Heat pumps in Dollard-des-Ormeaux: permits and bylaws

Planning a heat pump or an air conditioner in Dollard-des-Ormeaux? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedBylaw R-2026-217 does not name heat pumps among the work that needs a permit or certificate: confirm with urban planning
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines0.3 mAt least 0.3 m from the lot lines for a unit detached from the building
Noise limit55 / 50 dBA55 dBA from 7 a.m. to 10 p.m. and 50 dBA from 10 p.m. to 7 a.m.
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 0.3 m from the lot lines.

Side yardAllowed

At least 0.3 m from the lot lines.

Front yardNot allowed

Not allowed in the front yard. Allowed in the secondary front yard of a corner lot.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofAllowed

Allowed on a flat roof.

02 · Before the work

Good to know, and who to call.

Good to know

  • The noise limit also covers heating, ventilation and pool equipment.
  • The bylaw does not say where the noise is measured.
  • New zoning bylaw R-2025-199 (replaces bylaw 82-704).
Who to call Urban Planning and Engineering Department, 514 684-1010, ville@ddo.qc.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Dollard-des-Ormeaux?

Bylaw R-2026-217 does not name heat pumps among the work that needs a permit or certificate: confirm with urban planning.

How far from the lot lines must the unit be?

At least 0.3 m from the lot lines for a unit detached from the building.

Can a heat pump go in the front yard?

No. Not allowed in the front yard. Allowed in the secondary front yard of a corner lot.

What is the noise limit?

55 dBA from 7 a.m. to 10 p.m. and 50 dBA from 10 p.m. to 7 a.m.

Who should I call to confirm before the work?

Urban Planning and Engineering Department, 514 684-1010, ville@ddo.qc.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw R-2025-199, s. 114 (row 20), 115 and 125; nuisance bylaw 2014-094, s. 9(5); permits and certificates bylaw R-2026-217, s. 40 and 53 (consolidated August 7, 2026 (R-2025-199); consolidated February 14, 2023 (2014-094)).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Dollard-des-Ormeaux?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours