Project

Installation of an ELIOS R454B central heat pump in Noyan, Montérégie

In Noyan, AirGreen installs an ELIOS R454B central heat pump on a wall bracket, with careful attention to clearances, snow, vibrations, piping, and HVAC system performance.

By AirGreen Climatisation & Chauffage Admin15 min read
Installation of an ELIOS R454B central heat pump in Noyan, Montérégie
Installation of an ELIOS R454B central heat pump in Noyan, Montérégie
Generic diagram: central heat pump, indoor module and ducts

In summer, the outdoor unit rejects the house's heat outside.

Generic illustration of this type of installation, not a survey of this job site. Tap a number.

  1. It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.

  2. The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.

  3. A shut-off switch near the outdoor unit isolates it safely for service.

  4. Sitting on the indoor module, it moves heat between the house air and the refrigerant.

  5. Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.

  6. Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.

  7. It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.

  8. It runs the heat pump and the backup heat. It must be compatible with the installed system.

A compact outdoor installation adapted to a property where every clearance detail mattered

In Noyan, in Montérégie, our AirGreen team installed a ELIOS central heat pump operating with R454B refrigerant on a property whose exterior layout presented several practical constraints. The available space was located between two sections of the building, near a downspout, an eave, vinyl siding, and a masonry wall.

This type of environment requires much more than simply securing the outdoor unit. A position must be selected that facilitates airflow, protects the unit from snow accumulation, limits vibrations transmitted to the structure, and provides reasonable access for future HVAC maintenance.

In the photo of this installation, the ELIOS outdoor unit is mounted on a metal wall bracket, above ground level. This approach directly addresses the climatic realities of Noyan and the Greater Montreal area: windblown snow, ice, meltwater, fallen leaves, and moisture around the foundation.

Why install the outdoor unit on a wall bracket?

Mounting the unit on a wall bracket is not purely an aesthetic choice. In this project, it made it possible to keep the unit at an appropriate height while making effective use of a narrow area alongside the masonry.

A raised installation can offer several benefits:

  • reduced risk of snow blocking the air intake or discharge;
  • protection against water accumulation near the foundation;
  • easier clearance beneath the unit;
  • reduced contact with the ground, grass, and debris;
  • optimal use of a property where ground space is limited;
  • more convenient access to the refrigeration and electrical connections.

The choice of support must nevertheless take into account the actual weight of the equipment, the composition of the wall, and the vibrations produced during operation. A central heat pump must never be installed on an improvised or undersized fastening. The anchors, metal arms, and support points must form a stable assembly capable of withstanding start-up cycles, winds, and winter conditions.

A fastening made on a section of masonry

In this installation in Noyan, the brick wall was a more suitable surface for mounting the support than the adjacent vinyl siding. Masonry allows for a rigid fastening when it is properly assessed and drilled.

Our technicians must, among other things, avoid:

  • weakened mortar joints;
  • cracked or damaged bricks;
  • areas too close to an edge;
  • anchors that could damage the building envelope;
  • a position that would unnecessarily transmit vibrations to a sensitive room.

The support visible beneath the unit consists of two arms reinforced with diagonal sections. This geometry distributes the load against the wall and keeps the unit away from the masonry. The space behind the equipment is essential to allow air to circulate and to provide access to the components during an inspection or repair.

A narrow location between several building elements

The selected area is located near a vertical downspout, two building sections, and various roof overhangs. These elements had to be considered even before drilling began.

A downspout may seem harmless, but it carries a significant amount of water during heavy rain and snowmelt. The outdoor unit must be positioned so that it does not receive this water directly. A leak or overflow from the gutter could cause ice to form on or around the heat pump.

Roof overhangs deserve the same attention. They can partially protect the unit, but they can also concentrate water runoff in one specific location. In winter, icicles or sheets of snow may also fall from the roof. We therefore assess the likely behavior of water and snow, not just the visible clearance on the day of installation.

Outdoor airflow that must not be overlooked

The outdoor unit of a heat pump exchanges heat with the surrounding air. Its performance therefore depends on adequate airflow around the heat exchanger and in front of the fan.

Even when an appliance appears to physically fit in a space, that does not automatically mean the space is suitable. A unit placed too close to a side wall, fence, soffit, or other equipment may draw in some of the air it has just discharged. This recirculation can reduce performance, lengthen operating cycles, and complicate defrosting in winter.

In this project, the unit’s ventilated face remains completely unobstructed. The fan can discharge air directly into the open space, with no immediate obstacle in front of the grille.

We always comply with the clearances prescribed by the manufacturer for the installed model. These distances may vary from one series to another; they should therefore not be determined based on a general rule or the appearance of the appliance.

R454B Refrigerant: A New Generation of HVAC Equipment

The mention R454B refers to the refrigerant used by the system and not, on its own, to the heat pump’s capacity. This distinction is important for homeowners comparing several quotes.

R454B is used in a new generation of heat pumps and air conditioners to reduce the climate impact associated with refrigerants. Its use also entails specific requirements for handling, tools, installation, and commissioning.

R454B belongs to the category of mildly flammable refrigerants, commonly designated A2L. This does not mean that a properly installed appliance poses any particular danger to the occupant. Rather, it means that technicians must follow procedures adapted to this refrigerant:

  • use compatible instruments;
  • carefully check the tightness of the connections;
  • thoroughly evacuate the circuit;
  • comply with the charge limits and manufacturer’s requirements;
  • maintain a safe work area;
  • follow the prescribed recovery and commissioning procedures.

At AirGreen, we view the refrigerant change as a technical evolution that requires training, precision, and a complete understanding of the equipment. It is not enough to connect a new machine using the same practices used with older systems.

A central heat pump is not limited to the unit visible outdoors

The photograph primarily shows the ELIOS outdoor unit, but a central heat pump installation comprises several components that work together.

Depending on the building’s configuration, the indoor system may include an air handler, a coil, a compatible furnace, a central fan, a thermostat, and a duct network. The final result depends on the balance among all these components.

Before installation, we must verify or determine:

  • the required heating and cooling capacity;
  • the condition of the existing ducts;
  • the available airflow;
  • the building’s electrical capacity;
  • compatibility between the indoor and outdoor components;
  • the refrigeration line size;
  • the auxiliary heating strategy;
  • the thermostat location;
  • condensate drainage in cooling mode.

A quality outdoor unit cannot compensate for a duct system that is too restrictive, an undersized filter, or an improperly configured fan. That is why we approach every HVAC installation as a complete system rather than simply replacing an outdoor box.

BTU capacity must be calculated, not guessed

The exact capacity of this unit cannot be read from the photograph. We therefore avoid arbitrarily assigning it a capacity of 24,000, 30,000, 36,000, or 48,000 BTU based on its exterior dimensions.

Two appliances that look similar may offer very different capacities and features. Sizing must be based on the property’s heating and cooling needs and the exact technical data for the installed combination.

Factors that influence the calculation include:

  • the heated floor area;
  • the insulation level;
  • the building’s airtightness;
  • the number and quality of the windows;
  • the property’s orientation;
  • ceiling height;
  • the layout of the floors;
  • basement heat loss;
  • wind exposure;
  • the region’s design outdoor temperature.

An undersized heat pump may run continuously without maintaining the desired temperature during very cold periods. An oversized unit may produce excessively short cycles, less stable humidity control, and less uniform air distribution.

At Noyan, as in Montréal, Laval, Longueuil, on the North Shore and the South Shore, sizing must take Quebec’s winter conditions into account, not just summer cooling needs.

The importance of refrigeration piping

The pipes between the outdoor unit and the indoor system carry the refrigerant. Their diameter, length, insulation, and tightness directly affect the heat pump's operation.

During an installation, we pay particular attention to the following:

  • using the diameters required by the manufacturer;
  • protecting the insulation from the weather;
  • forming clean, even bends;
  • preventing rubbing against the masonry;
  • flared or brazed connections made according to the system design;
  • leak testing;
  • vacuuming before commissioning;
  • adding refrigerant only when required by the total length.

On this property, the connections were arranged behind and beneath the unit to reduce their exposure and maintain a neat visual result. A clean installation also makes future inspections easier: a technician can follow the route of the pipes without having to dismantle a buildup of cables or poorly secured materials.

Vibration and noise management

The noise from a heat pump does not depend solely on the decibel rating published by the manufacturer. How the unit is installed can amplify or reduce vibrations.

With a wall-mounted support, we must pay particular attention to mechanical transmission to the structure. The fasteners must be secure, but the unit must also be properly seated on its support points. Anti-vibration components may be used depending on the configuration and applicable requirements.

We also check that:

  • the chassis does not directly touch the wall;
  • no pipe vibrates against the brick;
  • the unit's panels are properly closed;
  • the support is level;
  • the connections are not under stress;
  • the nearby downspout cannot strike the unit.

These details are particularly important when a bedroom or living space is located on the other side of the wall.

Commissioning: the step that confirms installation quality

Once the mechanical and electrical work is complete, commissioning verifies the system's actual performance.

Depending on the equipment, our checks may include:

  1. confirming the electrical voltage;
  2. inspecting the safety devices and wiring;
  3. starting the system in heating and cooling modes;
  4. checking the indoor fan;
  5. measuring supply and return temperatures;
  6. confirming condensate drainage;
  7. observing the prescribed pressures and parameters;
  8. checking for vibrations;
  9. testing the controls and thermostat;
  10. the explanation of how it works to the homeowner.

This step helps identify an issue before it turns into a service call. It also confirms that the indoor and outdoor components are communicating properly.

This Noyan project illustrates our custom installation approach

A discreet result despite complex architecture

The ELIOS unit was integrated into an outdoor space where brick, foundation, vinyl siding, roofing, and stormwater drainage meet. Despite this irregular geometry, the result remains compact and functional.

The chosen location makes it possible to:

  • to keep the outdoor fan clear;
  • to elevate the unit;
  • to use a sturdy mounting surface;
  • to keep the connections grouped together;
  • to preserve circulation space around the building;
  • to avoid placing the unit directly on the ground.

This type of project shows why a site visit, precise measurements, and an analysis of the building envelope remain essential. The best location is not always the most obvious at first glance.

Mistakes to avoid during a similar installation

For a central heat pump installed in a tight area, several mistakes can reduce the system’s lifespan or performance.

Installing the unit too close to an obstacle

Insufficient clearance impairs heat exchange and complicates maintenance. The clearances specific to the selected ELIOS model must be checked.

Neglecting snow accumulation or roof runoff

A unit placed beneath a runoff area may be exposed to water, ice, or a heavy snow load.

Attaching the support only to decorative siding

Vinyl, aluminum, or certain siding materials are not necessarily load-bearing structures. The anchors must reach an appropriate support.

Guessing the capacity based on the old equipment

Replacing an old heat pump with a new unit of the same capacity is not always the best solution. The building’s needs may have changed, and the old system may already have been improperly sized.

Automatically reusing existing lines

The diameters, insulation condition, internal cleanliness, and compatibility with the new refrigerant must be verified. The fact that a line is already in place does not guarantee that it is suitable for the new R454B appliance.

Forget access to the service

The panels, valves, and electrical components must remain accessible. An installation tightly positioned against several walls can make a simple repair unnecessarily complicated.

Recommended maintenance after installation

To preserve the performance of an ELIOS central heat pump, the owner should regularly inspect the area around the outdoor unit.

It is recommended to:

  • clear away snow without striking the unit;
  • remove leaves and vegetation from around the coil;
  • monitor abnormal ice buildup;
  • check that the gutter and downspout are not leaking;
  • replace or clean the indoor filter according to the recommendations;
  • never completely cover the unit during the winter;
  • schedule an inspection when the system produces an unusual noise or has difficulty maintaining the temperature.

A light layer of frost is normal in heating mode. The heat pump periodically performs a defrost cycle. However, a persistent layer of ice that blocks the coil should be professionally inspected.

Rebates and eligibility: always verify the exact combination

Some heat pumps may qualify for financial assistance, particularly when they meet the criteria of a current program. However, eligibility cannot be confirmed solely based on the ELIOS brand or the R454B designation.

You generally need to verify the complete combination of the indoor and outdoor model numbers, the applicable certification reference, the recognized capacity, and the program conditions at the time of purchase.

We therefore recommend never basing a financial decision on a general verbal estimate. Quotation and billing documents must clearly identify the proposed equipment.

AirGreen serving Noyan and Greater Montreal

This ELIOS R454B central heat pump installation in Noyan reflects our approach: examining the actual location, anticipating winter constraints, protecting airflow, and carrying out a complete commissioning.

We install and replace HVAC systems in Montreal, Laval, Longueuil, on the North Shore, on the South Shore, and in several municipalities in Montérégie. Each building has a different combination of ductwork, electrical capacity, insulation, and architectural constraints.

Our work consists of choosing and installing a system suited to these realities, rather than applying the same solution to every property.

The steps

How it goes, from the first call to the end

The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

Step 1 of 9The on-site estimate

We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.

  1. The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
  2. The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
  3. Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
  4. The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
  5. The outdoor unitOn a level base, raised above the snow, with free space all around.
  6. The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
  7. Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
  8. Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
  9. The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
Your numbers

And at your place?

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Size checkYour electric furnace, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Check the indoor module's filter.
    • Clear winter debris from the outdoor unit.
    • Test cooling before the heat arrives.
    And at your place?

    Which type of equipment for your project?

    Pick what looks like your need.

    Mistakes avoided

    Four mistakes we do not make

    Flip each card to see what we do instead.

    Frequently asked questions

    What people ask us about this kind of work

    11 questions
    Can I keep my current ducts?
    Often, yes: the central heat pump connects to the existing ducts. We check their condition and size during the estimate.
    What happens in extreme cold?
    The indoor module (furnace or air handler) works with the central heat pump and takes over in extreme cold.
    Furnace, air handler, ducted: what is the difference?
    The furnace or air handler is the indoor module of the central system. A ducted system hides in the ceiling: all you see are small supply grilles.
    Are there grants?
    Depending on the equipment and your situation, assistance programs may apply. AirGreen checks the exact combination before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city. See permits and by-laws, and we check for your address.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Will my current thermostat work?
    Not always: the thermostat has to run the heat pump and the backup heat. We check compatibility during the estimate.
    Central or wall units: which one?
    If the house has ducts in good shape, a central system heats and cools every room at once. Without ducts, wall units or a multi-zone are often simpler. We compare on site.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.
    Going further

    Useful pages for what comes next

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    Tell us about your house. We come and see it for free.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment