The job on one screen

The article, chapter by chapter
Strategic HVAC Installation in a Dense Urban Environment in Saint-Laurent
In Ville Saint-Laurent, our AirGreen teams recently completed a particularly technical HVAC installation of a FUJITSU ORION XLTH 12,000 BTU wall-mounted heat pump in a residential brick building. This project perfectly illustrates the real challenges faced in the field in Montreal and how a well-thought-out installation can transform indoor comfort while optimizing system durability.
The client wanted to replace an old, inefficient, noisy, and expensive system. Their objective was clear: to obtain reliable heating in winter, efficient air conditioning in summer, and above all, a clean, discreet, and durable installation.
Optimized Outdoor Configuration Despite Structural Constraints
Wall-mounted installation under concrete slab: a considered technical choice
The FUJITSU outdoor unit was installed on a solid wall bracket, fixed directly to a brick wall under a concrete slab. This configuration, visible on the job site, offered several strategic advantages:
- Natural protection against bad weather (snow, rain, ice accumulation)
- Reduced vibrations thanks to anti-vibration mounts
- Optimal ground clearance to avoid common winter problems in Montreal
However, this type of installation requires absolute precision. Our refrigeration technicians had to:
- Check the load-bearing capacity of the brick wall
- Use specific high-resistance anchors
- Install anti-vibration pads to limit sound transmission
Intelligent Management of Piping and Wiring
One of the key visible elements of this installation is the passage of refrigerant lines and electrical wiring. Unlike simpler installations, here we had to deal with:
- A narrow lateral passage between the unit and the wall
- Management of pipe bends without compromising refrigerant circulation
- Complete protection of lines with reinforced insulation
We used standard 1/4 – 3/8 piping, perfectly suited to this FUJITSU ORION XLTH model. The lines were carefully wrapped and secured to:
- Prevent thermal losses
- Avoid condensation
- Ensure long-term durability
Drainage and Condensate Evacuation
The drainage pipe visible on the installation was strategically positioned to ensure effective natural drainage. Poor drainage management is a common mistake in many HVAC installations in Montreal.
At AirGreen, we ensure to:
- Avoid any water stagnation
- Protect against freezing in winter
- Guarantee constant flow without obstruction
Exceptional Performance Adapted to Montreal Winters
A Heat Pump Designed for Extreme Cold
The FUJITSU ORION XLTH 12,000 BTU installed in this project is perfectly suited to the climatic conditions of Greater Montreal:
- Effective heating down to -26°C
- Modulable power thanks to Inverter technology
- Stable performance even during prolonged cold spells
In the case of this client in Ville Saint-Laurent, this means:
- Significant reduction in electric baseboard usage
- Constant thermal comfort in all rooms
- Notable decrease in energy costs
Energy Efficiency and Available Subsidies
This installation is eligible for the LogisVert subsidy of $1200, which strongly influenced the client's decision.
The energy performance of the system is remarkable:
- SEER2: 30.5
- HSPF2: 12.7
- ENERGY STAR® Cold Climate Certification
These data concretely translate into:
- Economical air conditioning during Montreal's hot summers
- Efficient and less costly heating in winter
A Quiet Installation Adapted to the Urban Neighborhood
In an area like Ville Saint-Laurent, noise is a critical factor. This heat pump offers:
- 23 dB(A) indoors – practically inaudible
- 47 dB(A) outdoors – ideal for residential areas
Thanks to anti-vibration mounts and the strategic position under the slab, we managed to:
- Minimize noise pollution
- Comply with local standards and respect immediate neighbors
Challenges Faced and Solutions Provided by AirGreen
Limited Access and Restricted Space
The job site presented restricted access, typical of many properties in Montreal. Our technicians had to:
- Adapt the installation without compromising quality
- Work in a small space while maintaining high standards
Aesthetic Integration
The client wanted a discreet installation. Therefore, we:
- Aligned the conduits along the wall for a clean look
- Reduced the visual impact of the wiring
- Used strong and discreet fasteners
Practical Tips for Similar Installations in Montreal and Laval
What to Absolutely Avoid
- Installing the outdoor unit too close to the ground
- Neglecting pipe insulation
- Underestimating the importance of drainage
- Using inadequate supports
Recommended Best Practices
- Always plan for an elevated installation
- Use anti-vibration supports
- Choose a wind-protected location
- Call on HVAC installation experts in Montreal
Why This Installation Reflects AirGreen's Expertise
This project in Ville Saint-Laurent clearly demonstrates our approach:
- Complete site analysis before installation
- Adaptation to real building constraints
- Clean, durable, and high-performance installation
- Adherence to technical and aesthetic standards
We don't just install systems — we design solutions adapted to the realities of the field in Montreal, Laval, Longueuil, the North Shore, and the South Shore.
Final Result for the Client
After commissioning, the client immediately noted:
- Rapid temperature rise
- Quiet operation
- Better air distribution
- Anticipated reduction in energy bills
This installation represents a smart investment, both in comfort and savings.
Conclusion: A Heat Pump Perfectly Suited to the Quebec Climate
The FUJITSU ORION XLTH 12,000 BTU wall-mounted heat pump is an ideal solution for urban properties in Ville Saint-Laurent and Greater Montreal. Combined with a professional installation by AirGreen, it guarantees:
- Durable performance
- Optimal comfort
- Energy profitability
At AirGreen, each project is a concrete demonstration of our expertise in heating, ventilation, and air conditioning (HVAC).
The job tools
Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.
Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.
How the job unfolds
The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.
We look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.
Model, capacity and price, in writing. We also check whether the model qualifies for assistance programs.
Floors and furniture protected, wall plate position marked level, wall opening located.
A single opening, with the slope the drain needs to flow outside.
Set on a stand raised above the snow, with the clearances the manufacturer requires.
Connected, insulated and protected. The opening is then sealed against water, cold air and insects.
A dedicated circuit and an accessible disconnect near the outdoor unit.
Leak test, vacuum, then start-up and a check of heating and cooling.
Remote, modes, filters: we show you the essentials before we leave.
- The on-site estimateWe look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.
- The quoteModel, capacity and price, in writing. We also check whether the model qualifies for assistance programs.
- Getting readyFloors and furniture protected, wall plate position marked level, wall opening located.
- The wall openingA single opening, with the slope the drain needs to flow outside.
- The outdoor unitSet on a stand raised above the snow, with the clearances the manufacturer requires.
- Lines, cable and drainConnected, insulated and protected. The opening is then sealed against water, cold air and insects.
- The electrical workA dedicated circuit and an accessible disconnect near the outdoor unit.
- Tests and start-upLeak test, vacuum, then start-up and a check of heating and cooling.
- The walkthroughRemote, modes, filters: we show you the essentials before we leave.
What we check on a job like this one
Each number is a point we check on site. Switch between summer and winter to watch air and heat move.
In summer, the outdoor unit rejects the house's heat outside.
Generic illustration of this type of installation, not a survey of this job site. Tap a number.
Mounted level on a wall plate, high enough for the air to reach the whole room, with enough space around it to slide the filters out easily.
The refrigerant lines, the communication cable and the drain go through the wall in a single opening, sealed against water, cold air and insects.
Two insulated copper pipes connect the two units. Outside, a line cover can protect them from sun, knocks and weather.
A shut-off switch near the outdoor unit isolates it safely for service. It must stay accessible at all times.
The compressor and the fan. In heating mode it captures heat from the outdoor air, even in winter, and moves it inside.
On the ground or on the wall, it keeps the unit above accumulated snow. The unit stays clear and defrost water can drain away.
The fan needs to blow freely. Storage, a fence or a wall too close, and efficiency drops while noise goes up.
Is your home ready?
Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.
Good habits, once the unit is in place
Six simple habits that keep the unit going. Your list stays on this device.
What to do, season by season
Three habits per season for this unit. They take a few minutes and prevent many calls.
- Clean the indoor unit's filters.
- Clear leaves and debris left on the outdoor unit by winter.
- Test cooling before the first hot days.
- Clean the filters more often when the unit runs a lot.
- Keep plants away from the outdoor unit.
- Check that no water drips from the indoor unit.
- Rake the leaves around the outdoor unit.
- Test heating before the first cold days.
- Book periodic maintenance before winter.
- Keep snow away from the stand and the front of the unit.
- Let the unit defrost: it is normal.
- Never hit the ice on the fins; call us if the unit stays iced up.
The right pages, at the right time
Four statements: true or false?
It all comes down to details you have just seen.
1. In heating mode, the outdoor unit can produce water.
During defrost cycles. That water must drain away without forming ice.
2. You pick the capacity with a simple square-footage rule.
Windows, insulation, orientation and how the room is used all count. Capacity is chosen on site.
3. A multi-zone connects several indoor heads to a single condenser.
One head per room, all on the same condenser. Each room keeps its own temperature.
4. The disconnect can sit behind the patio furniture.
It must stay accessible: it is what shuts the unit off for service.
0 / 4 right answers
What people ask us about this kind of work
Does a wall-mounted heat pump heat in winter?
Wall-mounted or multi-zone: how do I choose?
Where does the outdoor unit go?
Are there grants?
Do I need a permit?
How cold can it heat?
How much can I save?
How is the LogisVert assistance calculated?
Is it noisy?
The outdoor unit is covered in ice: is that normal?
Does AirGreen hold the required licences?
Is the estimate free?
No question matches. Write to us: we answer.
More jobs to see, near you
By town, by equipment or by region: browse more than 4,700 published projects.
Each dot: a town where AirGreen has published projects. The glowing dot: this job.
An on-site estimate, the right capacity, the right equipment.
The on-site estimate is free and the quote follows within 24 hours.
Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).