Depends Permits and bylaws · Checked on September 30, 2026

Heat pumps in Les Cèdres: permits and bylaws

Planning a heat pump or an air conditioner in Les Cèdres? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitDependsDeclaration of work required; permit or certificate in a PIIA sector or a constraint zone
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines3 mAt least 3 m from the lot lines
Noise limit55 / 50 dBOver 55 dB from 7 a.m. to 9 p.m. or 50 dB from 9 p.m. to 7 a.m. at the lot lines: not allowed (any noise)
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 3 m from the lot lines.

Side yardWith conditions

At least 3 m from the lot lines. In the side setback: hidden from the street by landscaping.

Front yardNot allowed

Not allowed in the front yard. Corner lot: allowed in the secondary front yard, 3 m from the lot lines, with a 1.82 m fence or hedge.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofWith conditions

Flat roof only: no more than 25% of the roof area, no more than 3 m above the maximum height.

02 · Before the work

Good to know, and who to call.

Good to know

  • The unit must sit on a surface built for the purpose.
  • Pool heat pump: at least 1.5 m from the property lines.
  • PIIA sector or constraint zone: permit or certificate instead of the declaration.
Who to call Urban planning department, 450 452-4651, ext. 225, urbanisme@ville.lescedres.qc.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Les Cèdres?

Declaration of work required; permit or certificate in a PIIA sector or a constraint zone.

How far from the lot lines must the unit be?

At least 3 m from the lot lines.

Can a heat pump go in the front yard?

No. Not allowed in the front yard. Corner lot: allowed in the secondary front yard, 3 m from the lot lines, with a 1.82 m fence or hedge.

What is the noise limit?

Over 55 dB from 7 a.m. to 9 p.m. or 50 dB from 9 p.m. to 7 a.m. at the lot lines: not allowed (any noise).

Who should I call to confirm before the work?

Urban planning department, 450 452-4651, ext. 225, urbanisme@ville.lescedres.qc.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 395-2016, s. 3.8 and 4.3.2.2 (row 19); fact sheet “Travaux nécessitant un permis ou un certificat d’autorisation”; bylaw 349-2012, s. 7.1 (395-2016: consolidated up to bylaw 395-23-2024 (March 13, 2025); 349-2012: consolidated January 5, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Les Cèdres?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours