Terrebonne : Permits and Regulations | Heat pump or air conditioning unit

Terrebonne : Permits and Regulations | Heat pump or air conditioning unit

City of Terrebonne : Get a permit to install a heat pump or air conditioning unit

Dear Residents of City of Terrebonne,

We are AirGreen, your trusted partner for efficient and sustainable HVAC solutions. We understand that each municipality has its own rules and regulations regarding the installation of heat pumps, and Terrebonne is no exception.

Work Declaration:

  • No Permit Required: To commence your work, there’s no need to apply for a permit. Simply fill out a work declaration form. This form is available both on our website and at our offices. You can return it to us either by mail or through our email address.

Heat Pump Location:

  • Side, Rear, or Secondary Front Yard: Your heat pump can be installed in these specific areas of your property. It’s crucial to select a strategic location to ensure optimal efficiency of the device while complying with the city’s standards.

Noise Level:

  • Compliance with Municipal Standards: Air conditioning units can emit noise that might be disturbing to your neighbors. Ensure that your device’s noise level complies with the standards outlined in the municipal noise and nuisance regulation number 82.
  • Practical Advice: Before making a purchase, we strongly advise you to check the manufacturer's specifications regarding the device’s noise level and installation conditions.

Citizen Collaboration:

  • We rely on the collaboration of each citizen to maintain a peaceful and pleasant environment for all. Adhering to the established norms and regulations significantly contributes to the quality of life and good neighborly relations.

Aesthetics:

  • If your heat pump is visible from the street, consider installing an aesthetic or plant screen to conceal it, harmonizing with the aesthetics of your property.

Contact and Support:

  • For properties located on a street corner or for more information and advice, feel free to contact the staff of the Direction de l’aménagement du territoire at 450 471-3008 or via email at: amenagement.territoire@ville.terrebonne.qc.ca.

Client Responsibility:

  • While we are here to guide and assist you at every step, it is the client’s responsibility to ensure compliance with all rules and to obtain neighbors’ agreement when necessary. We can provide necessary help and advice, but the ultimate responsibility for obtaining permits and compliance with local regulations falls on the client, unless otherwise specified in the contract.

At Your Service:

  • AirGreen is always at your disposal to serve and guide you through the necessary steps. We are committed to providing excellent customer service and supporting you in realizing your HVAC projects.

For more information, you can also refer to the documentation available on the official website of Ville de Terrebonne: www.ville.terrebonne.qc.ca.

Looking forward to collaborating with you for your HVAC needs in Terrebonne!

Kind regards,

The AirGreen Team

Caution

This section has been prepared solely for the convenience of the reader and has no official or legal value. No warranty is offered as to the accuracy of the text. For all legal purposes, the reader should consult the official version of the by-law and each of its amendments or obtain a copy by contacting the City's clerk office.