Heat pumps in Oka: permits and bylaws
Planning a heat pump or an air conditioner in Oka? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

Five spots, one answer for each.
Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.
2 m from the side and rear lot lines.
2 m from the side and rear lot lines.
Not allowed in the front setback or front yard.
Not specified in the bylaw: confirm with urban planning.
Not specified in the bylaw: confirm with urban planning.
Good to know, and who to call.
Good to know
- Lot subject to the PIIA bylaw (2011-98) or in the heritage site (bylaw 2001-19): permit or certificate required.
- Water-source unit: closed loop if connected to the water main, a well, a lake or a stream.
- A new zoning bylaw (2025-289) is being adopted (referendum register in September 2026): these rules may change.
The short answers.
Do you need a permit to install a heat pump in Oka?
No permit, except in a PIIA (architectural review) area or the heritage site.
How far from the lot lines must the unit be?
2 m from the side and rear lot lines.
Can a heat pump go in the front yard?
No. Not allowed in the front setback or front yard.
What is the noise limit?
Nuisance bylaw 2023-268: no decibel figure for heat pumps.
Who should I call to confirm before the work?
Urban planning, environment and economic development department, 450 479-8333.
Read at the source.
Sources: Zoning bylaw 2016-149, s. 5.3.1, 5.3.1.1 and 6.2.1 (row 24); permits and certificates bylaw 2013-111, s. 4.3 and 4.4; nuisance bylaw 2023-268 (consolidated April 12, 2023 (zoning)).
Checked by AirGreen on September 30, 2026.
This page is a summary. The official bylaw prevails. Confirm with the city before the work.