Project

Installation of a MIDEA EVOX G3 2-ton electric furnace with central system and air handler in Côte Saint-Luc

AirGreen installs a MIDEA EVOX G3 2-ton electric furnace with central system and air handler in Côte Saint-Luc, in a compact mechanical room requiring precise HVAC integration.

By AirGreen Climatisation & Chauffage Admin14 min read
Installation of a MIDEA EVOX G3 2-ton electric furnace with central system and air handler in Côte Saint-Luc
Installation of a MIDEA EVOX G3 2-ton electric furnace with central system and air handler in Côte Saint-Luc
–chapters in this story
14 minreading time
–type of installation
2026year published
The tour

Take a tour of the installation

Each number is a point we check on site. Switch between summer and winter to watch air and heat move.

Generic diagram: central heat pump, indoor module and ducts

In summer, the outdoor unit rejects the house's heat outside.

Generic illustration of this type of installation, not a survey of this job site. Tap a number.

  1. It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.

  2. The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.

  3. A shut-off switch near the outdoor unit isolates it safely for service.

  4. Sitting on the indoor module, it moves heat between the house air and the refrigerant.

  5. Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.

  6. Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.

  7. It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.

  8. It runs the heat pump and the backup heat. It must be compatible with the installed system.

The job

A compact, precise installation perfectly adapted to the mechanical constraints of a house in Côte Saint-Luc

In Côte Saint-Luc, many residences have narrow mechanical rooms, existing ducts modified over the years, and stone or masonry foundation walls that require a much more careful approach than a simple standard installation. This is exactly the context in which our AirGreen team carried out this HVAC installation of a MIDEA EVOX G3 2-ton electric furnace, integrated into a central system with an air handler, in a technical space where every inch had to be intelligently used.

The project involved installing a high-performance, clean, and well-suited MIDEA central solution for a house where the existing air distribution had to be retained, adjusted, and carefully connected. The project image clearly shows the reality of the site: a cramped mechanical space, an existing return air duct, metal ducts to adapt, an exposed stone foundation, condensate drainage organized at the bottom of the unit, as well as limited access around the appliance. For a less experienced team, this type of configuration can quickly become problematic. For us, this is the kind of situation where good preparation makes all the difference.

At AirGreen, we approach every central electric furnace installation as a complete project: performance, airflow, safety, future maintenance, duct sealing, condensate drainage, component accessibility, and clean integration into the existing environment. In Montreal, Laval, Longueuil, on the North Shore and the South Shore, we often encounter homes where the HVAC system needs to be modernized without starting from scratch. This project in Côte Saint-Luc is an excellent example of this.

A MIDEA EVOX G3 2-ton central system designed for comfort, efficiency, and reliability

The MIDEA EVOX G3 2-ton unit installed in this residence is one of the modern central solutions that perfectly meet the needs of homeowners looking for better comfort, energy efficiency, and uniform air distribution throughout the house. In a central configuration, the air handler plays an essential role: it ensures air circulation through the ducts, allows for better temperature homogeneity, and facilitates integration with existing or newly installed heating and air conditioning equipment.

In this specific case, the choice of a 2-ton capacity was particularly relevant. A unit that was too small would have forced the system to work longer, resulting in less stable comfort. A unit that was too large could have caused short cycles, poor dehumidification during air conditioning, and premature wear. Proper sizing is one of the most important steps in a successful HVAC installation, especially when it comes to a central system connected to an existing duct network in the house.

Why the MIDEA EVOX G3 was the logical choice for this house

The MIDEA EVOX G3 model integrates particularly well into HVAC replacement or modernization projects where a reliable, flexible, and efficient solution is sought. For this installation in Côte Saint-Luc, several elements made this choice appropriate:

  • the 2-ton capacity, well-suited to the residence's thermal load;
  • compatibility with a central configuration;
  • possible integration with existing ducts;
  • a relatively compact format, useful in restricted mechanical rooms;
  • a modern design that facilitates maintenance when installation is well-planned;
  • an excellent option for homeowners who want to improve their comfort without multiplying wall-mounted units in the house.

In several projects carried out by AirGreen in Montreal, Laval, Longueuil, on the North Shore and the South Shore, we find that clients are increasingly looking for discreet central systems that can heat, cool, and ventilate efficiently without compromising interior aesthetics. A central solution like this allows for air distribution through ducts, which remains highly appreciated in homes where room-by-room comfort must remain uniform.

A demanding mechanical room: little space, multiple connections, and an existing duct to respect

One of the most interesting aspects of this project lies in the mechanical environment itself. The MIDEA electric furnace was installed next to a significant metal casing connected to existing ducts. The presence of a stone wall, an already installed duct network, and limited side clearance required a carefully thought-out installation sequence.

In the image, we particularly notice:

  • a MIDEA unit installed vertically in a narrow space;
  • an adjacent return or supply air duct, with metal register;
  • existing upper ducts to be neatly connected;
  • a PVC drain pipe on the left wall;
  • a condensate pump installed at the base of the unit;
  • carefully oriented refrigerant and electrical connections;
  • floor protection and attention to the cleanliness of the site.

This type of configuration requires precision. The connection to the existing duct cannot be improvised. A bad metal transition can create pressure losses, noise, vibrations, air leaks, or poor circulation in certain rooms. Our team therefore paid particular attention to sealing, alignment, the solidity of the assemblies, and future access to service panels.

The importance of airflow in a central installation

In an electric furnace with an air handler, airflow is as important as the nominal capacity of the unit. Even excellent equipment can yield poor results if the duct network is not well adapted. Too low an airflow can lead to overheating, reduced performance, discomfort in distant rooms, and increased consumption. An imbalanced airflow can also cause temperature differences between floors or between different sides of the house.

During this project in Côte Saint-Luc, our team checked the main connections, transitions, restriction points, and how air should circulate through the system. The goal was not only to make the unit work, but to deliver a durable, stable, and comfortable HVAC installation.

Clean and safe condensate drainage

The presence of a condensate pump at the bottom of the installation is an important detail. In a central system, condensate water management must be treated seriously, especially when the unit is installed in a basement or mechanical room where natural drainage is not always possible.

A poorly positioned pump, a badly fixed pipe, or an inadequate slope can cause water damage, system shutdowns, or avoidable service calls. In this installation, the condensate pump was placed in an accessible manner, with organized connections to allow for maintenance and inspection. This may seem like a minor detail, but it is of great importance for the daily reliability of a central system.

Clean connections despite a cramped mechanical space

The MIDEA EVOX G3 panel shows several connection zones at the bottom of the unit. In such a confined space, it is necessary to avoid forced curves, unnecessary tension on the lines, poorly protected wires, or pipes positioned in a way that hinders future access. The goal is always to install the unit professionally, but also to think about the technician who will have to return in a few years for HVAC maintenance, inspection, cleaning, or diagnosis.

At AirGreen, we insist on this approach because a good installation must not only be functional on the day it is commissioned. It must remain logical, accessible, and safe throughout the life of the system.

The particular challenges of Côte Saint-Luc homes

Côte Saint-Luc has many residences where mechanical spaces have been adapted over time. You often find existing ducts, older installations, massive foundations, low basement ceilings, and limited technical passages. For homeowners, the challenge is often to modernize comfort without completely transforming the house.

This project clearly illustrates this reality. Rather than replacing the entire network or forcing an unsuitable configuration, we worked with the existing setup, while improving the quality of the connection and the efficiency of the whole system. This is an approach we regularly use in Greater Montreal, particularly in Montreal, Laval, Longueuil, on the North Shore and the South Shore, when clients want a high-performance solution without unnecessary work.

What homeowners should check before choosing a central electric furnace

Before installing an electric furnace, an air handler, or a central heat pump, several elements must be carefully evaluated. The most frequent errors do not always come from the brand choice, but rather from incorrect sizing or a poor understanding of the building.

Here are the points we always recommend checking:

  1. The actual capacity required

    A 2-ton unit may be perfect in one house, but insufficient or excessive in another. The calculation depends on insulation, area, sun exposure, number of floors, window quality, and the duct network.

  2. The condition of existing ducts

    A central system heavily relies on its ducts. Poorly sealed, undersized, or unbalanced ducts can reduce performance, even with a new unit.

  3. Access to the mechanical room

    The space available around the unit must allow for installation, but also for maintenance. A unit squeezed in without clearance can become costly to maintain.

  4. Condensate drainage

    In a basement, a pump may be necessary. It must be properly installed, tested, and easily accessible.

  5. Electrical compatibility

    An electric furnace or modern central system may require an electrical supply check. It should never be assumed that the existing panel is automatically compatible.

  6. Subsidies and eligibility criteria

    Some installations may be eligible for financial assistance programs depending on the chosen equipment, project configuration, and current criteria. Amounts and conditions may vary, making professional support particularly useful.

An installation that also prepares for future maintenance

Maintenance is often overlooked at the time of purchase, but it directly influences the equipment's lifespan. In this project, we ensured reasonable access to important areas of the unit. The filter, condensate pump, connections, and panels must be inspectable without unnecessarily disassembling the installation.

Regular HVAC maintenance helps maintain good airflow, reduce noise risks, protect internal components, and prevent dust accumulation in the system. For a central system, it is also important to monitor the condition of the ducts, registers, return grilles, and the cleanliness of internal components.

Customer experience: modernization without unnecessary complexity

For homeowners, this type of project can seem daunting. A narrow mechanical room, existing ducts, an old system to replace or adapt, electrical connections, and condensate drainage can give the impression of a complex undertaking. Our role is precisely to make the process clear, structured, and reassuring.

In this installation in Côte Saint-Luc, our team took the time to protect the workspace, plan connections, limit unnecessary interventions, and deliver a functional, clean system adapted to the residence's needs. The client was not looking for a spectacular installation, but a reliable solution, well-integrated, and ready to offer stable daily comfort. This is often what homeowners appreciate most: an installation that works well, without visible compromises, improvisations, or future complications.

Why choose AirGreen for a central HVAC installation

A central HVAC installation requires more than just knowledge of the appliance. It requires an understanding of the building, the duct network, air behavior, electrical constraints, condensate drainage, and long-term maintenance. At AirGreen, we carry out this type of project in very varied contexts: single-family homes, condos, duplexes, triplexes, rental buildings, and light commercial buildings.

Our expertise in Greater Montreal allows us to quickly recognize common pitfalls:

  • undersized existing ducts;
  • poorly designed metal transitions;
  • insufficient clearances;
  • neglected condensate drainage;
  • poor capacity selection;
  • units installed without service access;
  • filters difficult to replace;
  • noise caused by poor airflow;
  • efficiency losses due to duct leaks.

In this project in Côte Saint-Luc, the success of the installation relies precisely on this attention to detail. The 2-ton MIDEA EVOX G3 was not simply placed in the mechanical room: it was integrated into an existing environment with a logic of performance, durability, and comfort.

A discreet central solution for uniform comfort

Unlike some wall-mounted systems visible in rooms, a central system with an air handler allows for a more discreet interior appearance. Air circulates through grilles and ducts, enabling more uniform distribution across multiple rooms at once. For residences in Côte Saint-Luc, where owners often wish to preserve interior aesthetics while modernizing their comfort, this solution is particularly appealing.

The 2-ton MIDEA EVOX G3 installed here aligns with this logic: it provides a solid foundation for centralized comfort, while respecting the physical constraints of the house. This is a solution suitable for both owners replacing old equipment and those looking to improve the performance of their existing system.

Mistakes to avoid in this type of installation

A project like this may seem simple at first glance, but several errors can negatively impact the final result:

  • choosing capacity without serious analysis;
  • connecting the unit to an existing duct without checking airflow;
  • neglecting the sealing of metal joints;
  • installing the condensate pump in a hard-to-reach location;
  • blocking service panels;
  • forgetting to check the electrical panel;
  • ignoring possible vibrations in the ducts;
  • leaving connections exposed or poorly organized;
  • failing to plan for future maintenance.

These errors can be costly in the long run. They can reduce comfort, increase service calls, and shorten equipment lifespan. That's why we always recommend entrusting this type of project to a team that understands both modern appliances and the realities of homes in Greater Montreal.

An installation representative of AirGreen's work

This installation of a 2-ton MIDEA EVOX G3 electric furnace in Côte Saint-Luc perfectly represents our working method: observe, analyze, adapt, install cleanly, and think beyond simple startup. Every project is different, especially when it comes to a central system in an existing home. Our goal always remains the same: to offer a reliable, well-integrated, and durable HVAC solution.

Whether in Montreal, Laval, Longueuil, on the North Shore or the South Shore, AirGreen supports homeowners in the selection, installation, and maintenance of their HVAC equipment with a technical, transparent, and comfort-oriented approach. In this project, the combination of the right equipment, careful installation, and precise understanding of mechanical constraints allowed us to deliver a central system ready to meet the residence's needs for years to come.

The steps

The big day, step by step

The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

Step 1 of 9The on-site estimate

We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.

  1. The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
  2. The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
  3. Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
  4. The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
  5. The outdoor unitOn a level base, raised above the snow, with free space all around.
  6. The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
  7. Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
  8. Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
  9. The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
Your numbers

What would it look like at your place?

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Size checkYour electric furnace, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    Mistakes avoided

    Four mistakes we do not make

    Flip each card to see what we do instead.

    Going further

    Your own project, step by step

    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Check the indoor module's filter.
    • Clear winter debris from the outdoor unit.
    • Test cooling before the heat arrives.
    At your place

    Is your home ready?

    Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.

    0 / 6 checked
    True or false

    Four statements: true or false?

    It all comes down to details you have just seen.

    1. A central heat pump uses the house's ducts.

    2. In extreme cold, electric backup heat can take over.

    3. The filter only gets changed when the unit breaks down.

    4. You can reuse the old unit's size without checking.

    Frequently asked questions

    What people ask us about this kind of work

    11 questions
    Can I keep my current ducts?
    Often, yes: the central heat pump connects to the existing ducts. We check their condition and size during the estimate.
    What happens in extreme cold?
    The indoor module (furnace or air handler) works with the central heat pump and takes over in extreme cold.
    Furnace, air handler, ducted: what is the difference?
    The furnace or air handler is the indoor module of the central system. A ducted system hides in the ceiling: all you see are small supply grilles.
    Are there grants?
    Depending on the equipment and your situation, assistance programs may apply. AirGreen checks the exact combination before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city. See permits and by-laws, and we check for your address.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Will my current thermostat work?
    Not always: the thermostat has to run the heat pump and the backup heat. We check compatibility during the estimate.
    Central or wall units: which one?
    If the house has ducts in good shape, a central system heats and cools every room at once. Without ducts, wall units or a multi-zone are often simpler. We compare on site.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    Every house has its constraints. We see them before we install.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment