Permit required Permits and bylaws · Checked on September 30, 2026

Heat pumps in Sainte-Brigide-d’Iberville: permits and bylaws

Planning a heat pump or an air conditioner in Sainte-Brigide-d’Iberville? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredPermit required before installation ($20)
Fee$20Fee published by the city.
Distance from lot lines3 m (1 m in zone Ra-10)At least 3 m from the lot lines (1 m in zone Ra-10)
Noise limitNot specifiedNo noise bylaw published by the Municipality; no decibel figure in the zoning bylaw
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardWith conditions

At least 3 m from the lot lines, behind a fence, hedge or planting that hides it from the street.

Side yardWith conditions

At least 3 m from the lot lines, screened by landscaping and not visible from the street.

Front yardNot allowed

Not allowed in the front yard.

BalconyWith conditions

Multi-unit buildings only: a heat pump serving a single dwelling, camouflaged if it can be seen from a street.

Flat roofWith conditions

Allowed if it blends with the building’s architecture and cannot be seen from the street.

02 · Before the work

Good to know, and who to call.

Good to know

  • Zone Ra-10: at least 1 m from the lot lines and outside any servitude.
  • The zoning bylaw also mentions 0.6 m (s. 5.16) and 1.5 m (s. 6.69): the 3 m residential rule (s. 6.13) applies, since the most specific and most restrictive provision prevails (s. 3.4).
  • The building inspector is in on Wednesdays only; apply with the form, in person or by email.
Who to call Antoine Gauthier, building inspector (Wednesdays), 450 293-7511, ext. 3, inspecteur@sainte-brigide.qc.ca Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Sainte-Brigide-d’Iberville?

Permit required before installation ($20). Published fee: $20.

How far from the lot lines must the unit be?

At least 3 m from the lot lines (1 m in zone Ra-10).

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

No noise bylaw published by the Municipality; no decibel figure in the zoning bylaw.

Who should I call to confirm before the work?

Antoine Gauthier, building inspector (Wednesdays), 450 293-7511, ext. 3, inspecteur@sainte-brigide.qc.ca.

04 · Sources

Read at the source.

Sources: Zoning bylaw 2025-474 (consolidation 2025-474-01), s. 3.4, 5.14 to 5.17, 6.13 and 6.69; permits and certificates bylaw 2025-477, s. 3.1 (administrative consolidation 2025-474-01 (posted November 2025); checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Sainte-Brigide-d’Iberville?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours