Heat pumps in Saint-Roch-de-Richelieu: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Roch-de-Richelieu? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedNot specified in the permits bylaw: confirm with urban planning.
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot linesNot specifiedNo distance set for air-conditioning units (s. 4.1.2).
Noise limitNot specifiedBylaw RM-2017: no decibel figure for heat pumps.
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

Allowed in the rear yard.

Side yardAllowed

Allowed in the side yard.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • The bylaw says “appareils de climatisation permanents” (permanent air-conditioning units); the word heat pump does not appear.
  • Processing time for a complete request: about 3 weeks.
Who to call Michèle Bérubé, building and environment officer (urban planning), 450 785-2755, ext. 27, permis@saintrochderichelieu.com Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Roch-de-Richelieu?

Not specified in the permits bylaw: confirm with urban planning.

How far from the lot lines must the unit be?

No distance set for air-conditioning units (s. 4.1.2).

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Bylaw RM-2017: no decibel figure for heat pumps.

Who should I call to confirm before the work?

Michèle Bérubé, building and environment officer (urban planning), 450 785-2755, ext. 27, permis@saintrochderichelieu.com.

04 · Sources

Read at the source.

Sources: Zoning bylaw 220 (consolidated June 9, 2026), s. 4.1.1 and 4.1.2 h); “Normes, permis et dérogation” FAQ; permits and certificates bylaw 226, s. 4.1 and 5.1; bylaw RM-2017, s. 6.1.5 (administrative consolidation of June 9, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Roch-de-Richelieu?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours