Permit required Permits and bylaws · Checked on September 30, 2026

Heat pumps in Notre-Dame-de-Stanbridge: permits and bylaws

Planning a heat pump or an air conditioner in Notre-Dame-de-Stanbridge? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredBuilding permit required: the zoning bylaw classes a heat pump as an accessory construction
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines2 m2 m from the side and rear lot lines
Noise limit55 dBAMore than 55 dBA at the property lines (24-hour equivalent level, Leq 24): not allowed
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

Allowed in the rear yard, at least 2 m from the side and rear lot lines.

Side yardWith conditions

Allowed in the side yards, at least 2 m from the lot lines. In the side setback, hidden from the street by landscaping.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofWith conditions

Allowed on a roof slope other than the one facing the street.

02 · Before the work

Good to know, and who to call.

Good to know

  • There must be a main building on the lot.
  • A heat pump does not count toward the maximum of three accessory constructions per lot.
Who to call Municipal office, 450 296-4710, ressources@notredamedestanbridge.qc.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Notre-Dame-de-Stanbridge?

Building permit required: the zoning bylaw classes a heat pump as an accessory construction.

How far from the lot lines must the unit be?

2 m from the side and rear lot lines.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

More than 55 dBA at the property lines (24-hour equivalent level, Leq 24): not allowed.

Who should I call to confirm before the work?

Municipal office, 450 296-4710, ressources@notredamedestanbridge.qc.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 315-08, s. 59, 60, 61 and 70; permits and certificates bylaw 318-08, s. 18 (administrative consolidation including bylaw 415-17 (in force January 11, 2018)).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Notre-Dame-de-Stanbridge?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours