To be confirmed Permits and bylaws · Checked on September 30, 2026

Heat pumps in Saint-Simon: permits and bylaws

Planning a heat pump or an air conditioner in Saint-Simon? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitTo be confirmedNot specified in the permits bylaw: confirm with the inspector
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot lines3 mAt least 3 m from every property line
Noise limitNot specifiedNuisance bylaw 588-24: no figure for heat pumps
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

At least 3 m from every lot line.

Side yardWith conditions

Ground-mounted unit at least 3 m from every property line. Not allowed in the village core.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • The side-yard rule covers ground-mounted heat pumps and air conditioners.
  • Village core: heat pumps allowed in the rear yard only (s. 14.2).
  • The inspector is in the office on Tuesdays; book an appointment.
Who to call Building and environment inspector, 450 798-2276, ext. 223, inspecteur@saint-simon.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Saint-Simon?

Not specified in the permits bylaw: confirm with the inspector.

How far from the lot lines must the unit be?

At least 3 m from every property line.

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Nuisance bylaw 588-24: no figure for heat pumps.

Who should I call to confirm before the work?

Building and environment inspector, 450 798-2276, ext. 223, inspecteur@saint-simon.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 544-19, s. 4.5.1, 4.5.2 i), 4.5.3, 7.10 and 14.2; permits bylaw 547-19; nuisance bylaw 588-24 (administrative consolidation of July 15, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Saint-Simon?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours