Permit required Permits and bylaws · Checked on September 30, 2026

Heat pumps in Charlemagne: permits and bylaws

Planning a heat pump or an air conditioner in Charlemagne? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredCertificate of authorization required before installation
Fee$50Fee published by the city.
Distance from lot lines2 m2 m from the lot lines
Noise limitNot specifiedNuisance bylaw: no figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 2 m from the lot lines.

Side yardAllowed

At least 2 m from the lot lines.

Front yardNot allowed

Not allowed in the front yard. Secondary front yard (corner lot): allowed at 2 m, hidden from the street.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • Include a plan showing the unit’s location and the lot lines.
  • Seasonal units are not covered.
  • Usual processing time: 4 to 6 weeks.
Who to call Urban planning department, 450 581-2541, ext. 25 Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Charlemagne?

Certificate of authorization required before installation. Published fee: $50.

How far from the lot lines must the unit be?

2 m from the lot lines.

Can a heat pump go in the front yard?

No. Not allowed in the front yard. Secondary front yard (corner lot): allowed at 2 m, hidden from the street.

What is the noise limit?

Nuisance bylaw: no figure for heat pumps.

Who should I call to confirm before the work?

Urban planning department, 450 581-2541, ext. 25.

04 · Sources

Read at the source.

Sources: Zoning bylaw 05-384-15, s. 90 (amended by 11-384-18-08); permits and certificates bylaw 05-391-15, s. 34; fee bylaw 12-382-25, schedule C; nuisance bylaw 02-331-05, s. 2.1 (zoning 05-384-15 consolidated (latest amendment 05-384-26-27); 2026 fees; checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Charlemagne?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours