Installation of a Fujitsu AIRSTAGE wall-mounted heat pump in Sainte-Rose (Laval)
House in Sainte-Rose (Laval): HVAC installation of a Fujitsu AIRSTAGE heat pump (R-32) on wall brackets with anti-vibration pads, direct drilling and electrical disconnection. Four-season comfort — AirGreen service Montreal, Laval, Longueuil, North Shore, South Shore .
- City
- Region
- Equipment
- Brand
- Challenges
- Published
The job on one screen

The article, chapter by chapter
Reliable heating in extreme cold and quiet air conditioning for a suburban home
In this project in Sainte-Rose (Laval) , we are installing a Fujitsu AIRSTAGE wall-mounted heat pump on a brick facade, high up on wall brackets . The goal: stable comfort all year round, discreet integration, controlled vibrations and easy access for maintenance - all while respecting the requirements of a single-family home with a backyard.
Customer context and load assessment
The owner wanted to replace a window air conditioner and reduce his winter electricity bill. The ground floor includes a west-facing living room with patio doors, an open kitchen, and a staircase leading upstairs. We performed a simplified load calculation: good quality envelope, properly insulated attic, moderate air infiltration. Peak needs lead to a unit ≈ 12,000–15,000 BTU/h capable of heating efficiently down to −26 °C . Fujitsu's AIRSTAGE R-32 platform is the preferred choice for its high seasonal efficiency and fine modulation at low speeds, ideal for Quebec's shoulder seasons.
Technological choice: why Fujitsu AIRSTAGE (R-32)
-
Efficiency : R-32 refrigerant improves efficiency compared to R-410A and reduces the load, guaranteeing savings in air conditioning and heating.
-
Extreme cold : Fujitsu's high-performance wall-mounted range maintains a useful capacity below -20°C , with defrosting logic that preserves the heat delivered to the rooms.
-
Quiet : Inverter motor and profiled exterior fan for low noise levels – an asset in a quiet residential area.
-
Reliability : Proven components, surge protection and well-ventilated electronic boards inside the housing.
-
Control : Weekly timer, Night Quiet mode and Wi-Fi compatibility depending on the indoor head chosen.
Remember : a modern wall-mounted heat pump is not just for air conditioning; it provides efficient heating for most of the winter in Montreal , Laval and the North Shore , by replacing or replacing electric baseboard heaters.
Exterior installation: wall brackets on brick, clearances and anti-vibration
The condenser is fixed to the brick wall , approximately 1.8 m from the ground. This height protects the unit from snow accumulation, facilitates the flow of defrost water and frees up floor space.
-
Galvanized brackets sized for dynamic load; mechanical anchors suitable for brick, tightened to the recommended torque.
-
Anti-vibration pads under the unit pads to cut structural transmission to the masonry and eliminate hums perceived inside.
-
Clearances are maintained at the back, bottom and front of the grille; the unit is positioned away from an awning and a wooden fence, as well as a nearby satellite dish, to avoid any air recirculation and to preserve service access.
-
Laser checked level and plumb to ensure compressor oil stays where it should and defrost drain drains properly.
Refrigeration route, drilling and finishing
We favor the shortest route : direct crossing of the wall behind the condenser towards the interior head placed in the living room.
-
Core drilling with a slight outward slope for a gravity drain in air conditioning mode (no pump required).
-
Insulated copper refrigeration connections (high density closed cell); all joints are brazed then heat insulated, with UV protection tape on exposed sections.
-
Discreet exterior capping , in a neutral tone to match the carpentry and masonry, for a clean and durable finish.
-
Estimated total length ≈ 2–3 m , which reduces pressure losses and improves the response of the installation.
Power supply and compliance
In the immediate vicinity of the unit, we install an external disconnect switch (waterproof box) visible on the facade. The dedicated circuit from the main panel receives the rating and circuit breaker prescribed by the manufacturer. Before commissioning:
-
Nitrogen pressure test to check for leaks.
-
Deep vacuum until stable pressure is reached, proof of absence of moisture and leaks.
-
Opening of valves , control of intensities, subcooling and superheating .
-
Setting Quiet mode and eco setting.
Noise management: good practices in the neighborhood
In a suburban home, sound perception matters as much as the dB value.
-
Mechanical decoupling via pads and neoprene spacers.
-
Blowing orientation to avoid reflections on the steel sidewall and fence.
-
Night regime : activation of a softened profile between 10 p.m. and 6 a.m., while maintaining comfort.
Result: controlled noise level on the terrace and no vibrations transmitted to adjacent rooms.
Indoor commissioning: comfort and diffusion
The interior (wall) head is positioned opposite the living area. We adjust:
-
Vertical sweep for gentle mixing without drafts on the sofa.
-
Instructions adapted to habits: 23–24°C in air conditioning in hot weather; 20–21°C in heating to maximize the SCOP .
-
Weekly programming to reduce power demands during Hydro-Québec peaks.
Defrosting and water management in winter
Defrosting is a normal cycle: the machine temporarily reverses the flow to melt the ice. High-rise installation:
-
Prevents ice from trapping the base of the unit.
-
Promotes flow without accumulation on the sidewalk.
-
Limits splashes on the patio door thanks to the positioning and natural slope of the facade.
Measured results and expected gains
After balancing and testing:
-
Uniform temperature on the ground floor; better distribution towards the staircase.
-
Estimated 25-40% reduction in heating costs compared to electric baseboard heaters, depending on winter severity.
-
Better controlled humidity in summer thanks to low speed modulation which extends the time the air spends on the evaporator.
HVAC Maintenance: What Prolongs Performance
To maintain effectiveness and warranty:
-
Clean the inner head filters every 4 to 8 weeks during peak season.
-
Gently rinse the external battery in spring and fall (low pressure).
-
Inspect the capping and UV insulation once a year.
-
Have an annual AirGreen HVAC maintenance carried out: pressure checks, electrical measurements, verification of supports and defrost flow.
Grants and Eligibility
High-performance R-32 wall-mounted heat pumps are generally eligible for provincial programs (including Efficient Heat Pumps ). We support our clients in evaluating the equipment, proving performance and preparing the file, whether you are in Montreal , Laval , Longueuil , on the North Shore or the South Shore .
Pitfalls to avoid when installing on a brick facade
-
Undersizing the brackets or using anchors that are unsuitable for the brick: risks of noise and subsidence.
-
Ignoring the required clearances around the front grille: reduced performance and too frequent defrost cycles.
-
Forget the slope of the drilling: water stagnation in the sheath in summer.
-
Neglect the night profile : a simple speed limit avoids noise pollution.
Why AirGreen for your HVAC system?
Our HVAC installations combine load calculation, selection of suitable heat pump equipment, thoughtful installation (wall, slab, roof, balcony), electrical compliance and meticulous commissioning . We respond quickly in Laval , Montreal intramural , Longueuil , North Shore and South Shore , with attentive after-sales service and HVAC maintenance contracts that secure your energy savings.
Construction site technical sheet (summary)
-
Type : 1-zone wall-mounted heat pump , R-32 refrigerant
-
Brand : Fujitsu AIRSTAGE (high-performance wall-mounted range)
-
Target capacity : 12–15 kBTU/h (depending on calculated load)
-
Installation : brick facade, wall brackets with anti-vibration pads , high anti-snow position
-
Route : direct drilling, connections ≈ 2–3 m, discreet external capping , gravity drain
-
Electrical : dedicated circuit + waterproof disconnection nearby
-
Objectives achieved : four-season comfort, silence, performance in extreme cold , clean and sustainable integration
Need a similar solution in Sainte-Rose , Chomedey , or elsewhere in Greater Montreal ? We offer clear quotes, fast planning, and careful installations tailored to your home's architecture and the reality of our winters.
The job tools
Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.
Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.
How the job unfolds
The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.
We look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.
Model, capacity and price, in writing. We also check whether the model qualifies for assistance programs.
Floors and furniture protected, wall plate position marked level, wall opening located.
A single opening, with the slope the drain needs to flow outside.
Set on a stand raised above the snow, with the clearances the manufacturer requires.
Connected, insulated and protected. The opening is then sealed against water, cold air and insects.
A dedicated circuit and an accessible disconnect near the outdoor unit.
Leak test, vacuum, then start-up and a check of heating and cooling.
Remote, modes, filters: we show you the essentials before we leave.
- The on-site estimateWe look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.
- The quoteModel, capacity and price, in writing. We also check whether the model qualifies for assistance programs.
- Getting readyFloors and furniture protected, wall plate position marked level, wall opening located.
- The wall openingA single opening, with the slope the drain needs to flow outside.
- The outdoor unitSet on a stand raised above the snow, with the clearances the manufacturer requires.
- Lines, cable and drainConnected, insulated and protected. The opening is then sealed against water, cold air and insects.
- The electrical workA dedicated circuit and an accessible disconnect near the outdoor unit.
- Tests and start-upLeak test, vacuum, then start-up and a check of heating and cooling.
- The walkthroughRemote, modes, filters: we show you the essentials before we leave.
What we check on a job like this one
Each number is a point we check on site. Switch between summer and winter to watch air and heat move.
In summer, the outdoor unit rejects the house's heat outside.
Generic illustration of this type of installation, not a survey of this job site. Tap a number.
Mounted level on a wall plate, high enough for the air to reach the whole room, with enough space around it to slide the filters out easily.
The refrigerant lines, the communication cable and the drain go through the wall in a single opening, sealed against water, cold air and insects.
Two insulated copper pipes connect the two units. Outside, a line cover can protect them from sun, knocks and weather.
A shut-off switch near the outdoor unit isolates it safely for service. It must stay accessible at all times.
The compressor and the fan. In heating mode it captures heat from the outdoor air, even in winter, and moves it inside.
On the ground or on the wall, it keeps the unit above accumulated snow. The unit stays clear and defrost water can drain away.
The fan needs to blow freely. Storage, a fence or a wall too close, and efficiency drops while noise goes up.
Is your home ready?
Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.
Good habits, once the unit is in place
Six simple habits that keep the unit going. Your list stays on this device.
What to do, season by season
Three habits per season for this unit. They take a few minutes and prevent many calls.
- Clean the indoor unit's filters.
- Clear leaves and debris left on the outdoor unit by winter.
- Test cooling before the first hot days.
- Clean the filters more often when the unit runs a lot.
- Keep plants away from the outdoor unit.
- Check that no water drips from the indoor unit.
- Rake the leaves around the outdoor unit.
- Test heating before the first cold days.
- Book periodic maintenance before winter.
- Keep snow away from the stand and the front of the unit.
- Let the unit defrost: it is normal.
- Never hit the ice on the fins; call us if the unit stays iced up.
The right pages, at the right time
Four statements: true or false?
It all comes down to details you have just seen.
1. In heating mode, the outdoor unit can produce water.
During defrost cycles. That water must drain away without forming ice.
2. You pick the capacity with a simple square-footage rule.
Windows, insulation, orientation and how the room is used all count. Capacity is chosen on site.
3. A multi-zone connects several indoor heads to a single condenser.
One head per room, all on the same condenser. Each room keeps its own temperature.
4. The disconnect can sit behind the patio furniture.
It must stay accessible: it is what shuts the unit off for service.
0 / 4 right answers
What people ask us about this kind of work
Does a wall-mounted heat pump heat in winter?
Wall-mounted or multi-zone: how do I choose?
Where does the outdoor unit go?
Are there grants?
Do I need a permit?
How cold can it heat?
How much can I save?
How is the LogisVert assistance calculated?
Is it noisy?
The outdoor unit is covered in ice: is that normal?
Does AirGreen hold the required licences?
Is the estimate free?
No question matches. Write to us: we answer.
More jobs to see, near you
By town, by equipment or by region: browse more than 4,700 published projects.
Each dot: a town where AirGreen has published projects. The glowing dot: this job.
An on-site estimate, the right capacity, the right equipment.
The on-site estimate is free and the quote follows within 24 hours.
Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).
