, the new unit qualified for a $3,294 LogisVert subsidy, reducing the overall cost of the project.
Benefits of summer upgrades for commercial clients
1. Lower operating costs
Modern equipment, like the Bosch BIVA IDS Premium R-454B, can deliver energy savings of up to 40% compared to systems over 15 years old.
2. Improved indoor comfort
Thanks to variable-speed systems, temperature is regulated more precisely, ensuring consistent comfort for both employees and clients.
3. Government subsidies available
Several programs, including Hydro-Québec’s LogisVert, are available when you choose certified equipment installed by recognized contractors like AirGreen.
4. Increased property value
A modern HVAC system is a true asset when selling or leasing commercial properties.
Practical tips before starting your upgrade
-
Have your current system inspected in the spring to identify critical components needing replacement.
-
Choose a certified contractor (like AirGreen) recognized by major subsidy programs.
-
Opt for reputable brands like Fujitsu, Bosch, Goodman, or Gree that offer extended warranties and proven performance.
-
Request an energy simulation to estimate potential savings after the upgrade.
-
Use the summer to plan your HVAC work during periods of lower occupancy.
The AirGreen approach: expertise, precision, and transparency
At AirGreen, we understand the unique challenges of managing commercial buildings: reducing operational costs, ensuring reliability and safety, and meeting tight deadlines. Our approach stands out through:
-
Detailed technical assessments tailored to your needs, based on square footage, building use, and energy goals.
-
Personalized assistance with subsidy applications.
-
Technicians trained on the latest commercial HVAC technologies.
-
Complete transparency regarding costs, timelines, and proposed solutions.
We’ve already upgraded commercial heating systems in Montréal, Longueuil, Terrebonne, Brossard, Saint-Jérôme, and Châteauguay, with excellent client feedback on the impact to their operations.
Don’t miss the summer window
The summer season is too often underestimated for this type of project, even though it represents a strategic opportunity for forward-thinking businesses. Whether you manage an office building, retail space, or institutional facility, planning your heating upgrades with AirGreen in summer means investing in efficiency, safety, and peace of mind.
Conclusion: be proactive, not reactive
Quebec winters are unpredictable. Waiting until temperatures drop to take action could cost you big. By planning today with AirGreen, you ensure your commercial property is ready for a hassle-free heating season. Contact us now for a free assessment and a customized quote.