A Showcase Commercial HVAC Project on the South Shore: Efficiency, Comfort, and Lasting Savings
In the world of commercial heating, every project is unique. Yet, some cases stand out as true benchmarks, demonstrating how a strategic approach and technical expertise can transform an energy-hungry building into a high-performance, comfortable space. That’s exactly what we recently achieved at AirGreen, during a commercial HVAC installation in a logistics warehouse located on Montréal’s South Shore. This real-life case illustrates how we helped our client cut heating costs by 30%, while improving comfort and operational efficiency.
Initial Challenges: An Aging Warehouse with Major Energy Losses
This 2,500 m² industrial warehouse located in Boucherville (South Shore) was operating with an outdated natural gas forced-air heating system that was over 20 years old. Employees often complained about uneven temperatures, especially in loading zones where doors were frequently opened. Winter gas bills regularly exceeded $8,000/month.
Our mission was clear: modernize the heating system, reduce energy bills, qualify the building for grants, and ensure reliable performance even during Québec’s extreme winter cold.
The AirGreen Solution: A High-Efficiency Central Heat Pump Tailored for Commercial Needs
After conducting a thermal imaging assessment, precise measurements, and multiple energy simulations, our team recommended the installation of a Bosch BOVA 5T central heat pump (60,000 BTU), integrated with a Bosch BVA modular air handler, all running on R-454B refrigerant — a next-generation fluid, more eco-friendly and compliant with 2025 environmental standards.
Why Choose the Bosch BOVA + BVA System?
-
High energy efficiency: SEER 20 / HSPF 10.5
-
Direct reduction of gas consumption: complete replacement of combustion-based heating
-
Inverter technology: continuous modulation for stable comfort and optimized energy use
-
Reversibility: provides cooling in summer (air conditioning)
-
Grant eligibility: approved for Hydro-Québec’s LogisVert program, amount received: $7,500
Project Execution: A Careful, Well-Planned Installation
Our work was carried out over a 4-day period, without disrupting the company’s operations:
-
Day 1: Removal of the old gas unit and preparation of the mechanical room.
-
Day 2: Installation of the Bosch BVA air handler and air ducts adapted to 7-meter ceiling heights.
-
Day 3: Installation of the outdoor Bosch heat pump (BOVA) with reinforced floor mounting for industrial setting.
-
Day 4: Programming of smart thermostats by zone and full system commissioning.
We also installed inspection hatches and connected temperature sensors to enable ongoing system performance monitoring throughout the seasons.
Results Observed After 3 Months of Operation
The results were not only positive — they were remarkable:
-
30% reduction in heating bills in just the first quarter
-
Significantly improved thermal stability throughout the warehouse, including loading zones
-
Increased comfort for staff, boosting productivity
-
Lower carbon footprint by eliminating natural gas and switching to green electricity
Client Testimonial: A Tangible Success
“We were skeptical at first, especially about whether a heat pump could warm such a large space during extreme cold. But the results exceeded our expectations. AirGreen handled everything — from the analysis to the installation — with professionalism and precision.”
— Operations Director, Entreposage LogiSud Inc., Boucherville
Why Choose AirGreen for Your Commercial Heating Projects?
At AirGreen, we understand the realities of the commercial and industrial sectors. Our experts tailor every solution to the building’s specific needs, maximizing energy efficiency, system durability, and return on investment.
Our Strengths:
-
Proven experience with complex projects in Montréal, Laval, Longueuil, North Shore, and South Shore
-
Technical expertise with brands like Bosch, Fujitsu, Gree, Goodman, and more
-
Support for grant applications: we prepare all required documentation
-
Dedicated commercial team: fast, discreet, and highly efficient
Practical Tips for a Successful Commercial HVAC Upgrade
-
Avoid undersized systems: capacity must suit the building’s size, purpose, and insulation
-
Opt for inverter heat pumps: they offer better stability and long-term savings
-
Request a full energy assessment before making any investment
-
Leverage available grants in Québec (LogisVert, Chauffez Vert, etc.)
More Successful Projects by AirGreen
We’ve recently modernized the heating systems of:
-
A distribution center in Saint-Hubert (South Shore) with dual Fujitsu Airstage heat pumps
-
A veterinary clinic in Laval with a zoned central Bosch solution
-
A gym in Montréal-Nord, combining radiant heating and wall-mounted cooling
Each installation is an opportunity for us to showcase our know-how and deliver reliable, durable, and cost-effective HVAC solutions.
Conclusion: A Lasting Transformation Thanks to a Well-Engineered Solution
This real-life case on the South Shore is a perfect example of what we accomplish every day at AirGreen. By selecting the right equipment, leveraging expert knowledge, and integrating energy optimization from the start, we transform energy-guzzling buildings into efficient, comfortable, and profitable environments.
Contact AirGreen for your commercial heating needs in Montréal, Laval, Longueuil, South Shore, or North Shore — we have the experience and solutions to make a real difference.
