To be confirmed Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Bernard-de-Michaudville: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Bernard-de-Michaudville? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedTo be confirmed: the permits bylaw does not name heat pumps
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines3 m3 m from all property lines
Noise limitNot specifiedNuisance bylaw 2024-06: no figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 3 m from all lot lines.

Side yardWith conditions

Ground-mounted unit, at least 3 m from the lot lines. Not allowed in the village core.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • Village core: heat pumps allowed in the rear yard only.
  • The municipality asks that permit applications be filed at least one month before the work.
Who to call Building inspector, 450 792-3190, ext. 1, urbanisme@saintbernarddemichaudville.qc.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Bernard-de-Michaudville?

To be confirmed: the permits bylaw does not name heat pumps.

How far from the lot lines must the unit be?

3 m from all property lines.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Nuisance bylaw 2024-06: no figure for heat pumps.

Who should I call to confirm before the work?

Building inspector, 450 792-3190, ext. 1, urbanisme@saintbernarddemichaudville.qc.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 2017-02, s. 4.5.1 to 4.5.3, 7.9 and 14.2; permits and certificates bylaw 2017-05, s. 2.9 and 3.1; nuisance bylaw 2024-06 (administrative consolidation of May 2024).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Bernard-de-Michaudville?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours