Depends Permits and bylaws · Checked on September 30, 2026

Heat pumps in L’Épiphanie: permits and bylaws

Planning a heat pump or an air conditioner in L’Épiphanie? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitDependsNo permit in general; PIIA approval required in designated sectors
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines2 mAt least 2 m from the lot lines
Noise limitNot specifiedNuisance bylaw 085/HAR-001: no figure for heat pumps; zoning bylaw U-005 in force is not published: confirm with urban planning
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 2 m from the lot lines.

Side yardAllowed

At least 2 m from the lot lines.

Front yardNot allowed

Not allowed in the front yard or the secondary front yard. Window A/C on the façade: April 15 to October 15 only.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • PIIA sector: any accessory equipment must be approved by council (PIIA application, fees, planning advisory committee review).
  • There must be a main building on the lot to install the unit.
Who to call Urban planning department, 450 588-5515, urbanisme@lepiphanie.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in L’Épiphanie?

No permit in general; PIIA approval required in designated sectors.

How far from the lot lines must the unit be?

At least 2 m from the lot lines.

Can a heat pump go in the front yard?

No. Not allowed in the front yard or the secondary front yard. Window A/C on the façade: April 15 to October 15 only.

What is the noise limit?

Nuisance bylaw 085/HAR-001: no figure for heat pumps; zoning bylaw U-005 in force is not published: confirm with urban planning.

Who should I call to confirm before the work?

Urban planning department, 450 588-5515, urbanisme@lepiphanie.ca.

04 · Sources

Read at the source.

Sources: Fact sheet “Équipements complémentaires liés à l’usage résidentiel” (2026); draft zoning bylaw U-005 (2024), s. 212 and 224 (adopted text not published); nuisance bylaw 085/HAR-001, s. 5 (2026 fact sheet; zoning U-005 in force June 25, 2025; checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in L’Épiphanie?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours