Project

Installation of an Ameristar (central range) central heat pump in Blainville

In Blainville, AirGreen installed an Ameristar central heat pump on wall brackets , with an external disconnect switch and short refrigeration lines. The HVAC system is compliant, quiet, and ready for North Shore winters.

By AirGreen Climatisation & Chauffage Admin7 min read
Installation of an Ameristar (central range) central heat pump in Blainville
Installation of an Ameristar (central range) central heat pump in Blainville
Generic diagram: central heat pump, indoor module and ducts

In summer, the outdoor unit rejects the house's heat outside.

Generic illustration of this type of installation, not a survey of this job site. Tap a number.

  1. It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.

  2. The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.

  3. A shut-off switch near the outdoor unit isolates it safely for service.

  4. Sitting on the indoor module, it moves heat between the house air and the refrigerant.

  5. Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.

  6. Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.

  7. It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.

  8. It runs the heat pump and the backup heat. It must be compatible with the installed system.

A neat upgrade on wall brackets for four-season comfort in the northern suburbs

At AirGreen , we have just completed a residential HVAC installation in Blainville (North Shore) : an Ameristar central heat pump installed on galvanized wall brackets , halfway up the brick facade. The goal: to provide the owner with efficient heating in the winter and stable air conditioning in the summer , while protecting the unit from snow accumulation and water splashing on the ground. This configuration perfectly illustrates best practices for single-family homes in the greater Montreal suburbs.

Context and customer expectations

The client wanted to modernize an existing central system in order to gain energy efficiency and acoustic comfort , without sacrificing the aesthetics of the facade. The side courtyard being narrow and partially windowed in the basement, we favored:

  • a sturdy wall bracket to raise the condenser approximately 45–60 cm from the ground (draining gravel area),

  • a short, clean and insulated refrigeration connection route ,

  • an external power supply with a nearby disconnect switch, in accordance with the Code.

Installation details visible on the installation

  • Support : galvanized steel brackets with mechanical anchors in the brick, level controlled to limit vibrations and preserve the fan bearing.

  • Height : Sufficient clearance under the unit for drainage in defrost mode (heat pump operation in cold weather) and for preventive maintenance.

  • Clearances : Adequate clearance from the wall and openings (basement window) to allow unobstructed air intake and exhaust .

  • Electricity : external disconnect switch in the immediate vicinity, UV-resistant flexible conduit (whip) , compliant earthing.

  • Refrigeration lines : insulated duct, sealed wall penetration above finished floor level, protection of foams against sun and shocks.

  • Water management : bed of white draining rocks under the device to avoid splashing and mud; area cleared of vegetation to preserve air flow.

Why choose an Ameristar central heat pump?

The Ameristar range (by Trane Technologies) integrates well with existing duct systems (plenum and indoor air distributor). We often recommend it for single-family homes in Blainville, Sainte-Thérèse, Rosemère and more broadly on the North Shore , when the ductwork is in good condition.
Main advantages for this housing profile:

  • Inverter according to the series, for fine modulation and mid-season savings.

  • Heating/air conditioning compatibility with operating ranges adapted to the metropolitan climate.

  • Simplified maintenance : easy access to the upper fan and coils.

  • Parts and Service : Stable supply chain and regional availability.

Note: When required by the specific model, we validate the refrigerant (R-410A or new generation depending on the series), the required airflow on the furnace/manager side, and the charge tables in order to adjust the charge weight according to the actual length of the lines.

AirGreen Methodology: Sizing and Compliance

Before proposing the equipment, we carry out a thermal sizing (reference CSA F280 and climatic conditions of the Montreal region) and a verification of the envelope . This step avoids oversized devices which generate short cycles, discomfort and overconsumption.
Our construction sites meet the requirements of the municipalities of Montreal, Laval, Longueuil, North Shore and South Shore , particularly on:

  • noise levels at the property boundary,

  • mechanical clearances (intake/exhaust),

  • minimum height above ground and snow management,

  • electrical connections and protection by external disconnector.

Key installation steps (best practice on brick houses)

  1. Marking and anchoring of brackets : marking on the masonry, sealing of fixings, load-bearing control.

  2. Drilling & crossing : single drilling with sheath for refrigeration lines and cables, internal/external waterproof sealing .

  3. Installation of the outdoor unit : seat check, silent blocks to limit vibrations transmitted to the brick.

  4. Brazing and testing : brazing under nitrogen, pressure test then high vacuum ≤ 500 microns ; stabilization and leak test.

  5. Charging : validation of subcooling/superheating according to the manufacturer's table, charge adjustment as needed depending on the length of the lines.

  6. Electrical connection : dedicated circuit breaker for the panel, external disconnector, UV-sheathed wiring.

  7. Commissioning : initial measurements (intensities, air/return temperatures, delta-T ), recording of parameters for the AirGreen commissioning sheet .

Climate specificities: why the wall bracket is a plus in Blainville

Winters on the North Shore bring repeated snow and ice. Raise the condenser:

  • reduces the risk of burial under snow,

  • improves the flow of defrost water (less ice under the appliance),

  • limits premature corrosion,

  • facilitates access for HVAC maintenance (coil cleaning, connection inspection).

When the environment is very exposed, we offer an optional snow guard and, depending on the orientation, a discreet deflector to channel the air flow.

Result: comfort, cleanliness and service access

The owner benefits from a modulating, quiet, and visually well-integrated central heating system. The unit, located outside of traffic areas and away from basement windows, respects clearances while remaining easily accessible for annual maintenance. The courtyard maintains a clean line thanks to the gravel bed and minimal ductwork.

Recommended Maintenance (and What's Included)

We offer an annual maintenance including:

  • gentle rinsing of the external coil,

  • checking electrical connections,

  • fan and balance check,

  • inspection of delta-T and airflow at the indoor manager,

  • cleaning the condensate drain on the evaporator side and changing the filter .

This maintenance supports the durability of the appliance, maintains seasonal performance and preserves the manufacturer's warranty .

Grants and funding

Depending on the model and current criteria, a central heat pump may be eligible for energy efficiency assistance programs in Greater Montreal. We support our clients in Montreal, Laval, Longueuil, the North Shore, and the South Shore to prepare applications, validate eligibility, and optimize return on investment (ROI). Our team prepares supporting documents (detailed invoice, commissioning sheet, technical photos) to expedite processing .

Best practices and points of attention for a single-family home

  • Positioning : Avoid closed corners and recesses that recycle hot air in summer.

  • Acoustics : Use sound deadeners and choose an area away from bedrooms; inverter modulation helps reduce sound peaks.

  • Safety : respect the distances from meters and any regulated sources of ignition.

  • Water management : keep the bottom free and draining ; never block the drain.

  • Landscaping : Allow 60–90 cm of free space around the edges for air circulation and service access.

  • Winterization : do not cover a heat pump tightly; favor a clean clearance and fall cleaning.

Why AirGreen for your project on the North Shore and in Greater Montreal?

We deliver clean, compliant, and documented installations, with systematic commissioning and complete traceability of measurements. Our service division quickly serves Blainville, Terrebonne, Sainte-Thérèse, Laval, Longueuil , and the entire region. If necessary, our customers are added to our seasonal priority list to expedite interventions during peak periods.

The steps

How it goes, from the first call to the end

The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

Step 1 of 9The on-site estimate

We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.

  1. The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
  2. The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
  3. Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
  4. The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
  5. The outdoor unitOn a level base, raised above the snow, with free space all around.
  6. The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
  7. Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
  8. Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
  9. The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
Your numbers

And at your place?

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Size checkYour electric furnace, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Check the indoor module's filter.
    • Clear winter debris from the outdoor unit.
    • Test cooling before the heat arrives.
    And at your place?

    Which type of equipment for your project?

    Pick what looks like your need.

    Mistakes avoided

    Four mistakes we do not make

    Flip each card to see what we do instead.

    Frequently asked questions

    What people ask us about this kind of work

    11 questions
    Can I keep my current ducts?
    Often, yes: the central heat pump connects to the existing ducts. We check their condition and size during the estimate.
    What happens in extreme cold?
    The indoor module (furnace or air handler) works with the central heat pump and takes over in extreme cold.
    Furnace, air handler, ducted: what is the difference?
    The furnace or air handler is the indoor module of the central system. A ducted system hides in the ceiling: all you see are small supply grilles.
    Are there grants?
    Depending on the equipment and your situation, assistance programs may apply. AirGreen checks the exact combination before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city. See permits and by-laws, and we check for your address.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Will my current thermostat work?
    Not always: the thermostat has to run the heat pump and the backup heat. We check compatibility during the estimate.
    Central or wall units: which one?
    If the house has ducts in good shape, a central system heats and cools every room at once. Without ducts, wall units or a multi-zone are often simpler. We compare on site.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.
    Going further

    Useful pages for what comes next

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    Tell us about your house. We come and see it for free.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment