We are AirGreen, your trusted partner for all your heating, ventilation, and air conditioning (HVAC) needs. We understand that each municipality has its own rules and regulations, and we are here to guide you through those specific to Pointe-Claire regarding the installation of heat pumps and air conditioning units.
Installation Rules:
-
Maximum Height of Units:
- 1.5 meters (4.92 feet) if located in the front or secondary front setback.
- 2 meters (6.6 feet) in a side or rear setback.
-
Minimum Distance:
- Units must be installed at least 4.57 meters (15 feet) from any street boundary. No minimum distance is required for side or rear setbacks.
-
Visibility:
- If visible from a street, units must be concealed by an opaque screen (wood or PVC) or a hedge, in accordance with the maximum heights mentioned.
Authorization Certificate:
To install a heat pump, an external air conditioning unit, or any other outdoor mechanical equipment in Pointe-Claire, an authorization certificate is mandatory.
How to Obtain It?
-
Submission of the Application:
- Email all necessary forms and documents to urbanisme@pointe-claire.ca.
- Forms are available at www.pointe-claire.ca (Permits section).
-
Required Documents:
- Written authorization from the property owner if the application is submitted by a third party.
- Location certificate.
- Product brochure with technical specifications, brand, dimensions, and noise level.
- Plans showing the equipment location and distances from property boundaries, as well as the description and plans of the screening.
-
Fees:
- Residential (1 to 4 units): $35 for mechanical equipment; $40 for propane tanks.
- Commercial, industrial, or multifamily: Variable rates.
- Fees are non-refundable and payable to the Ville de Pointe-Claire.
Deadlines and Conditions:
- Approval: The Urban Planning Department will approve the project within 30 days if the file is complete.
- Validity: The authorization certificate is invalid if work does not begin within six months or is not completed within one year of issuance.
Your Responsibility:
It is crucial to understand that complying with the rules and obtaining the necessary permits is your responsibility. While we at AirGreen are always available to help and guide you through this process, you must ensure your installation complies. This also includes obtaining your neighbors' consent when necessary.
We Are Here for You!
At AirGreen, we are committed to providing you with exceptional service while respecting local regulations. For any questions or assistance, do not hesitate to contact us. We are here to make your project a success, fully compliant and stress-free!
Looking forward to serving all your HVAC needs in Pointe-Claire,
The AirGreen Team