Project

Installation of a MIDEA EVOX G3 3-ton central heat pump in Blainville (North Shore)

AirGreen Project in Blainville: installation of a MIDEA EVOX G3 3-ton central heat pump. Winter performance, energy efficiency, and superior comfort on the North Shore.

By AirGreen Climatisation & Chauffage Admin6 min read
Installation of a MIDEA EVOX G3 3-ton central heat pump in Blainville (North Shore)
Installation of a MIDEA EVOX G3 3-ton central heat pump in Blainville (North Shore)
–chapters in this story
6 minreading time
–type of installation
2026year published
The tour

Take a tour of the installation

Each number is a point we check on site. Switch between summer and winter to watch air and heat move.

Generic diagram: central heat pump, indoor module and ducts

In summer, the outdoor unit rejects the house's heat outside.

Generic illustration of this type of installation, not a survey of this job site. Tap a number.

  1. It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.

  2. The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.

  3. A shut-off switch near the outdoor unit isolates it safely for service.

  4. Sitting on the indoor module, it moves heat between the house air and the refrigerant.

  5. Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.

  6. Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.

  7. It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.

  8. It runs the heat pump and the backup heat. It must be compatible with the installed system.

The job

An efficient HVAC solution perfectly adapted to the climate realities of the North Shore

At AirGreen, every HVAC installation project is an opportunity to demonstrate our rigor, our field expertise, and our ability to adapt the best technologies to the real needs of Quebec residences. This recent installation of a MIDEA EVOX G3 central heat pump in Blainville perfectly illustrates our approach: technical precision, energy optimization, and attention to detail at every step.

The client, owner of a single-family home on the North Shore, wanted to replace an old, aging central system that had become inefficient during periods of extreme cold. Their objective was clear: to obtain a reliable, quiet solution, capable of maintaining a stable temperature even in harsh winters, while reducing their energy bill.

A central installation designed for year-round comfort

Initial analysis and specific project challenges

From our first visit to Blainville, we conducted a complete evaluation of the existing system:

  • Inspection of ventilation ducts
  • Analysis of the building's thermal capacity
  • Verification of insulation and heat loss
  • Study of the optimal location for the outdoor unit

One of the main challenges of this installation concerned the restricted space around the exterior foundation, as visible in the photo. The unit had to be installed on a robust wall bracket to:

  • Prevent snow accumulation in winter
  • Reduce vibrations transmitted to the building
  • Optimize air circulation around the appliance

Thanks to our expertise in central heat pump installation in Montreal, Laval, and the North Shore, we quickly proposed a stable, durable solution that complies with best practices.


Model selection: MIDEA EVOX G3 3 tons

The choice of the MIDEA EVOX G3 central heat pump was a natural fit due to its advanced technical characteristics:

  • Cooling capacity: 36,000 BTU
  • Heating performance down to -30°C
  • SEER2: 17.7
  • HSPF2: 10.0
  • ENERGY STAR® Cold Climate Certification
  • Ecological refrigerant R-454B
  • Integrated WiFi for smart control

This model is particularly suitable for properties in Blainville and the North Shore, where temperature variations are frequent and sometimes extreme.


Installation process: AirGreen's rigor and precision

Preparation and installation of the outdoor unit

The outdoor unit was installed on a raised wall mount, securely attached to the building structure. This technical choice offers several advantages:

  • Protection against snow and ice
  • Improved system durability
  • Easy access for HVAC maintenance

We also paid particular attention to:

  • Perfect unit alignment
  • Vibration absorption
  • Compliance with recommended clearance distances

Piping and wiring management

To ensure optimal performance, we carried out:

  • Careful installation of refrigerant lines (3/8 - 3/4)
  • Complete insulation to prevent any energy loss
  • Discreet routing of lines to preserve the exterior aesthetic

A critical point often overlooked by other installers is vacuum testing (micron test). At AirGreen, we systematically perform:

  • A stable deep vacuum
  • A complete leak check
  • Total elimination of moisture in the circuit

This prevents micro-leaks and ensures the longevity of the system.


Indoor unit installation

The indoor unit (air handler) was installed in the existing technical space, with:

  • Perfect integration with ducts
  • Airflow optimization thanks to Constant Airflow 2.0 technology
  • Compatibility with high-efficiency filters (MERV 13)

Result: uniform heat distribution throughout the house.


Concrete results for the client

Upon commissioning, the benefits were immediate:

Improved thermal comfort

  • Stable temperature throughout the house
  • Reduced temperature differences between floors
  • Efficient heating even on very cold nights

Noise reduction

  • Controlled outdoor sound level (62.5 dB(A))
  • Virtually imperceptible indoor operation

Energy savings

Thanks to Inverter technology, the system continuously adjusts its power:

  • Fewer on/off cycles
  • Optimized electricity consumption
  • Significant reduction in the monthly bill

Available subsidy: a major financial advantage

For this installation in Blainville, the client benefited from the LogisVert subsidy, which could reach approximately $3,720 (according to recent updates).

At AirGreen, we systematically assist our clients with:

  • Eligibility verification
  • Document preparation
  • Application submission

This greatly simplifies the process and maximizes savings.


Practical advice for homeowners

What to avoid when installing a central heat pump

  • Choosing an unsuitable capacity (too low or excessive)
  • Neglecting the quality of the installation
  • Ignoring the importance of vacuum testing
  • Installing the outdoor unit too close to the ground

Recommended best practices

  • Hiring a certified and experienced contractor
  • Checking ENERGY STAR® certifications
  • Opting for a system adapted to Quebec's climate
  • Planning annual HVAC maintenance

Why choose AirGreen for your HVAC installation in Blainville, Laval, or Montreal

Our approach is based on simple but essential principles:

Advanced technical expertise

Our refrigeration technicians master complex installations, whether for:

  • Single-family homes
  • Duplexes and triplexes
  • Multi-unit properties

Total transparency

  • Detailed quotes
  • No hidden costs
  • Payment only when the client is satisfied

Reliable after-sales service

  • Fast support
  • Personalized follow-up
  • Adapted maintenance options

An installation that reflects our quality standard

This MIDEA EVOX G3 central heat pump installation in Blainville clearly demonstrates the importance of professional execution. Every detail matters: from the positioning of the outdoor unit to the calibration of the indoor airflow.

The client now benefits from:

  • Year-round consistent comfort
  • A durable and efficient system
  • An energy-optimized solution for Quebec winters

At AirGreen, we continue to carry out similar installations throughout Montreal, Laval, Longueuil, the North Shore, and the South Shore, with the same level of demanding standards.


Conclusion: a strategic choice for the future

Investing in a MIDEA EVOX G3 central heat pump represents much more than a simple equipment replacement. It is a thoughtful decision aimed at:

  • Reducing energy costs
  • Improving indoor comfort
  • Increasing property value

For any HVAC installation in Blainville or elsewhere in the greater Montreal area, our team remains a reliable, experienced, and results-oriented reference.

The unit

The unit on this job, in figures

The range as published on airgreen.ca: pick a size to see its capacity in deep cold.

The range, size by size
SizeHeating at −8 °CHeating at −15 °CColdest certified pointCOP at −15 °CSEERHSPFIndicative LogisVert aid
Midea EVOX G3 · 1.5 tons14,70018,600−30 °C: 11,8002.1219.010.1$1,764
Midea EVOX G3 · 2 tons20,80020,600−30 °C: 12,1002.1418.610.0$2,496
Midea EVOX G3 · 2.5 tons24,00033,200−30 °C: 17,9001.9717.210.8$2,880
Midea EVOX G3 · 3 tons33,00037,400−30 °C: 27,6001.918.010.0$3,960
Midea EVOX G3 · 4 tons39,50048,000−30 °C: 27,2002.017.59.5$4,740
Midea EVOX G3 · 5 tons45,00054,000−30 °C: 37,3001.917.59.5$5,400

Data read live from the airgreen.ca page of each size (NEEP / AHRI certified performance). When the title names the installed size, it is highlighted; otherwise the whole range is shown. The aid shown is today’s, using Hydro-Québec’s rule ($120 per 1,000 BTU/h at −8 °C); amounts quoted in the article date from its publication. Only Hydro-Québec confirms the assistance granted.

The steps

The big day, step by step

The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

Step 1 of 9The on-site estimate

We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.

  1. The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
  2. The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
  3. Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
  4. The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
  5. The outdoor unitOn a level base, raised above the snow, with free space all around.
  6. The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
  7. Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
  8. Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
  9. The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
Your numbers

What would it look like at your place?

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Before / afterThe cost of the same heat

Baseboards and electric furnaces turn 1 kWh of electricity into 1 kWh of heat. A heat pump delivers more: that is its COP. At Hydro-Québec’s rate D (11.142¢/kWh above 40 kWh a day, since 1 April 2026):

Before · baseboards11.142¢/kWh
After · heat pump–

Hydro-Québec: a heat pump can be up to three times more efficient than baseboards for heating in the colder months.

Estimate per kWh of heat, at the chosen temperature, using the certified COP from the product page. Taxes, access charge and backup heat not included.

Size checkYour electric furnace, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    Mistakes avoided

    Four mistakes we do not make

    Flip each card to see what we do instead.

    Going further

    Your own project, step by step

    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Check the indoor module's filter.
    • Clear winter debris from the outdoor unit.
    • Test cooling before the heat arrives.
    At your place

    Is your home ready?

    Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.

    0 / 6 checked
    True or false

    Four statements: true or false?

    It all comes down to details you have just seen.

    1. A central heat pump uses the house's ducts.

    2. In extreme cold, electric backup heat can take over.

    3. The filter only gets changed when the unit breaks down.

    4. You can reuse the old unit's size without checking.

    Frequently asked questions

    What people ask us about this kind of work

    11 questions
    Can I keep my current ducts?
    Often, yes: the central heat pump connects to the existing ducts. We check their condition and size during the estimate.
    What happens in extreme cold?
    The indoor module (furnace or air handler) works with the central heat pump and takes over in extreme cold.
    Furnace, air handler, ducted: what is the difference?
    The furnace or air handler is the indoor module of the central system. A ducted system hides in the ceiling: all you see are small supply grilles.
    Are there grants?
    Depending on the equipment and your situation, assistance programs may apply. AirGreen checks the exact combination before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city. See permits and by-laws, and we check for your address.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Will my current thermostat work?
    Not always: the thermostat has to run the heat pump and the backup heat. We check compatibility during the estimate.
    Central or wall units: which one?
    If the house has ducts in good shape, a central system heats and cools every room at once. Without ducts, wall units or a multi-zone are often simpler. We compare on site.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    Every house has its constraints. We see them before we install.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment