To be confirmed Permits and bylaws · Checked on September 30, 2026

Heat pumps in Les Coteaux: permits and bylaws

Planning a heat pump or an air conditioner in Les Coteaux? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedThe permits bylaw does not name heat pumps: confirm with urban planning
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines1.5 m (2 m at the front)At least 1.5 m from the side and rear lot lines and 2 m from the front lot line
Noise limitNot specifiedNuisance bylaw: no figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardWith conditions

At least 1.5 m from the lot lines. On the ground: hidden from the street by a fence, a decorative panel or an architectural element.

Side yardWith conditions

At least 1.5 m from the lot lines. On the ground: hidden from the street by a fence, a decorative panel or an architectural element.

Front yardNot specified

The front-yard X points to notes (3) and (4), which cover multi-family buildings: for a house, confirm with urban planning.

BalconyWith conditions

Multi-family or group housing: allowed on a balcony; on the front side, hidden by the railing.

Flat roofNot specified

The bylaw allows roof units for commercial, industrial and public uses only: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • Pool heat pump: at least 1.5 m from the property lines.
  • Multi-family building: window A/C allowed in the front yard.
Who to call Urban planning department, 450 267-3531, ext. 239, techurbain@les-coteaux.qc.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Les Coteaux?

The permits bylaw does not name heat pumps: confirm with urban planning.

How far from the lot lines must the unit be?

At least 1.5 m from the side and rear lot lines and 2 m from the front lot line.

Can a heat pump go in the front yard?

The front-yard X points to notes (3) and (4), which cover multi-family buildings: for a house, confirm with urban planning.

What is the noise limit?

Nuisance bylaw: no figure for heat pumps.

Who should I call to confirm before the work?

Urban planning department, 450 267-3531, ext. 239, techurbain@les-coteaux.qc.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 317, s. 6.1 (row 46, notes 3 and 4), 15.1.7 and 15.2.1; permits and certificates bylaw 316, s. 4.1 and 5.1; nuisance bylaw 334 (RMH 450), s. 15 (consolidated June 11, 2026 (317, with 317-01); consolidated May 27, 2026 (316)).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Les Coteaux?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours