Rosemère : Permits and Regulations | Heat pump or air conditioning unit

Rosemère: Permits and Regulations | Heat Pump or Air Conditioning Unit

Ville de Rosemère: Obtaining a permit to install a heat pump or air conditioning unit

Dear residents of Ville de Rosemère,

We are AirGreen, your trusted partner for HVAC solutions in the region. We understand that each municipality has its own rules and regulations regarding the installation of air conditioning units and heat pumps. Here is a detailed guide to the rules in effect in Rosemère to help you navigate this process.

Air Conditioning Units and Heat Pumps in Rosemère:

  • Authorized Locations: Units may be installed in secondary front yards, side yards, and back yards.
  • Noise Level: The noise emitted by the equipment must not exceed 50 dB(A) at your property line.

General Information:

  • Use: These units are authorized as accessories for all types of dwellings in the "Habitation (H)" group.

Placement:

  • Setback Requirements:
    • Rear: Minimum of 6 meters.
    • Side: Minimum of 3 meters (2 meters for row or adjoining houses).
    • Secondary Front: Maintain 3 meters from the property line and 6 meters from the rear line.
  • Protective Screen: Installed units must be concealed by a screen (opaque fence, dense hedge, etc.) so they are not visible from the street.

Building Permit:

  • Required For: Construction, alteration, repair, expansion, or addition of buildings.
  • Cost: For residential renovations, the fee is $4.50 per $1,000 of work cost, with a minimum charge of $50.

Client Responsibilities:

  • Compliance: It is your responsibility to ensure the installation complies with all rules and regulations.
  • Permit: You must obtain the necessary permits before starting work.
  • Neighbor Agreement: In some cases, your neighbors' consent may be required.

How We Can Help:

  • Guidance: AirGreen is here to guide you through these requirements and help you understand your responsibilities.
  • Support: While obtaining permits is your responsibility, we are available to provide any necessary assistance.

Conclusion:

Before starting any project, make sure you understand and comply with the rules and regulations of Ville de Rosemère. At AirGreen, we are committed to providing quality service while respecting local standards. For any questions or clarifications, please do not hesitate to contact us.

We look forward to serving you soon,

The AirGreen Team

Caution

This section has been prepared solely for the convenience of the reader and has no official or legal value. No guarantee is offered as to the accuracy of the text. For all legal purposes, the reader should consult the official version of the by-law and each of its amendments or obtain a copy certified by the city clerk.

---UPDATED: October 15, 2025---