Business briefCommercial PTAC

How PTAC costs compare with other commercial HVAC systems: what heat costs, room by room

Reading8 min
Key sections—
EquipmentPTAC

A commercial project with AirGreen

  1. 1On-site assessmentAn AirGreen advisor visits your building.
  2. 2QuoteClear and detailed.
  3. 3Planning with youWe set the dates together.
  4. 4Work and follow-upRBQ 5645-9605-01 (15.8, 15.10, 16).
Comparison · Commercial HVAC systems · one 12,000 BTU/h room

The same heat, three prices: PTAC, wall heat pump or baseboards

In a hotel, a rental building or an office, each room has its own unit. What changes from one system to the next is how much electricity it takes to deliver the same heat, and that depends on how cold it is outside. The figures below come from the manufacturers' documents and the AHRI certificate; two units sold by AirGreen serve as examples.

Heat pump PTAC: COP 3.6 at 8.3 °CPTAC heat pump down to −3.9 °CWall heat pump: COP 2.16 at −15 °CBaseboards: 1 kWh for 1 kWh
Example · heat pump PTACAirGreen product card for the GE ZONELINE 12,000 BTU PTACGE ZONELINE

AZHS12DCXXA

R-454B · 230/208 V · GE sheet revised 2/24See the product page
Example · wall heat pumpAirGreen product card for the FUJITSU AIRSTAGE ORION XLTH 12,000 BTUFUJITSU AIRSTAGE ORION XLTH

12,000 BTU

ASUH12KZAS · AOUH12KZAH1 · AHRI 214888802See the product page
ReferenceElectric baseboards

1 kWh of electricity = 1 kWh of heat

All heat from resistance, at any temperature
Estimated running cost

What 100 kWh of heat costs in the room

Pick an outdoor temperature: each unit needs only "100 ÷ COP" kWh of electricity to deliver 100 kWh of heat. The COP comes from each manufacturer's document or the AHRI certificate, at the temperature shown; nothing is estimated between two temperatures.

Outdoor temperature
Wall heat pump, COP read
Price per kWh (Rate D, April 1, 2026, taxes included)

Dark square: 1 kWh of electricity. Coloured squares: the heat delivered in return, one square per 0.25 kWh. Bar: the electricity needed for 100 kWh of heat.

How this amount is calculated

Electricity = 100 kWh of heat ÷ COP. Cost = electricity × Hydro-Québec Rate D price in force on April 1, 2026 (7.065¢ up to 40 kWh a day, 11.142¢ above, 9.104¢ on average) × 1.14975 (GST and QST). Access charges are not counted. A business is often billed under another Hydro-Québec rate: the kWh column does not change, only the price does.

GE PTAC: COP 3.6 at 8.3 °C (47 °F) per the GE sheet, AHRI 310/380 test. Below −3.9 °C (25 °F), the sheet says the heat pump stops; heat then comes from the electric element, whose power and heat output the sheet publishes: 4,800 W for 16,300 BTU/h, i.e. 16,300 ÷ (4,800 × 3.412) = 0.995, rounded to 1.0. Wall heat pump: AHRI-certified COPs published by NEEP (record 392122), at rated or maximum capacity as you choose; at −26.1 °C, only the COP at maximum capacity is published.

AirGreen method v1.1 (prices), November 18, 2026. An estimate is for comparing units under the same conditions. The real bill depends on the building, insulation, settings and use; this amount is not a promise.

Extreme cold

The handover: where the PTAC hands over to its heater

A heat pump PTAC carries two heat sources in one box. GE publishes its heat pump's limit at −3.9 °C; colder than that, the electric element chosen at order time does the heating. The wall heat pump publishes its certified maximum capacity down to −26.1 °C. Pick the PTAC element to see its heat on the same scale.

PTAC electric element (230 V)
GE: heat pump (GE sheet) then electric elementFUJITSU AIRSTAGE: certified max capacity (NEEP)Beyond the last published point

Read before concluding. Between 8.3 and −3.9 °C, GE confirms the PTAC heat pump runs but publishes its capacity only at 8.3 °C: the blue hatched band shows this without inventing a number. Below −26.1 °C, FUJITSU AIRSTAGE states there is no automatic lockout (brochure FG8153C) without stating a capacity. The two limits are not measured the same way; the chart puts them side by side, without ranking.
Other commercial systems

Purchase price, upkeep, service life: what this page does not put a number on, and why

You often read that a PTAC costs less to buy and maintain than a central system, a VRF or a wall heat pump. No document we consulted shows this, and a project's price depends on the building. Here instead is what weighs on the bill for each type, to check in your quote.

PTAC

One unit per room, in the wall

A sleeve goes through the outside wall: GE requires an opening of at least 16 1/4 × 42 1/4 in. Each unit has its own circuit: 15, 20 or 30 A depending on the element chosen (GE sheet). Heating in extreme cold goes through that element.

Wall heat pump

An indoor head, an outdoor unit

A refrigerant line connects the head to the outdoor unit; some outdoor units serve several rooms (multi-zone). Performance is certified per combination, on the AHRI certificate.

Central

One unit, a duct network

Heat travels through ducts to each room. The cost depends mostly on the network to build or reuse, which no unit sheet puts a number on.

VRF

A refrigerant network, many units

One or more outdoor units feed many indoor units. Piping and connected-capacity limits come from each manufacturer's design manual; the project is calculated case by case.

Purchase and installation price

On each product page and in the written quote that follows the assessment visit.

Electricity

The "What 100 kWh of heat costs" block above: it is the only part of the cost the documents let us compare figure by figure.

Upkeep

Each unit's manual describes the expected upkeep (filters, cleaning). No document we consulted publishes an upkeep cost comparable from one system to the next.

Service life

None of the documents we consulted publishes one. So this page does not state one.

Spec sheet

The two examples, line by line

MeasureGE ZONELINE AZHS12FUJITSU AIRSTAGE ORION XLTH 12,000
Heating at 8.3 °C (47 °F)
Heating capacity at 8.3 °C10,600 BTU/h at 230 V10,500 at 208 V · GE sheet, AHRI 310/38016,000 BTU/h ratedrange 3,500 to 23,600 · NEEP 392122
COP at 8.3 °C3.6 at 230 and 208 V4.64 rated · 3.07 at max. capacity
In extreme cold
Heat pump lockoutHeat pump down to −3.9 °C (25 °F), then electric elementNo automatic lockout stated below −26 °C (brochure FG8153C)
Electric element power and breaker2.4 · 3.4 · 4.8 kW at 230 V8,100 · 11,600 · 16,300 BTU/h; breaker 15 · 20 · 30 ANo backup element described in the documents consulted
Heating capacity at −15 °CThat of the chosen element: 8,100 to 16,300 BTU/h16,600 BTU/h max. · COP 2.16NEEP 392122
Cooling — different test methods, not highlighted
EER2 or EER at 35 °CEER 11.6 at 230 VAHRI 310/380 · 11.8 at 208 VEER2 16.0NEEP 392122 · SEER2 30.5
Rated capacity at 35 °C12,000 BTU/h at 230 V12,000 BTU/h
Installation and listings
Clearance: wall opening16 1/4 × 42 1/4 in minimumRAB42MG sleeve 42 × 16 × 13 3/4 inPassage for the refrigerant line to the outdoor unit
RefrigerantGWP per IPCC (AR4); ASHRAE 34 classR-454B · GWP 466 · A2LR-32 · GWP 675 · A2L
AHRI certificate · NEEP recordNot stated on the GE sheet; PTACs are not in the NEEP list214888802 · 392122
ENERGY STAR · cold climateNot stated on the GE sheetYes · yes (NEEP)

No value is highlighted: the two units are tested under different standards (AHRI 310/380 for the PTAC, AHRI 210/240 for the wall heat pump). The GE sheet carries the note "projected specifications, subject to change".

FAQ

Questions about the cost of a PTAC

Why doesn't this page give the price of a PTAC or a VRF?

A project's price depends on the building: number of rooms, walls, electrical circuits, existing network. Unit prices are on their product pages and the project price is in the written quote. This page compares what the documents let us compare: the electricity needed for the same heat.

What is a COP?

The coefficient of performance: heat delivered divided by electricity used, under specific test conditions. A COP of 3.6 means 3.6 kWh of heat for 1 kWh of electricity at that temperature. An electric resistance, like a baseboard, has a COP of 1.

Does a PTAC heat in extreme cold?

Yes, through its electric element. The GE sheet says the heat pump runs down to −3.9 °C (25 °F); colder than that, the element chosen at order time (2.4, 3.4 or 4.8 kW at 230 V) produces 8,100, 11,600 or 16,300 BTU/h, at a COP of about 1.

Can the PTAC and wall heat pump COPs be compared directly?

Not quite. The PTAC is tested under AHRI 310/380 and the wall heat pump under AHRI 210/240, published by NEEP. Both give a COP at 8.3 °C, but the test setups differ. This page puts them side by side without highlighting either.

Does my business pay Rate D?

Hydro-Québec Rate D is for residential use; an apartment in a rental building is often billed under it. A business or a hotel is generally billed under a business rate. The number of kWh shown does not change: multiply it by the price on your bill.

Why a wall heat pump as an example?

Because it also serves one room at a time, like a PTAC, and it has an AHRI certificate published by NEEP at several temperatures. The FUJITSU AIRSTAGE ORION XLTH 12,000 BTU is sold by AirGreen; it is an example, not a recommendation.

Rooms to heat and cool, one at a time?

PTAC, wall heat pumps or another system: AirGreen offers both types shown here. The quote follows the assessment visit.

Sources

Documents consulted

GE, AZHS12DCXXA sheet"Specification Revised 2/24", projected specifications. Consulted November 18, 2026.
NEEP, record 392122FUJITSU AIRSTAGE ASUH12KZAS / AOUH12KZAH1, AHRI 214888802. Consulted November 18, 2026.
FUJITSU AIRSTAGE, brochure FG8153CRevision 4/2025: range down to −26 °C, no automatic lockout stated below.
Hydro-Québec, Electricity RatesIn force April 1, 2026, Rate D, sec. 2.5.
ECCC, Canadian Climate Normals 1991–2020Montréal–Trudeau: January mean −9.2 °C; mean daily minimum −13.5 °C.
NRCan, HOT2000 weather mapMontréal Intl: design temperature −23.1 °C.
You made it to the end.Share it with someone it could help.
Keep reading

In the same blog

AirGreen Climatisation & Chauffage

From reading to your building.

An AirGreen advisor assesses your building on site and gives you a detailed quote.

Commercial requests: sales@airgreen.ca
  • RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16
  • $5M liability insuranceOn every job
  • 15+ yearsFamily-owned, based in Montréal