Installation of a MIDEA EVOX G3 2-Ton Electric Furnace – Central Air Handler System in Old Montreal
AirGreen installs a 2-ton MIDEA EVOX G3 electric furnace in Old Montreal: compact central system, clean connections, stable comfort, and local HVAC expertise.

Take a tour of the installation
Each number is a point we check on site. Switch between summer and winter to watch air and heat move.
In summer, the outdoor unit rejects the house's heat outside.
Generic illustration of this type of installation, not a survey of this job site. Tap a number.
It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.
The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.
A shut-off switch near the outdoor unit isolates it safely for service.
Sitting on the indoor module, it moves heat between the house air and the refrigerant.
Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.
Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.
It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.
It runs the heat pump and the backup heat. It must be compatible with the installed system.
A compact and neat installation in a typical Old Montreal mechanical room
In Old Montreal, HVAC installations rarely follow a standard approach. Buildings are often older, mechanical spaces are restricted, existing ducts may have been modified over the years, and each replacement must be precisely planned to meet site constraints without compromising system performance. This is exactly the context in which our AirGreen team installed a 2-ton MIDEA EVOX G3 electric furnace, used as a central system – air handler to ensure efficient, stable, and comfortable air distribution throughout the property.
This installation perfectly illustrates the type of project where technical expertise makes a tangible difference. At first glance, the mechanical space seemed straightforward: a central unit to replace or integrate, an existing duct network, a nearby electrical panel, and a wall configuration allowing connections to pass through. In practice, several details needed verification: alignment with the return and supply ducts, unit stability, clearance management, quality of electrical connections, sealing around metallic transitions, and the clean integration of lines and visible accessories in the photo.
At AirGreen, we know that a successful HVAC installation is not limited to placing a device in the right spot. It relies on a set of technical decisions that directly influence comfort, durability, noise, safety, and ease of maintenance. In this Old Montreal project, our priority was clear: to install a compact, clean, accessible central system adapted to the realities of an urban building where every available inch counts.
A MIDEA EVOX G3 central unit designed for efficient residential comfort
The 2-ton MIDEA EVOX G3 installed here is an indoor unit of the electric furnace / air handler type, integrated into a central system. This type of equipment plays an essential role in a residence's comfort: it circulates conditioned or heated air through existing ducts, ensures homogeneous distribution in rooms, and can be paired with a compatible central heat pump depending on the project configuration.
In a property located in Old Montreal, this choice is particularly relevant when the client wants to maintain central air distribution rather than multiplying wall-mounted units. The central system helps preserve interior aesthetics, maintain more discreet comfort, and leverage an already existing duct network.
The 2-ton capacity, or approximately 24,000 BTU, is generally suitable for moderately sized residential spaces, subject to a complete thermal load evaluation. At AirGreen, we never recommend a capacity based solely on square footage. We take several factors into account:
- building insulation;
- sun exposure;
- number of floors served;
- duct quality and configuration;
- ceiling height;
- thermal losses related to exterior walls;
- presence of large windows, common in some condos and units in the Old Montreal area;
- type of outdoor system paired with the indoor unit.
This approach avoids two common mistakes: installing an undersized unit, which runs continuously, or an oversized unit, which cycles too quickly and negatively affects comfort and humidity control.
What the image reveals about the project's real complexity
The photo of this installation shows several important elements. The MIDEA EVOX G3 unit is installed in a tight space, between an existing metal duct network and a wall where connections pass through. To the right, the proximity of the electrical panel is also notable, requiring careful attention to clearances, wire routing, and overall installation compliance.
The top of the unit is connected to an existing metallic transition. This part is essential: a poor transition between the air handler and the duct network can create pressure losses, air leaks, vibrations, or undesirable noises. In this type of configuration, our team must precisely adjust the unit so that the airflow circulates correctly without unduly forcing the fan motor.
Connections running up the wall are also visible, neatly protected and grouped. In a central installation, attention to visual detail is not just aesthetic. Clean routing facilitates future inspections, reduces the risk of accidental damage, and simplifies HVAC maintenance interventions.
The base of the unit also shows the hydraulic and drainage connections, which must be installed with care. A bad slope, a fragile connection, or a poorly secured pipe can lead to water problems, especially in a mechanical room where access is limited. Our job is therefore to anticipate these risks even before the system is put into service.
A replacement or integration that requires a true understanding of the building
Central system projects in areas like Montreal, Laval, Longueuil, the North Shore, and the South Shore may seem similar on paper. However, each building imposes its own constraints. In Old Montreal, mechanical rooms are often narrower, walls are less easy to modify, and existing ducts may have been adapted several times over renovations.
In this specific case, the team had to work with a configuration where the unit had to fit precisely into the available space without blocking important access points. The electrical panel visible nearby highlights the importance of respecting necessary clearances for future maintenance and interventions. An installation that is too tight or poorly oriented can complicate maintenance, lengthen service times, and increase long-term costs.
We therefore paid particular attention to three aspects:
Alignment with the existing duct network
The unit had to be positioned to integrate neatly under the metallic transition. Poor alignment could have required more invasive modifications, created air leaks, or negatively impacted the system's overall performance. Ductwork is an often underestimated part of an HVAC installation, yet it directly influences the comfort felt in the rooms.
Unit stability and accessibility
A central electric furnace must be stable, well supported, and accessible. Panels must be removable when needed, connections must remain visible, and internal components must remain reachable for service. In this project, the available space required a compact installation, but without sacrificing the possibility of proper intervention later.
Cleanliness of connections
The lines visible in the photo show organized work, with grouped and secured passages. This detail reflects an approach we systematically apply: a clean installation is an easier-to-diagnose, more reliable, and more professional installation. For a client, this may seem secondary at the time of installation. For a technician, it's often what saves time during a service visit years later.
Why this type of central installation is strategic for an urban building
In many properties in Old Montreal, a central system represents a very attractive solution. Wall-mounted units can be effective in certain contexts, but they are not always suitable for interior design, co-ownership rules, or the client's aesthetic preferences. A MIDEA EVOX G3 central air handler allows for discrete ducted distribution while modernizing the core of the HVAC system.
More uniform comfort in served rooms
When a duct network is well-designed and balanced, a central system can offer very pleasant comfort. Air circulates to multiple rooms from a single indoor unit, which limits significant temperature differences from one zone to another. In residential units in the Montreal area, this can make a big difference, especially when certain rooms are exposed to the sun for part of the day while others remain cooler.
The installation of a new air handler also improves distribution quality when the old unit was noisy, poorly sized, or less efficient. Even when existing ducts are retained, replacing the indoor unit can offer more stable, quieter operation better suited to current needs.
A discreet solution to preserve interior appearance
In Old Montreal, many clients want to improve their comfort without adding visible equipment in main rooms. A central system meets this expectation well. The unit is placed in a mechanical room, and air is distributed through existing grilles. For condos, lofts, or renovated spaces with particular attention to interior design, this discretion becomes a significant advantage.
A better foundation for a high-performance central heat pump
The installed indoor unit can be part of a central system with a heat pump, depending on the chosen combination. Energy performance, AHRI values, consumption, and eligibility for subsidies depend on the complete pairing between the indoor and outdoor units. This is an essential point that we always explain to clients.
For programs like LogisVert or other available aids, eligibility is not confirmed solely by the brand or advertised capacity. It depends on the exact model, certified pairing, and current requirements at the time of the project. At AirGreen, we verify these details before presenting a final recommendation to avoid unpleasant surprises.
Mistakes to avoid when installing a central electric furnace
An installation like this may seem simple to an untrained eye, but several errors can impair system performance. Here are the most common ones.
Choosing a capacity without serious calculation
A 2-ton unit may be ideal in some homes and insufficient in others. Capacity must be linked to the building's actual needs. Poor evaluation can cause discomfort, short cycles, excessive consumption, or premature wear.
Neglecting the condition of the ducts
A new unit installed on a deficient duct network will not perform at its best. Before and during installation, we check transitions, visible connections, potential leaks, restrictions, and possibilities for improvement. In older buildings in Montreal, this step is particularly important.
Blocking service access
A unit too cramped against a wall, panel, or obstruction becomes difficult to maintain. Even if space is limited, access to panels, connections, filters, and internal components must be provided. In this project, the location was handled with care to reconcile compactness and serviceability.
Underestimating water and drainage management
Drains, fittings, and slopes must be installed correctly. A slow leak in a mechanical room can go unnoticed until it causes damage. That's why we pay particular attention to lower connections and points where water could accumulate.
Accepting approximate finishing
Cable passages, insulation, wall openings, and fastenings are not minor details. A clean finish reflects a better thought-out and more durable installation. On this MIDEA EVOX G3 installation, the organization of lines and the compactness of the work were essential given the available space.
The AirGreen Approach: Precision, Transparency, and Building Adaptation
Our method is based on a complete understanding of the project before installation. We analyze the existing equipment, duct network, access points, electrical constraints, client needs, and subsidy possibilities. This approach allows us to recommend the right solution rather than forcing a configuration that does not suit the building.
In the case of this installation in Old Montreal, our team worked with a logic of precision. The unit had to be well-aligned, connections had to remain orderly, and the whole system had to fit into a restricted mechanical space without complicating future interventions.
This working method also applies to our projects in Laval, Longueuil, on the North Shore, and on the South Shore. Whether it's an urban condo, a single-family house, a duplex, a rental building, or a light commercial building, we adapt our intervention to the real context. The right equipment is important, but the quality of the installation is just as crucial.
What the client gains with a well-executed installation
A properly installed MIDEA EVOX G3 2-ton electric furnace can offer several concrete benefits:
- better air distribution in the served rooms;
- discreet integration into a central system;
- a reliable base for pairing with a compatible heat pump;
- more stable comfort in heating and cooling depending on the configuration;
- a compact installation adapted to tight mechanical spaces;
- simpler access for HVAC maintenance;
- a cleaner and more durable finish;
- better long-term value for the property.
In an area like Old Montreal, where buildings often combine architectural charm with technical constraints, this long-term value is particularly important. An approximate installation can become costly. A well-thought-out installation becomes an investment in comfort, safety, and peace of mind.
Practical Advice for Homeowners Considering a Central System
Before replacing or installing a central air handler, a few checks are highly recommended.
Have existing ducts inspected
Even if the old system was working, it doesn't mean the ducts are optimal. Leaks, restrictions, or poorly designed transitions can reduce the performance of a new unit.
Check for full system compatibility
The brand, indoor model, outdoor model, and capacity must be compatible. For subsidies, recognized combinations must also be validated.
Think about maintenance from the start
Access to filters, panels, and internal components must be planned from the outset. A system that is difficult to maintain risks being neglected, even if it is of good quality.
Compare overall value, not just the price
A lower price may hide a less meticulous installation, unincluded accessories, or insufficient finishing. In HVAC, installation quality influences the result as much as the chosen equipment.
A Representative Achievement of AirGreen's Work in Montreal
This installation of a MIDEA EVOX G3 2 tons in Old Montreal truly represents our vision of the trade: recommending the right system, respecting building constraints, working cleanly, and delivering a reliable installation. The visible result in the photo shows a well-integrated central unit, organized connections, and execution adapted to a tight mechanical space.
For homeowners evaluating an HVAC installation in Montreal, Laval, Longueuil, on the North Shore or on the South Shore, this type of project reminds us of an essential point: the choice of equipment matters, but the installer's expertise matters just as much. A well-installed central electric furnace or air handler can transform a building's comfort while simplifying future maintenance.
At AirGreen, we approach each project as a tailor-made solution. In this mechanical room in Old Montreal, the priority was not just to install a MIDEA unit. It was to create a durable, accessible, clean, and consistent installation with the client's actual needs. It is this rigor that allows a central system to operate efficiently for years.
The big day, step by step
The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.
We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
The equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
Access protected, old unit disconnected and removed when it is being replaced.
Electric furnace or air handler, with its coil, connected to the supply and return ducts.
On a level base, raised above the snow, with free space all around.
Insulated, they enter through a sealed opening and run to the indoor coil.
Dedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
Leak test, vacuum, start-up, airflow check and a test of both modes.
Filter, thermostat, backup heat in extreme cold: what to know before winter.
- The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
- The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
- Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
- The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
- The outdoor unitOn a level base, raised above the snow, with free space all around.
- The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
- Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
- Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
- The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
What would it look like at your place?
Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.
Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.
Four mistakes we do not make
Flip each card to see what we do instead.
Your own project, step by step
What to do, season by season
Three habits per season for this unit. They take a few minutes and prevent many calls.
- Check the indoor module's filter.
- Clear winter debris from the outdoor unit.
- Test cooling before the heat arrives.
- Check the filter more often in peak season.
- Keep registers and returns clear.
- Watch condensate drainage near the coil.
- Change or clean the filter.
- Test heating and backup heat before the cold.
- Book periodic maintenance.
- Clear snow around the outdoor unit.
- Store nothing in front of the indoor module.
- Note any unusual noise or smell and call us.
Is your home ready?
Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.
Four statements: true or false?
It all comes down to details you have just seen.
1. A central heat pump uses the house's ducts.
It connects to the existing ducts to heat and cool everywhere.
2. In extreme cold, electric backup heat can take over.
The indoor module (furnace or air handler) works with the heat pump and takes over in extreme cold.
3. The filter only gets changed when the unit breaks down.
A dirty filter cuts airflow. It gets checked regularly.
4. You can reuse the old unit's size without checking.
The house may have changed: insulation, windows, added rooms. Capacity is confirmed on site.
0 / 4 right answers
What people ask us about this kind of work
Can I keep my current ducts?
What happens in extreme cold?
Furnace, air handler, ducted: what is the difference?
Are there grants?
Do I need a permit?
How much can I save?
How is the LogisVert assistance calculated?
Will my current thermostat work?
Central or wall units: which one?
Does AirGreen hold the required licences?
Is the estimate free?
No question matches. Write to us: we answer.
More jobs to see, near you
By town, by equipment or by region: browse more than 4,700 published projects.
Each dot: a town where AirGreen has published projects. The glowing dot: this job.
Every house has its constraints. We see them before we install.
The on-site estimate is free and the quote follows within 24 hours.
Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).