Heat pumps in Rosemère: permits and bylaws
Planning a heat pump or an air conditioner in Rosemère? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

Five spots, one answer for each.
Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.
At least 6 m from the rear lot line and 3 m from the side lot lines.
At least 3 m from the side lot lines (2 m for row houses) and 6 m from the rear line, hidden from the street by an opaque fence.
At least 6 m from the front lot line, hidden from the street by an opaque fence. Also allowed in a secondary front yard, hidden from the street.
Not specified in the bylaw: confirm with urban planning.
Not specified for a house: confirm with urban planning.
Good to know, and who to call.
Good to know
- If the distances cannot be met: a sound wall on the property, shown on a plan filed with the permit application.
- Bylaw 801-72 is being adopted (second draft adopted August 17, 2026): the heat-pump standards will change, check the version in force.
The short answers.
Do you need a permit to install a heat pump in Rosemère?
Permit required before installation.
How far from the lot lines must the unit be?
3 m from the side lot lines (2 m for a row or attached house), 6 m from the rear line and 6 m from a front line facing a street.
Can a heat pump go in the front yard?
Yes, with conditions. At least 6 m from the front lot line, hidden from the street by an opaque fence. Also allowed in a secondary front yard, hidden from the street.
What is the noise limit?
No figure found for heat pumps; a sound wall is required if the minimum distances are not met.
Who should I call to confirm before the work?
Urban planning department, urbanisme@ville.rosemere.qc.ca (city hall: 450 621-3500).
Read at the source.
Sources: Zoning bylaw 801 (06-2026 update), s. 79 (table, row 20) and 91; permits and certificates bylaw 1006, s. 31 (13); ville.rosemere.qc.ca, “Demandes de permis et certificats” (zoning 801: June 2026 update; bylaw 1006: version including 1006-01 (June 19, 2026); checked September 30, 2026).
Checked by AirGreen on September 30, 2026.
This page is a summary. The official bylaw prevails. Confirm with the city before the work.
A heat pump project in Rosemère?
We come and see your property, and the estimate is free.
