Project

Installation of a GREE FLEXX Electric Furnace Air Handler in Île-des-Sœurs, Montreal

A central HVAC installation in Île-des-Sœurs with a GREE FLEXX Air Handler, connected to an existing duct network in a technical basement, with custom metal transition, drainage, and careful integration.

By AirGreen Climatisation & Chauffage Admin14 min read
Installation of a GREE FLEXX Electric Furnace Air Handler in Île-des-Sœurs, Montreal
Installation of a GREE FLEXX Electric Furnace Air Handler in Île-des-Sœurs, Montreal
–chapters in this story
14 minreading time
–type of installation
2026year published
The tour

Take a tour of the installation

Each number is a point we check on site. Switch between summer and winter to watch air and heat move.

Generic diagram: central heat pump, indoor module and ducts

In summer, the outdoor unit rejects the house's heat outside.

Generic illustration of this type of installation, not a survey of this job site. Tap a number.

  1. It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.

  2. The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.

  3. A shut-off switch near the outdoor unit isolates it safely for service.

  4. Sitting on the indoor module, it moves heat between the house air and the refrigerant.

  5. Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.

  6. Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.

  7. It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.

  8. It runs the heat pump and the backup heat. It must be compatible with the installed system.

The job

A GREE FLEXX central system integrated into a technical basement in Île-des-Sœurs

In Île-des-Sœurs, central heating and central air conditioning projects require a very precise approach. Several properties in the area combine compact mechanical spaces, existing ducts, ongoing renovations, open ceilings, concrete walls, plumbing passages, and access constraints that leave almost no room for improvisation. This installation of a GREE FLEXX Air Handler, used as an electric furnace in a central forced-air configuration, perfectly illustrates the type of project where AirGreen’s field experience makes a tangible difference.

In the photo, you can see a vertical unit connected to a metal plenum and an existing duct network. The mechanical space is occupied by a water heater, copper lines, sheet metal ducts, open framing, cables on standby, and renovation elements. The unit was therefore not simply “placed” in the room: it was integrated into a live technical area, where every connection, clearance, and alignment influences the final result.

Unlike a wall-mounted heat pump or a wall-mounted air conditioner, a system like the GREE FLEXX targets centralized air distribution. Heated or cooled air circulates through ducts to serve multiple rooms. It is a particularly relevant solution for homeowners who want to keep an existing duct network, replace an old furnace, modernize a central system, or prepare a complete installation with a central heat pump.

Why the GREE FLEXX was suitable for this project

The GREE FLEXX is designed for residential central ducted systems. GREE presents this range as a flexible central solution, integrating Inverter technology, compatible with 24 VAC thermostats, and designed to blend discreetly into residential forced-air installations. Depending on the configurations, the FLEXX range can reach up to 17 SEER2 and 10.5 HSPF2, making it an attractive option for customers who want to combine comfort, efficiency, and central distribution.

In this project on Île-des-Sœurs, the choice of the GREE FLEXX air handler met a clear need: to maintain a central comfort logic, avoid adding multiple visible wall units, and use the duct network as the distribution base. For an owner, this means a more discreet solution in living spaces, with better temperature distribution when the ducts are properly sized and sealed.

The FLEXX system is also appreciated for its installation flexibility. GREE FLEXX central configurations are designed for replacement projects as well as additions to existing installations, notably thanks to their compatibility with 24 VAC controls and their design adapted to duct systems. The FLEXX R32 version is also presented by Dettson as a central heat pump system with R32 refrigerant, intended for environments where mechanical integration can be demanding.

A duct connection that required careful fabrication

The most visible point of this installation is the metal transition between the air handler and the existing duct network. This sheet metal piece is not just an aesthetic fitting. It plays a crucial role in the system's operation.

In a central system, air must flow with as little resistance as possible. A poorly designed transition can create turbulence, increase noise, reduce airflow, strain the fan motor, and harm overall performance. Here, the transition was designed to connect the unit to the existing distribution while taking into account the available space, ceiling height, and the position of the ducts already in place.

We paid special attention to three elements:

  • the vertical alignment between the unit and the existing plenum;
  • the quality of the sealing to limit air leaks;
  • the rigidity of the transition to reduce vibrations and unwanted noise.

This type of work is common in central installations in Montreal, but each site has its own reality. On Île-des-Sœurs, mechanical spaces can be very functional but often tight between the structure, concrete, plumbing, domestic equipment, and renovation areas.

An installation designed around the water heater and existing plumbing

The presence of the water heater to the right of the device imposed a significant constraint. It was necessary to maintain reasonable access to the existing equipment, preserve the required clearances, and organize connections without cluttering the area.

In a mechanical room, a good installer does not only think about the device they are installing that day. They also consider future maintenance of the water heater, access to ducts, service panels, copper lines, wires, the drain, filters, and any plumbing or electrical interventions.

In this project, we installed the device to maximize the use of available space while maintaining a logical service layout. This is a detail many customers do not immediately notice but becomes very important over time. A poorly positioned HVAC installation can complicate every future maintenance. A well-planned installation, on the other hand, allows for clean, quick work with less risk to neighboring equipment.

Electric furnace or air handler: an important distinction

Many customers use the term electric furnace to refer to any central device that distributes warm air through ducts. In practice, an air handler like the GREE FLEXX is an indoor unit that circulates air through the duct network and can integrate with a compatible central heat pump system. Depending on the chosen configuration, supplementary electric heating can also be used to complement the system during colder periods or according to the building's needs.

This distinction is essential when comparing options. An old traditional electric furnace can be replaced by a modern central system, but the entire installation must then be checked:

  • the available electrical capacity;
  • the compatibility of the electrical panel;
  • the actual capacity needed in BTU;
  • the condition of the ducts;
  • the required airflow;
  • the static pressure;
  • the location of the outdoor unit;
  • the thermostat;
  • the needs for supplementary heating;
  • eligibility criteria for subsidies.

In Laval, Longueuil, on the North Shore and the South Shore, we often perform this type of analysis when clients want to modernize an existing central system. In Montreal, especially in areas like Île-des-Sœurs, Verdun, Rosemont, Ahuntsic, or Plateau-Mont-Royal, the analysis must also take into account the building's physical constraints.

The invisible work that makes the quality of a central HVAC installation

A central installation like this is rarely judged by a single element. The final quality depends rather on a set of technical decisions: equipment positioning, duct transition, sealing, drainage, insulation, service access, electrical connections, startup, airflow verification, and thermostat configuration.

Sealing the ducts: a comfort gain often underestimated

In a forced-air system, every air leak represents a loss of efficiency. When treated air escapes into the basement or a technical area, it does not reach where the customer needs it. This can create temperature differences between rooms, force the system to work longer, and increase energy consumption.

During this installation of the GREE FLEXX Air Handler, the visible joints around the transition were carefully treated. The goal was to reduce air leaks and allow the system to distribute heating and air conditioning more steadily.

This work is especially important in houses or condos where the duct network has been modified over the years. Some properties have undergone several renovations, added partitions, equipment changes, or partial adaptations. Before concluding that a device lacks capacity, it is often necessary to check if the duct network is actually working as it should.

Sizing: avoiding systems that are too large or too small

A central system must be sized according to the reality of the building, and not just based on an approximate area rule. For a project in Île-des-Sœurs, we specifically analyze:

  • the served area;
  • the level of insulation;
  • the heat losses;
  • the wind exposure;
  • the window area;
  • the ceiling height;
  • the condition of the ducts;
  • the number of registers;
  • the actual heating need;
  • the air conditioning load in summer.

A device that is too small will run too long and may not meet needs during periods of intense cold or heat. A device that is too large can produce short cycles, harm dehumidification, cause temperature fluctuations, and increase wear. The right choice lies in balancing capacity, modulation, air distribution, and control.

Performance data for GREE FLEXX systems vary according to capacities and pairings. Some certified configurations indicate different performances depending on the indoor model, outdoor model, and AHRI number. For example, ENERGY STAR sheets for the FLEXX High-efficiency series show configurations with continuous modulation compressors and documented heating and cooling capacities according to the tested pairing.

The importance of commissioning

Once the device is installed, commissioning is a crucial step. It is not limited to checking if the system starts. It is necessary to confirm that the installation works as expected:

  • connection verification;
  • thermostat control;
  • operation sequence validation;
  • airflow verification;
  • drainage inspection;
  • noise and vibration control;
  • clearance checks;
  • explanation of use to the customer.

At AirGreen, this step is an integral part of the work. A customer must understand how to use their system, when to replace or clean filters, what signs to watch for, and when to schedule a HVAC maintenance. A well-installed central system also deserves to be well used.

Common mistakes to avoid with a central air handler

This installation on Île-des-Sœurs serves as a reminder of several mistakes we sometimes see in furnace replacement or central heat pump addition projects.

The first mistake is keeping a poor duct connection. Even an excellent device will lose efficiency if the air leaves the unit through a transition that is too abrupt, poorly sealed, or improperly sized.

The second mistake is neglecting service access. An air handler must remain accessible for the filter, panels, electrical components, and inspections.

The third mistake is underestimating the static pressure. A restrictive duct network can limit performance and increase noise.

The fourth mistake is choosing the device without checking the electrical panel. Central systems with auxiliary heating may require serious electrical planning.

The fifth mistake is treating the technical basement as just a storage space. In reality, it is often the mechanical heart of the property. A clean, stable, and well-thought-out installation protects the comfort of the entire house.

Subsidies and eligibility: check the complete system

For clients comparing central systems in Montreal, Laval, Longueuil, on the North Shore or the South Shore, financial aid can influence the final choice. However, caution is needed: eligibility does not depend solely on the trade name or the appearance of the device. It generally depends on the complete system, the pairing between the indoor and outdoor units, the AHRI number, heating capacity, certified performance, and the rules in effect at the time of installation.

In a project like this, we therefore verify the system information before giving a final recommendation to the client. This method avoids unpleasant surprises and allows choosing a solution consistent with the desired comfort, budget, and available programs.

A solution adapted to the realities of Île-des-Sœurs

Île-des-Sœurs has a unique profile in the Greater Montreal HVAC market. It features condos, townhouses, renovated properties, existing central systems, sometimes very compact mechanical spaces, and high expectations for comfort and discretion. Noise, bulkiness, interior aesthetics, and reliability are often major criteria.

A well-installed GREE FLEXX Air Handler meets several of these expectations. It maintains central distribution, limits the presence of visible equipment in living spaces, and allows integration with a central heat pump system when the configuration is appropriate. For the customer, the desired result is simple: a more stable temperature, intuitive use, and a system that integrates into the building without taking up all the space.

Practical advice for homeowners considering furnace replacement

Before replacing an old electric furnace with a modern air handler, we recommend checking several points:

  • the condition of the duct network;
  • the capacity of the electrical panel;
  • the available space around the unit;
  • access to the filter and panels;
  • the actual heating and air conditioning needs;
  • compatibility with an outdoor heat pump;
  • the type of thermostat required;
  • the presence of an adequate drain;
  • the expected noise level;
  • possible subsidies depending on the exact pairing.

These checks help avoid hasty decisions. A central installation is a complete system, not just a unit. Final comfort depends on how the air circulates, how the system modulates, and the quality of the connections between the new equipment and the existing infrastructure.

AirGreen: a hands-on approach for central systems

At AirGreen, we regularly carry out installations of central heat pumps, electric furnaces, air handlers, central air conditioners, and hybrid systems in Greater Montreal. Our experience in Montreal, Laval, Longueuil, on the North Shore, and on the South Shore allows us to adapt each project to the realities of the building.

In this specific case in Île-des-Sœurs, our work involved integrating the GREE FLEXX Air Handler into a busy technical space, fabricating a clean metal transition, respecting the logic of the duct network, and preparing the system for reliable use. This type of project requires rigor but also a good understanding of the building.

A central, clean, and durable result

The final result is a central HVAC installation designed to last: a well-positioned unit, a suitable duct transition, integration into a real technical basement, and a solution that respects the constraints of a property in Île-des-Sœurs.

For the customer, the main advantage is central comfort. The system can distribute air to multiple rooms, maintain better temperature uniformity, and integrate into the existing infrastructure without altering living spaces. For AirGreen, this project represents exactly what we value in a central installation: a relevant equipment choice, clean execution, thoughtful connections, and constant attention to details that will make a difference over years of use.

The steps

The big day, step by step

The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

Step 1 of 9The on-site estimate

We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.

  1. The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
  2. The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
  3. Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
  4. The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
  5. The outdoor unitOn a level base, raised above the snow, with free space all around.
  6. The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
  7. Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
  8. Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
  9. The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
Your numbers

What would it look like at your place?

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Size checkYour electric furnace, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    Mistakes avoided

    Four mistakes we do not make

    Flip each card to see what we do instead.

    Going further

    Your own project, step by step

    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Check the indoor module's filter.
    • Clear winter debris from the outdoor unit.
    • Test cooling before the heat arrives.
    At your place

    Is your home ready?

    Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.

    0 / 6 checked
    True or false

    Four statements: true or false?

    It all comes down to details you have just seen.

    1. A central heat pump uses the house's ducts.

    2. In extreme cold, electric backup heat can take over.

    3. The filter only gets changed when the unit breaks down.

    4. You can reuse the old unit's size without checking.

    Frequently asked questions

    What people ask us about this kind of work

    11 questions
    Can I keep my current ducts?
    Often, yes: the central heat pump connects to the existing ducts. We check their condition and size during the estimate.
    What happens in extreme cold?
    The indoor module (furnace or air handler) works with the central heat pump and takes over in extreme cold.
    Furnace, air handler, ducted: what is the difference?
    The furnace or air handler is the indoor module of the central system. A ducted system hides in the ceiling: all you see are small supply grilles.
    Are there grants?
    Depending on the equipment and your situation, assistance programs may apply. AirGreen checks the exact combination before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city. See permits and by-laws, and we check for your address.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Will my current thermostat work?
    Not always: the thermostat has to run the heat pump and the backup heat. We check compatibility during the estimate.
    Central or wall units: which one?
    If the house has ducts in good shape, a central system heats and cools every room at once. Without ducts, wall units or a multi-zone are often simpler. We compare on site.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    Every house has its constraints. We see them before we install.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment