Pointe-Claire: Permits and Regulations | Heat pump or air conditioning unit

Pointe-Claire: Permits and Regulations | Heat pump or air conditioning unit

City of Pointe-Claire : Get a permit to install a heat pump or air conditioning unit

Dear residents of the City of Pointe-Claire,

We are AirGreen, your trusted partner for all your heating, ventilation, and air conditioning (HVAC) needs. We understand that each municipality has its own rules and regulations, and we are here to guide you through those specific to Pointe-Claire regarding the installation of heat pumps and air conditioning units.

Installation Rules:

  • Maximum Height of Devices:

    • 1.5 meters (4.92 feet) if located in the front or secondary front margin.
    • 2 meters (6.6 feet) in a side or rear margin.
  • Minimum Distance:

    • Devices must be installed at least 4.57 meters (15 feet) from any street limit. No minimum distance is required for side or rear margins.
  • Visibility:

    • If visible from a street, devices must be concealed by an opaque screen (wood or PVC) or a hedge, in accordance with the maximum heights mentioned.

Authorization Certificate:

To install a heat pump, an external air conditioning unit, or any other outdoor mechanical equipment in Pointe-Claire, an authorization certificate is mandatory.

How to Obtain It?

  1. Submission of the Application:

  2. Required Documents:

    • Written authorization from the owner if the application is made by a third party.
    • Location certificate.
    • Product brochure with technical specifications, brand, dimensions, and sound intensity.
    • Plans showing the location of the equipment and distances from property limits, as well as the description and plans of the camouflage screen.
  3. Fees:

    • Residential (1 to 4 dwellings): $35 for mechanical equipment; $40 for propane tank.
    • Commercial, industrial, or multifamily: Variable rates.
    • Fees are non-refundable and payable to the City of Pointe-Claire.

Deadlines and Conditions:

  • Approval: The Urban Planning Service will approve the project within 30 days if the file is complete.
  • Validity: The authorization certificate is invalid if work does not begin within six months or is not completed within a year of its issuance.

Your Responsibility:

It is crucial to understand that compliance with rules and obtaining the necessary permits are your responsibility. Although we at AirGreen are always available to assist and guide you through this process, you must ensure your installation complies. This also includes obtaining agreement from your neighbors when necessary.

We Are Here for You!

At AirGreen, we are committed to providing you with exceptional service while respecting local regulations. For any questions or assistance, do not hesitate to contact us. We are here to make your project a success, in full compliance and without stress!

Looking forward to serving all your HVAC needs in Pointe-Claire,

The AirGreen Team

Caution

This section has been prepared solely for the convenience of the reader and has no official or legal value. No warranty is offered as to the accuracy of the text. For all legal purposes, the reader should consult the official version of the by-law and each of its amendments or obtain a copy by contacting the City's clerk office.