No permit Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Gérard-Majella: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Gérard-Majella? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitNo permitNo certificate required for a residential heat pump or permanent A/C unit
FeeNot applicableNo permit is required.
Distance from lot lines2 mAt least 2 m from the lot lines, in the side and rear yards
Noise limitNot specifiedBylaw RM-2026: no figure for heat pumps (bans noise likely to disturb the neighbours)
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 2 m from the lot lines.

Side yardAllowed

At least 2 m from the lot lines.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • The same 2 m rule covers both “heat pumps” and “air-conditioning units”.
  • Permit issuance: up to 20 working days once the file is complete.
Who to call Urban planning department, 450 789-5777, urbanisme@saintgerardmajella.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Gérard-Majella?

No certificate required for a residential heat pump or permanent A/C unit.

How far from the lot lines must the unit be?

At least 2 m from the lot lines, in the side and rear yards.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Bylaw RM-2026: no figure for heat pumps (bans noise likely to disturb the neighbours).

Who should I call to confirm before the work?

Urban planning department, 450 789-5777, urbanisme@saintgerardmajella.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw RU-206-2020, s. 6.1; permits and certificates bylaw RU-210-2020, table 2, row 26; bylaw RM-2026, s. 142 (zoning in force May 12, 2021 (amended by 212-2021 and 216-2022); checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Gérard-Majella?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours