The job on one screen

The unit’s data sheet
The range as published on airgreen.ca: pick a size to see its capacity in deep cold.
| Size | Heating at −8 °C | Heating at −15 °C | Coldest certified point | COP at −15 °C | SEER | HSPF | Indicative LogisVert aid |
|---|---|---|---|---|---|---|---|
| Sharp ZU1 12 000 | 14,500 | 12,000 | −27 °C: 7,200 | 2.11 | 22.0 | 11.0 | $1,740 |
| Sharp ZU1 15 000 | 18,100 | 15,300 | −27 °C: 10,100 | 2.1 | 24.0 | 11.0 | $2,172 |
| Sharp ZU1 18 000 | 22,000 | 18,000 | −27 °C: 11,500 | 2.2 | 24.0 | 11.0 | $2,640 |
| Sharp ZU1 24 000 | 22,400 | 19,000 | −27 °C: 12,300 | 2.2 | 22.0 | 11.0 | $2,688 |
According to NEEP, it delivers 14,500 BTU/h at −8 °C (17 °F), more than at 8 °C (14,000 BTU/h). It heats as hard in moderate cold as in mild weather.
According to NEEP, its certified maximum capacity at −27 °C (−17 °F) is 7,200 BTU/h, 60% of its nominal 12,000 BTU size.
At 8 °C, its certified maximum capacity reaches 17,100 BTU/h, 42% more than its nominal 12,000 BTU size.
According to NEEP, it delivers 18,100 BTU/h at −8 °C (17 °F), more than at 8 °C (18,000 BTU/h). It heats as hard in moderate cold as in mild weather.
According to NEEP, its certified maximum capacity at −27 °C (−17 °F) is 10,100 BTU/h, 67% of its nominal 15,000 BTU size.
At 8 °C, its certified maximum capacity reaches 21,800 BTU/h, 45% more than its nominal 15,000 BTU size.
According to NEEP, it delivers 22,000 BTU/h at −8 °C (17 °F), more than at 8 °C (21,600 BTU/h). It heats as hard in moderate cold as in mild weather.
According to NEEP, its COP at −27 °C is 1.88: the highest of the ZU1 line, which ranges from 1.79 to 1.82 at that temperature.
According to NEEP, its certified maximum capacity at −27 °C (−17 °F) is 11,500 BTU/h, 64% of its nominal 18,000 BTU size.
At −27 °C, its certified minimum capacity is 3,200 BTU/h (5,500 at 8 °C). It slows down instead of cycling on and off.
According to NEEP, its certified heating capacity at −15 °C (5 °F) is 19,000 BTU/h, 79% of its nominal 24,000 BTU size. Its COP there is 2.20.
Data read live from the airgreen.ca page of each size (NEEP / AHRI certified performance). When the title names the installed size, it is highlighted; otherwise the whole range is shown. The aid shown is today’s, using Hydro-Québec’s rule ($120 per 1,000 BTU/h at −8 °C); amounts quoted in the article date from its publication. Only Hydro-Québec confirms the assistance granted.
The article, chapter by chapter
In the Plateau-Mont-Royal, every HVAC project has its own unique challenges: brick facades, narrow rear access, dense vegetation, stairs and ladders, close neighbors… and above all, a very clear need for reliable comfort, summer and winter, without compromising the building's aesthetics. At AirGreen , we recently installed two Sharp outdoor units (residential configuration, wall-mounted/mini-split heat pump type) on a typical building in the neighborhood: exposed brick, stacked windows, a lush backyard, and anchor points that required precise planning.
The project's objective: to offer independent comfort to two living spaces (often the scenario in the Plateau's plexes), with an energy-efficient , quiet and sustainable solution, while respecting the constraints of the building and the immediate environment.
The Plateau context: why the “simple” quickly becomes technical
On the surface, a wall-mounted heat pump seems like “just an outdoor unit and an indoor one.” In reality, in a neighborhood like the Plateau, several factors quickly transform the installation into a complex technical project:
-
Brick wall : anchors, loads, vibrations, sealing, sealing of penetrations.
-
Access at height : windows above, tight clearances, safe intervention with ladder.
-
Vegetation (trees, vines, shrubs): air circulation must be preserved, future maintenance must be anticipated.
-
Proximity to neighbors : importance of noise, orientation, and vibration management.
-
Aesthetics : visible installations must remain clean, straight, and consistent with the facade.
This is exactly what we see in the photo: two Sharp outdoor units placed on wall brackets , at a carefully considered height, with a deliberate site access (ladder) and a brick facade that requires real expertise.
Type of system installed: Sharp wall-mounted heat pumps (mini-split), in a dual configuration
This is clearly a residential wall-mounted heat pump installation (mini-split/wall unit) . The presence of two separate outdoor units on the same facade very often indicates a scenario like:
-
two separate accommodations / two separate comfort zones;
-
two floors (or two occupants) wanting an independent temperature;
-
or, an owner who wants a simple, robust and easy-to-maintain solution, without going through a single multi-zone system.
At AirGreen, this “dual single-zone” approach is sometimes preferable to a single multi-zone unit, depending on the objectives: redundancy, simplicity of diagnosis, independent management, and sometimes better adaptation to the building.
Selected model: Sharp ZU1 , a logical choice for Montreal
For this type of project, we are sticking with a model consistent with the Sharp range : the Sharp ZU1 . It is a wall-mounted heat pump designed for performance and modulation, an essential point in our Quebec conditions where needs vary constantly (cold mornings, milder afternoons, thaws, summer humidity, etc.).
Even when the client doesn't arrive with a list of "specifications", we structure the choice around concrete criteria:
-
temperature stability ( inverter modulation);
-
comfort in heating and air conditioning;
-
noise level controlled;
-
clean integration on the facade;
-
serviceability (access, clearances, maintenance).
Visible installation details: what has been done (and why it's important)
1) Wall brackets: height, clearance and durability
The units are mounted on metal wall brackets . In a neighborhood like the Plateau, this is an extremely logical choice:
-
The equipment is protected against stagnant water, dirt, and seasonal accumulations;
-
we keep the unit more accessible for visual inspection (without getting stuck in the vegetation);
-
We improve air circulation, which helps with performance;
-
We reduce the risks of damage related to the ground (ice, snow removal, impacts).
The other major advantage: in heating mode, the defrost cycles produce water. A unit that is too low can end up frozen solid. Height therefore becomes a crucial factor in reliability.
2) Brick facade: anchoring and vibration control
Installing on brick is never simply a matter of “drilling and screwing”. At AirGreen, we pay particular attention to:
-
the quality of the anchor points (loads + safety);
-
vibration management (avoiding transmitting noise to the wall and rooms);
-
sealing the penetrations (preventing infiltration, humidity and wall degradation);
-
alignment (clean, professional, lasting result).
On a visible facade, a poorly aligned support or an approximate anchoring can be seen… and felt (vibrations, noise, wear).
3) Clearances around the units: air circulation and future maintenance
Note that the two units are not directly attached to each other. This is crucial: each condenser needs sufficient airflow to dissipate heat (in air conditioning) or absorb energy (in heating). Providing adequate ventilation means:
-
improved energy efficiency;
-
a reduction of mechanical stress on the compressor;
-
less risk of overheating in the summer;
-
and simpler maintenance (cleaning, inspection, service).
4) Vegetated environment: avoid the trap of “it works today…”
The vegetation on the Plateau is beautiful, but it can become an HVAC challenge: leaves, branches, rapid growth, humidity, and reduced airflow. In this type of backyard, we always plan the installation to:
-
prevent the units from being “swallowed up” by the shrubs in 2-3 seasons;
-
maintain clear access for maintenance;
-
reduce the accumulation of debris in the exchanger;
-
to maintain good airflow in the long term.
An outdoor unit that doesn't breathe properly loses efficiency, becomes noisier, and ages faster.
5) Site access: the importance of method (and safety)
The visible scale is not a detail: it illustrates the reality on the ground. In the Plateau, access is often restricted, and a proper installation relies on:
-
a safe lifting/positioning method;
-
rigorous preparation of supports and drilling;
-
precise placement to avoid rework;
-
a clean construction site (debris, brick dust, surface protection).
That's where team experience makes all the difference.
What makes for real performance is commissioning, not just the brand.
A well-chosen Sharp ZU1 is excellent. But everyday performance depends mainly on what you can't see in the photo:
-
quality of vacuum sealing;
-
sealing of the fittings;
-
refrigerant lines (protection, radiation, fixing);
-
slope and drainage management (to avoid surprises in winter);
-
Functional testing and validation of modes.
At AirGreen, we treat each installation as a complete system. This is what transforms a "simply installed" heat pump into a reliable, stable, and comfortable one.
Expected result for the client: independent comfort and preserved facade
In a brick building in the Plateau, the customer generally wants three things:
-
Comfort : stable heat in winter, efficient air conditioning in summer.
-
Tranquility : controlled noise, limited vibrations.
-
Visual cleanliness : neat, logical installation, without “DIY” touches.
This Sharp dual installation meets these expectations precisely: two well-positioned outdoor units on wall brackets, clearances respected, and an approach designed to last in a demanding urban environment.
Why entrust this type of project to AirGreen?
Because setting up a house in the Plateau-Mont-Royal is not a “standard” construction project. You have to know how to deal with brick, height, access, vegetation, and the proximity of neighbors — without compromising on quality.
At AirGreen , we focus on:
-
a clean and safe installation;
-
technical choices adapted to Quebec;
-
a lasting result and easy to maintain;
-
an aesthetic finish, respectful of the facade.
The job tools
Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.
Baseboards and electric furnaces turn 1 kWh of electricity into 1 kWh of heat. A heat pump delivers more: that is its COP. At Hydro-Québec’s rate D (11.142¢/kWh above 40 kWh a day, since 1 April 2026):
Hydro-Québec: a heat pump can be up to three times more efficient than baseboards for heating in the colder months.
Estimate per kWh of heat, at the chosen temperature, using the certified COP from the product page. Taxes, access charge and backup heat not included.
Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.
How the job unfolds
The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.
We look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.
Model, capacity and price, in writing. We also check whether the model qualifies for assistance programs.
Floors and furniture protected, wall plate position marked level, wall opening located.
A single opening, with the slope the drain needs to flow outside.
Set on a stand raised above the snow, with the clearances the manufacturer requires.
Connected, insulated and protected. The opening is then sealed against water, cold air and insects.
A dedicated circuit and an accessible disconnect near the outdoor unit.
Leak test, vacuum, then start-up and a check of heating and cooling.
Remote, modes, filters: we show you the essentials before we leave.
- The on-site estimateWe look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.
- The quoteModel, capacity and price, in writing. We also check whether the model qualifies for assistance programs.
- Getting readyFloors and furniture protected, wall plate position marked level, wall opening located.
- The wall openingA single opening, with the slope the drain needs to flow outside.
- The outdoor unitSet on a stand raised above the snow, with the clearances the manufacturer requires.
- Lines, cable and drainConnected, insulated and protected. The opening is then sealed against water, cold air and insects.
- The electrical workA dedicated circuit and an accessible disconnect near the outdoor unit.
- Tests and start-upLeak test, vacuum, then start-up and a check of heating and cooling.
- The walkthroughRemote, modes, filters: we show you the essentials before we leave.
What we check on a job like this one
Each number is a point we check on site. Switch between summer and winter to watch air and heat move.
In summer, the outdoor unit rejects the house's heat outside.
Generic illustration of this type of installation, not a survey of this job site. Tap a number.
Mounted level on a wall plate, high enough for the air to reach the whole room, with enough space around it to slide the filters out easily.
The refrigerant lines, the communication cable and the drain go through the wall in a single opening, sealed against water, cold air and insects.
Two insulated copper pipes connect the two units. Outside, a line cover can protect them from sun, knocks and weather.
A shut-off switch near the outdoor unit isolates it safely for service. It must stay accessible at all times.
The compressor and the fan. In heating mode it captures heat from the outdoor air, even in winter, and moves it inside.
On the ground or on the wall, it keeps the unit above accumulated snow. The unit stays clear and defrost water can drain away.
The fan needs to blow freely. Storage, a fence or a wall too close, and efficiency drops while noise goes up.
Is your home ready?
Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.
Good habits, once the unit is in place
Six simple habits that keep the unit going. Your list stays on this device.
What to do, season by season
Three habits per season for this unit. They take a few minutes and prevent many calls.
- Clean the indoor unit's filters.
- Clear leaves and debris left on the outdoor unit by winter.
- Test cooling before the first hot days.
- Clean the filters more often when the unit runs a lot.
- Keep plants away from the outdoor unit.
- Check that no water drips from the indoor unit.
- Rake the leaves around the outdoor unit.
- Test heating before the first cold days.
- Book periodic maintenance before winter.
- Keep snow away from the stand and the front of the unit.
- Let the unit defrost: it is normal.
- Never hit the ice on the fins; call us if the unit stays iced up.
The right pages, at the right time
Four statements: true or false?
It all comes down to details you have just seen.
1. In heating mode, the outdoor unit can produce water.
During defrost cycles. That water must drain away without forming ice.
2. You pick the capacity with a simple square-footage rule.
Windows, insulation, orientation and how the room is used all count. Capacity is chosen on site.
3. A multi-zone connects several indoor heads to a single condenser.
One head per room, all on the same condenser. Each room keeps its own temperature.
4. The disconnect can sit behind the patio furniture.
It must stay accessible: it is what shuts the unit off for service.
0 / 4 right answers
What people ask us about this kind of work
Does a wall-mounted heat pump heat in winter?
Wall-mounted or multi-zone: how do I choose?
Where does the outdoor unit go?
Are there grants?
Do I need a permit?
How cold can it heat?
How much can I save?
How is the LogisVert assistance calculated?
Is it noisy?
The outdoor unit is covered in ice: is that normal?
Does AirGreen hold the required licences?
Is the estimate free?
No question matches. Write to us: we answer.
More jobs to see, near you
By town, by equipment or by region: browse more than 4,700 published projects.
Each dot: a town where AirGreen has published projects. The glowing dot: this job.
An on-site estimate, the right capacity, the right equipment.
The on-site estimate is free and the quote follows within 24 hours.
Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).