No published rule Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Placide: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Placide? No rule on heat pumps is published online for Saint-Placide. Here is what we checked, and what to ask before the work.

PermitTo be confirmedNot specified: confirm with urban planning
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot linesNot specifiedNot specified: the zoning bylaws are not published online
Noise limitNot specifiedNuisance bylaw: no figure for heat pumps
01 · What we checked

We looked. Nothing on heat pumps is published.

What we read

Nuisance bylaw 11-11-2023, s. 5.1; “Urbanisme et environnement” page; “Demande de permis général” form (checked September 30, 2026).

  • Two zoning bylaws apply depending on the sector: former village (184-93) and former parish (05-10-90).

What to ask the city

  1. Is a permit or a certificate of authorization required to install a heat pump?
  2. How far from the lot lines must the unit be?
  3. Which spots are allowed: backyard, side yard, front yard, balcony, roof?
  4. Is there a noise limit at the lot line?
  5. Which documents should come with the request?
02 · Before the work

Good to know, and who to call.

Confirm before the work

The official bylaw prevails. A quick call to the city settles any doubt before you order the unit.

Who to call Urban planning department, 450 258-2305, ext. 229, urbanisme@saintplacide.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Placide?

Not specified: confirm with urban planning.

Where can the unit go?

Not specified in the bylaw: confirm with urban planning.

Who should I call to confirm before the work?

Urban planning department, 450 258-2305, ext. 229, urbanisme@saintplacide.ca.

04 · Sources

Read at the source.

Sources: Nuisance bylaw 11-11-2023, s. 5.1; “Urbanisme et environnement” page; “Demande de permis général” form (checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Placide?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours