To be confirmed Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Joachim-de-Shefford: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Joachim-de-Shefford? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedNot specified: heat pumps are not on the list of certificates of authorization; confirm with the municipal inspector
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines5 m5 m from the lot line
Noise limitNot specifiedGeneral bylaw G-100 (549-2018): no figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

Allowed in the rear yard, at least 5 m from the lot line.

Side yardAllowed

Allowed in the side yard, at least 5 m from the lot line.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • The same 5 m rule applies in the farming area and in the village.
  • A geothermal system requires a certificate of authorization ($50).
Who to call Urban planner and building and environment inspector, 450 539-3201, ext. 224, inspecteur@st-joachim.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Joachim-de-Shefford?

Not specified: heat pumps are not on the list of certificates of authorization; confirm with the municipal inspector.

How far from the lot lines must the unit be?

5 m from the lot line.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

General bylaw G-100 (549-2018): no figure for heat pumps.

Who should I call to confirm before the work?

Urban planner and building and environment inspector, 450 539-3201, ext. 224, inspecteur@st-joachim.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 491-2007, s. 27, 29, 30, 79, 80 and 81; permits and certificates bylaw 494-2007, s. 24 and 33; general bylaw G-100 (549-2018) (administrative version MJ 7, August 2024).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Joachim-de-Shefford?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours