Permit required Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Chrysostome: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Chrysostome? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredCertificate of authorization required before installation
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines1.5 mAt least 1.5 m from the side and rear lot lines, no more than 2 m from the house wall
Noise limit50 dB50 dB maximum at the lot lines
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardWith conditions

1.5 m from the lot lines, no more than 2 m from the house wall.

Side yardWith conditions

1.5 m from the lot lines, no more than 2 m from the house. In the side setback, hidden from the street by landscaping.

Front yardNot allowed

Not allowed in the front yard or the secondary front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofWith conditions

On a roof slope other than the one facing the street.

02 · Before the work

Good to know, and who to call.

Good to know

  • The unit must be no more than 2 m from the house wall.
  • Pool heat pump: more than 1 m from the pool and more than 1.5 m from any lot line.
Who to call Municipal inspector, 450 826-3911, ext. 111, urbanisme@mun-sc.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Chrysostome?

Certificate of authorization required before installation.

How far from the lot lines must the unit be?

At least 1.5 m from the side and rear lot lines, no more than 2 m from the house wall.

Can a heat pump go in the front yard?

No. Not allowed in the front yard or the secondary front yard.

What is the noise limit?

50 dB maximum at the lot lines.

Who should I call to confirm before the work?

Municipal inspector, 450 826-3911, ext. 111, urbanisme@mun-sc.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 243-2024, s. 7.30; permits and certificates bylaw 246-2024, s. 2.13 (table 2.1) (consolidated June 2024).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating