To be confirmed Permits and bylaws · Checked on September 30, 2026

Heat pumps in Massueville: permits and bylaws

Planning a heat pump or an air conditioner in Massueville? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedNot specified in the bylaw: confirm with urban planning
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines3 mRear yard only, at least 3 m from the lot lines
Noise limitNot specifiedPublic safety bylaw: no figure for heat pumps (bans noise that disturbs the neighbours)
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 3 m from the lot lines.

Side yardNot allowed

Not allowed in the side yards.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • The bylaw names “compressors for heating and air conditioning”: allowed in the rear yard only.
  • A renovation or repair permit is required to renovate or repair a building; heat pumps are not named.
  • Building inspector: Tuesdays, by appointment.
Who to call Urban planning department, 450 788-2957, urbanisme@massueville.net Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Massueville?

Not specified in the bylaw: confirm with urban planning.

How far from the lot lines must the unit be?

Rear yard only, at least 3 m from the lot lines.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Public safety bylaw: no figure for heat pumps (bans noise that disturbs the neighbours).

Who should I call to confirm before the work?

Urban planning department, 450 788-2957, urbanisme@massueville.net.

04 · Sources

Read at the source.

Sources: Zoning bylaw 293-91, s. 3.5.1 to 3.5.3; permits and certificates bylaw 397-07, s. 4.1 and 5.1; bylaw RM-2017, s. 6.1.5 (zoning consolidated May 2010; permits bylaw consolidated September 21, 2021).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating