Heat pumps in Sainte-Victoire-de-Sorel: permits and bylaws

Planning a heat pump or an air conditioner in Sainte-Victoire-de-Sorel? Here is what the bylaws say: the permit, the distance from the lot lines, where the unit can go and the noise limit. It all comes from the official texts.

PermitPermit requiredPermit required before installation (apply 30 days before the work)
FeeNot publishedNo fee is published online: ask urban planning.
Distance from lot linesNot specifiedNo distance set for air-conditioning units (s. 4.1.1.2 and 4.1.1.3).
Noise limitNot specifiedBylaw RM-2026: no decibel figure for heat pumps.
01 · Where the unit can go

Five spots, one answer for each.

Each answer is the bylaw rule, in short. “Not specified” means the text does not say: ask urban planning.

BackyardAllowed

Allowed in the rear yard.

Side yardAllowed

Allowed in the side yard.

Front yardNot allowed

Not allowed in the front yard.

BalconyNot specified

Not specified in the bylaw: confirm with urban planning.

Flat roofNot specified

Not specified in the bylaw: confirm with urban planning.

02 · Before the work

Good to know, and who to call.

Good to know

  • The bylaw says “appareils de climatisation” (air-conditioning units); the word heat pump does not appear.
  • Permit cost: $20 to $50 depending on the work.
Who to call Xavier Rajotte, building inspector, 450 782-3111, ext. 223 Ask them to confirm the rules for your address before the work.
03 · Questions

The short answers.

Do you need a permit to install a heat pump in Sainte-Victoire-de-Sorel?

Permit required before installation (apply 30 days before the work).

How far from the lot lines must the unit be?

No distance set for air-conditioning units (s. 4.1.1.2 and 4.1.1.3).

Can a heat pump go in the front yard?

No. Not allowed in the front yard.

What is the noise limit?

Bylaw RM-2026: no decibel figure for heat pumps.

Who should I call to confirm before the work?

Xavier Rajotte, building inspector, 450 782-3111, ext. 223.

04 · Sources

Read at the source.

Sources: Zoning bylaw 290-06 (consolidated), s. 4.1.1.1 to 4.1.1.3; Municipality’s “Demande de permis” page; bylaw RM-2026, s. 142 (checked September 30, 2026).

Checked by AirGreen on September 30, 2026.

This page is a summary. The official bylaw prevails. Confirm with the city before the work.

Compare the rules of other municipalities

AirGreen · Air conditioning and heating

A heat pump project in Sainte-Victoire-de-Sorel?

We come and see your property, and the estimate is free.

RBQ licence 5645-9605-01Subclasses 15.8, 15.10 and 16.
Free on-site estimate
Quote within 24 hours