To be confirmed Permits and bylaws · Checked on September 30, 2026

Heat pumps in Bois-des-Filion: permits and bylaws

Planning a heat pump or an air conditioner in Bois-des-Filion? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedNot specified in the permits bylaw: confirm with the land-use planning department
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines1.5 mAt least 1.5 m from the lot lines
Noise limitNot specified“Bruits et nuisances” page: no dBA figure; quiet hours from 9 p.m. to 7 a.m. on weekdays
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 1.5 m from the lot lines.

Side yardWith conditions

At least 1.5 m from the lot lines, hidden from the street by opaque landscaping.

Front yardNot allowed

Not allowed in the front yard or the secondary front yard.

BalconyNot specified

Not specified in the bylaw: confirm with the land-use planning department.

Flat roofNot specified

Not specified for a house: confirm with the land-use planning department.

02 · Before the work

Good to know, and who to call.

Good to know

  • A compressor or other mechanical equipment may not be mounted on the main façade of the building.
  • Corner lot: also not allowed in the secondary front yard.
Who to call Land-use planning department (Service de l’aménagement du territoire, by appointment), city hall: 450 621-1460 Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Bois-des-Filion?

Not specified in the permits bylaw: confirm with the land-use planning department.

How far from the lot lines must the unit be?

At least 1.5 m from the lot lines.

Can a heat pump go in the front yard?

No. Not allowed in the front yard or the secondary front yard.

What is the noise limit?

“Bruits et nuisances” page: no dBA figure; quiet hours from 9 p.m. to 7 a.m. on weekdays.

Who should I call to confirm before the work?

Land-use planning department (Service de l’aménagement du territoire, by appointment), city hall: 450 621-1460.

04 · Sources

Read at the source.

Sources: Zoning bylaw 7200, s. 4.2.1 (table) and section 4.2 “Équipements de type climatisation, thermopompe, ventilation et autres équipements similaires”; chapter 3 “Équipements mécaniques en façade”; permits and certificates bylaw 7100, s. 5.1.1; villebdf.ca, “Bruits et nuisances” and “Permis” pages (bylaw 7200 in force March 17, 2018 (base text; amendment 7213 of November 29, 2023 checked); checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Bois-des-Filion?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours